Loading...
HomeMy WebLinkAboutPennwood Civil Sheet 04.1 - C101A9885101212961010646C101AJOB#: SCB.002SITE PLAN DATE: 11/06/20 DRAWN BY: RCW (317) 251-1738 (FAX) 251-1923 INDIANAPOLIS, INDIANA 46220 6555 CARROLLTON AVENUE www.rw-engineering.com CIVIL ENGINEERS - LAND SURVEYORS - DEVELOPMENT CONSULTANTS11585 N. PENNSYLVANIA STREET PENNWOOD PROFESSIONAL CARMEL, INDIANA19OFFICE PARK WDAMAGE TO THE EXISTING RIGHT-OF-WAY SHALLBE RESTORED/REPAIRED TO THE SATISFACTIONOF THE CITY AT THE COMPLETION OF THEPROJECT. THE CONTRACTOR IS ENCOURAGEDTO INSPECT THE RIGHT-OF-WAY WITH THE CITYPRIOR TO THE START OF THE CONSTRUCTIONTO DOCUMENT THE EXISTING CONDITION OF THERIGHT-OF-WAY.BUILDING GROSS SQUARE FOOTAGE = 27,248 SFSITE AREA = 3.77 AC+/-ZONING = B-5FRONT SETBACK = 15 FTSIDE SETBACK = 10 FTREAR SETBACK = 30 FT% LOT COVERAGE = 2.23/ 3.77 = 59.2%ON-SITE PARKING REQUIRED:1 SPACE PER 250 SF OF FLOOR AREAFLOOR AREA = 27,248 / 250 = 109 SPACES REQ'DON-SITE PARKING PROVIDED:STANDARD SPACES = 109ACCESSIBLE SPACES = 6TOTAL: 115 SPACES PROVIDEDDEVELOPMENT SUMMARY