Loading...
HomeMy WebLinkAboutDrainage Waiver 05-09-23 kimley-horn.com 250 East 96th Street, Suite 580, Indianapolis, IN 46240 317 218 9560 May 09, 2023 Mr. John Thomas City of Carmel Engineering Department RE: BJ’s Wholesale Club at Greyhound Commons – Drainage Waiver Requests Members of the Board, On behalf of our Client, we respectfully request waiver from the following Drainage Standards. 1. §104.02 – Finished floor elevation or the lowest building entry elevation shall be no less than 6 inches above finished grade around the building. Also, the building’s lowest entry elevation that is adjacent to and facing a road shall be a minimum of 12 inches above the road elevation. We are requesting that the minimum finished floor elevation shall be permitted as lower than the road elevation due to existing elevation of Lowe’s Way. 2. §303.06.11 – Detention basins shall be designed with additional ten (10) percent of available capacity to allow for sediment accumulations resulting from development and to permit the pond to function for reasonable periods between cleanings. We are requesting a waiver for the above referenced requirement as the provided hydrodynamic separators and detention treatment rows will reduce sediment accumulation within detention chambers. If you have any questions, please do not hesitate to contact me at (317) 218-9560 or connor.strege@kimley-horn.com. Sincerely, Connor Strege, P.E. Project Engineer