HomeMy WebLinkAboutC100 Rev 4-28-21SOILS
SCALE: 1"
= 100, 1
MAP
OPERATING AUTHORITY - CITY OF CARMEL, IN
UTILITIES — CARMEL
PERMITS
Carmel DOCS
One Civic Square
Carmel, IN 46032
Rachel Keesing — (317) 571-2417
STREETS & STORM SEWER
Carmel Engineering Dept.
One Civic Square
Carmel, IN 46032
Alex Jordan — (317) 571-2441
FIRE
Carmel Fire Department
Two Civic Square
Carmel, IN 46032
Chris Ellison — (317) 571-2600
SANITARY SEWER
TriCo
7236 Mayflower Park Drive
Zionsville, IN 46077-7906
Ryan Hartman — (317) 844-9200
WATER
Citizens Water Company
1220 Waterway Boulevard
Indianapolis, IN 46206
(317) 263-6319
GAS
VECTREN ENERGY
P.O. BOX 1700
Noblesville, IN 46061
Chad Miller — (317) 776-5590
WATER
Carmel Water
30 W. Main Street, Suite 220
Carmel, IN 46032
John Duffy — (317) 571-2443
ELECTRIC
Duke Energy
16475 Southpark Dr.
Westfield, IN 46074
Matthew Doyhuff — (317) 896-6704
TELEPHONE
AT&T
240 N. Meridian Street
Indianapolis, IN 46204
Brian Wente — (317) 610-5440
CABLE TV
Spectrum
3030 Roosevelt Avenue
Indianapolis, IN 46218
Jason Kirkman — (317) 429-6691
Utility Hotline: within Indiana 1-800-382-5544
outside indiana 1-800-428-5200
NOTE
The size and location of utilities are per plans and locations provided by the
respective utility companies. All utility companies shall be notified prior to any
excavation for field location of services.
NW 1/4 SEC. 2-Tt7N-R3E
PENNWOOD PROFESSIONAL
OFFICE PARK
PZ-2020-0021 0 D P AMEND / AD LS AMEND
11585 N. PENNSYLVANIA STREET
CARMEL, INDIANA
CONSTRUCTION PLANS
DEVELOPER:
SC BODNER COMPANY, INC.
9075 N. MERIDIAN ST., SUITE 250
N D IANAPO L I S, IN 46260
317-536-2000
Fax-536-2550
Contact: STEVE BODNER
email: steve@scbodner.com
ENGINEER:
ROGER WARD ENGINEERING, INC.
6555 CARROLLTON AVENUE
INDIANAPOLIS, IN 46220
317-251-1738
Fax-251-1923
Contact: ROGER WARD
email: rward@rw-engineeering.com
SITE MAP
SCALE : 1" = 100'
INDIANA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS
REVISIONS LATEST EDITION TO BE USED WITH THESE PLANS INDEX
DATE:
DESCRIPTION
01
04
21
REV
C100,
Cl-C103, C105-C802, C902, L101, LP1
ADD
C803
01
22
21
ADD
C101 A
03
19
21
REV
C100,
Cl-C103, C601, C802, C803, LP1
ADD
C804
04
12
21
REV
C102
04
28
21
REV
C102,
C601, C802
SHEET
No.
DESCRIPTION
C100
COVER SHEET
2 OF 2
ALTA ACSM LAND TITLE SURVEY BY OTHERS
C1
EXISTING CONDITIONS & SITE DEMOLITION PLAN
C101 A
SITE PLAN
C101
SITE UTILITY PLAN
C102
GRADING & DRAINAGE PLAN
C103
SWPP PLAN
C104
SWPP DETAILS
C105
SWPP SPECIFICATIONS
C601
STORM SEWER PLAN & PROFILE
C801-C804
CONSTRUCTION DETAILS
C901
SPECIFICATIONS
C902
CARMEL CONCRETE CURB AND PAVING POLICY
1_101-1_102
*LANDSCAPE PLAN
LP1
*SITE LIGHTING PLAN BY OTHERS
*(NOT PART OF CARMEL ENGINEERING REVIEW
�1 IS T E'
E 1 I bkV
The WOteFVzOFk
r3 F 11 1lFi s�
Q6
E I P!
9
C
0
3
AREA
MAP.
SCALE: N.T.S.
DEVELOPMENT AND CONSTRUCTION NOTES
• BUILDING GROSS SQUARE FOOTAGE = 27,323 SF
• SITE AREA = 3.77 AC+/-
• ZONING = B-5
• FRONT SETBACK = 15 FT
• SIDE SETBACK = 5 FT
• REAR SETBACK = 30 FT
• % LOT COVERAGE = 2.23/ 3.77 = 59.2%
• DISTURBED AREA = 2.81 AC
• NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN INDIVIDUAL LOT
PERMIT.
• IF IT WILL BE NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OF
SUCH RELOCATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. ALL
UTILITY POLES SHALL BE LOCATED WITHIN ONE FOOT OF THE PROPOSED
RIGHT-OF-WAY.
• ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSS
THE FRONTAGE OF THIS DEVELOPMENT ARE INDICATED ON THE PLANS.
PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACE ANY DRAINAGE
STRUCTURES AND BRIDGES AS NECESSARY OR AS REQUESTED BY THE CITY TO
ACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES, MULTI -USE PATH,
AND ANY OTHER REQUIRED IMPROVEMENTS TO THE PROPERTY OR THE
ROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES
AND BRIDGES WILL BE BORNE BY THE DEVELOPER.
• ALL PAVING WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY SHALL
CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE
CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO
SCHEDULE A PRE -CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S
CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS,
REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW
THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE
EXISTING AND PROPOSED RIGHT-OF-WAY.
/fi
/ cor 60Vq
CERTIFIED BY: ROGER C. WARD, JR., P.E.
THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED
HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF ROGER WARD
ENGINEERING AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE OR IN
PART, WITHOUT THE WRITTEN CONSENT OF ROGER WARD ENGINEERING.
2020, ROGER WARD ENGINEERING, INC.
�^ <
F-1 Z
w_j
J
Z
Z
O
Z
W ~
Z
w W
0
0
NO
o>W W Q
nM
0 aQN
o
U
U) Z>X
z"0J��
J
T .�
�wz
WO
M
U Z N
� � Q ti 3
Z 0
Q � z
J
.' W
W
z
Z
W
J
U
W
W
U)
W
0
U
O
0
O'NCl
}o�
Z�w
� 6i
�Qww
J >X
0 0 L.�
Z
W
oci
U Z
Q W
W0
U
d U
O �
Z N
0 W
W
p O
Z¢¢
N N
\\
M
w cI cI I I
C4 1-i �
J w
a w
z
O �
� Y Q Z
W 0� Z Q
� J Z
� V � w
��z�
OOaQ
• U
Z Z
Z 00
`�
W LO
0\\\1IIIII////�
.0 GISTE,'?'
No.
PE19800489
-o = STATE OF
0 ND I ANP,G�����`
'/, S;0NAL0E0��`
BY:
DATE: 1 1 /06/20
1EET C0
OF
19
JOB#: SCB.002