HomeMy WebLinkAboutPennwood Civil Sheet 01 - C1009885101212961010646PENNWOOD PROFESSIONALCONSTRUCTION PLANS11585 N. PENNSYLVANIA STREETCARMEL, INDIANADEVELOPER:ENGINEER:ROGER WARD ENGINEERING, INC.6555 CARROLLTON AVENUEINDIANAPOLIS, IN 46220317-251-1738Fax-251-1923Contact: ROGER WARDemail: rward@rw-engineeering.comDEVELOPMENT AND CONSTRUCTION NOTESC100JOB#: SCB.002COVER SHEET
DATE: 11/06/20
DRAWN BY: RCW
(317) 251-1738 (FAX) 251-1923
INDIANAPOLIS, INDIANA 46220
6555 CARROLLTON AVENUE
www.rw-engineering.com
CIVIL ENGINEERS - LAND SURVEYORS - DEVELOPMENT CONSULTANTSBY:11585 N. PENNSYLVANIA STREET
PENNWOOD PROFESSIONAL
CARMEL, INDIANA19OFFICE PARK OFFICE PARKSC BODNER COMPANY, INC.9075 N. MERIDIAN ST., SUITE 250INDIANAPOLIS, IN 46260317-536-2000Fax-536-2550Contact: STEVE BODNERemail: steve@scbodner.comOPERATING AUTHORITY - CITY OF CARMEL, IN·BUILDING GROSS SQUARE FOOTAGE = 27,323 SF·SITE AREA = 3.77 AC+/-·ZONING = B-5·FRONT SETBACK = 15 FT·SIDE SETBACK = 5 FT·REAR SETBACK = 30 FT·% LOT COVERAGE = 2.23/ 3.77 = 59.2%·DISTURBED AREA = 2.81 AC·NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN INDIVIDUAL LOTPERMIT.·IF IT WILL BE NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OFSUCH RELOCATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. ALLUTILITY POLES SHALL BE LOCATED WITHIN ONE FOOT OF THE PROPOSEDRIGHT-OF-WAY.·ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSSTHE FRONTAGE OF THIS DEVELOPMENT ARE INDICATED ON THE PLANS.PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACE ANY DRAINAGESTRUCTURES AND BRIDGES AS NECESSARY OR AS REQUESTED BY THE CITY TOACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH,AND ANY OTHER REQUIRED IMPROVEMENTS TO THE PROPERTY OR THEROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURESAND BRIDGES WILL BE BORNE BY THE DEVELOPER.·ALL PAVING WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY SHALLCONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THECONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TOSCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'SCONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS,REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEWTHE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THEEXISTING AND PROPOSED RIGHT-OF-WAY.PZ-2020-00210 DP AMEND / ADLS AMEND