Loading...
HomeMy WebLinkAbout06100081 Sewer CLAY TOWNSHIP REGIONAL WASTE DISTRICT SANITARY SEWER PERMIT ;~' [ ] Conditional Permit [x] Final Permit INDIVIDUAL LOTS/EXISTING BUILDINGS Project Title: Primary Location: Village of WestClay sec 5002 Owner/Builder: Lot# 545 Dale Woodall Construction Services . /30/1 Street address:~ Chew St I~ ~ .o~ '*' Zip: 46032 -__ County:..Hamilton .f Cily: . CarmeL Interceptor Charges Paid: PRI: EDU Fee:1650.00 Application fee: 100.00 PLEASE NOTE: Installation of building sewer shall be per the specifications of the Clay Township Regional Waste District (see reverse) and any conditions noted below. All installations shall be inspected by District personnel during "open trench" phase and before backfilling with stone to six inches above the pipe. NO footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter the District's sanitary sewer system. The District will assume no liability for drains which are below the Qrade leyel of the nearest downstream manhole nor for laterals which are extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be responsible for damages to the District's sewer system. This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the building site which is the subject of this permit. Inspections by the District are MANDATORY and shall be arranged by contacting the District's office at 844-9200 24 hours in advance. All new construction will be placed on billing six months after connection has been made or when water is connected, whichever comes first. V'-Z..-fhe District reserves the right to inspect all sump pump connections to ensure no illegal connections have been made. 0U<-'(have received a copy of Ordinance No. 9-13-99 and agree to follow all District st~ndards. Building has a [ ] crawl space [ ] slab or [x ] basement that [x ]will be finished with grinder pump installed t6 comply with elevation requirements [ ]rough-in plumbing with Qrinder pump installed during construction, [ ] rough-in plumbing only and Qrinder pump will not be installed during construction, [ ] no plumbing in th~ement. (Please check appropriate box.) rp Manholes shall remain accessible at all times. If a manhole is buried, it shall be the builder/homeowner responsibility to co~rect per District standards. Ir.TION / RELEAS~D ,:.-.", "n"~T!R ~. . " . . . .' . . . ...:1 ;':";-'(lgt 'pt~ons Conditional Permit Terms: Subject Ie. ,o~,,'nl'C",O "'.':: ':-,..- [ ] NO CONNECTION to the sewer until further notification. or o:\:. >~ ;"i c. .c.,";;.,' ,,,.a,,"" [ ] Certificate of Insurance must be on file with CTRWD lisoos-ceriificateholderi'\"\~TY S;':;RViC:r::.S [ ] 48 hours notice before work starts on manhole core d~IiQg: or cuts of active!.~n~s.:U\ Y TOWNSHIP and District inspector must inspect all work before co}eMcf. V' --.. '-'j ., NA [ ] All District fees will be paid in ~ull. II~U jo\ [ ] Approval pending Districts review of plans. [ ] Copies of approved permits from appropriate county or city agencies for work in the right-of-way road cuts or are required. [ ] No occupancy until further notification [ ] All Conditions have been met and final permit issued 2006. By signing below, I attest that I am familiar with the District's specifications and agree to accept responsibility fo[> all work done under this permit. \ (\,. 547-1944 ~J." C ~~ Builder/Owner Signature Phone v,\.o w)<"k" . Printed Name ~ ,...~ . , Permit issued this 10th day of October, 2006. ~ 2 site plans submitted ~ CTRWD ~, t.> Please note chanQes on lateral specification as of Januarv 2006. If . ~'.r. ~ .'>7,0 ,,1'- Permit valid only with CTRWD seal in red ink. .'/EG/ONAl'lll' Permit-rev.05-0S-D6ef