Loading...
HomeMy WebLinkAboutElevationsAll Contractors are required that their materials, sizes, construction methods and labor forces meet all state, county and local codes. These design requirements are to take precedence over the project specifi- cations and drawings - written or implied. Verify all dimensions prior to construction. Contractor's are responsible for the accuracies and correctness of these conceptual drawings whether for new and/or existing construction. Copyright 2022, All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording or by any information retrieval system without the permission of the copyright owner. Any unauthorized users will be prosecuted to the fullest extent of the law including any legal fees incurred by the copyright owner. EIE�&g f LF_V""t i 7 N Ir1' J�L5vn�"ON 0 All design data, details and layouts included and implied within the contents of the submitted drawingsiare to by The Singh Residence Date: Dec. 12, �22 subject verificaton the Builder/Owner. The draftsman will not be held liable based Eaton Stipp Custom Homes upon inaccurate and/or unk- nownedwithint these provided within these Drawn by: conceptual drawings. 1990 -2022 All Rights 8677 Bash Street Indianapolis, IN 46256 reserved Scale: As noted