HomeMy WebLinkAboutOverview Design Narrative7/20/2022 PRELIMINA RY 11 39 39 39 22 ADLS UPDATE & ROOF ROOFTOP REVISION 2022-09-01 PRELIMINARY 616 11 GUEST ROOM MATRIX PRELIMINARY 9/1/2022 TOTAL KEYS FLOOR AREA STORY HEIGHT HT ABV GRADE KING KING ADA TOTAL DQ DQ ADA TOTAL HS HS ADA TOTAL X TOTAL 1 17,500 16 1 10 1 11 0 0 0 0 0 0 0 0 11 1 2 19,100 10.5 17 16 1 17 21 1 22 0 0 0 0 0 39 2 3 19,100 10.5 27.5 16 1 17 21 1 22 0 0 0 0 0 39 2 4 19,100 11.67 38 16 1 17 21 1 22 0 0 0 0 0 39 2 5 *17,100 11.67 49.67 15 1 16 6 0 6 0 0 0 0 0 22 1 HOTEL 91,900 73 5 78 69 3 72 0 0 0 0 0 150 8 *Excludes 2,000 sf of covered exterior patio 52.0%48.0%0.0% TOTAL ADA KING DOUBLE QUEEN HOSPITALITY OTHER 2022-07-20 2022-09-07 ADLS UPDATE 1 DOCKET NUMBER PZ-2022-00149 DP/ADLS 16 Construction Start is anticipated to be Spring of 2023.