HomeMy WebLinkAbout06100186 Sq. Ft.
k. All sidewalks and driveways
I. Sewer and water lines, septic system, (tanks & filed system) and/ar welllacatians
m. Drainage flaw arraws
n. All drainage swales and subsurface facilities (retentian / detentian areas, etc...)
a. Sump pump -- Shaw sump pump pit(s) and discharge line lacatlans
p. Geathermal heat pump discharge locatians
*NOTE: If land is not within a platted subdivision, a legal description is required.
>
,
FURTHER NOTES / NOTICES:
> CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): "The Director shall approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written application form and accompanying
materials. The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and
its location conform in all respects to this ordinance."
> IN ADDmON TO THE A80VE-USTED SU8MmAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED.
> ADDmONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE SUBMmED PLANS ARE NOT OF SUFFICIENT IN CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT.
OF THE WORK PROPOSED AND-TO DETERMINE COMPUANCE WITH ALL APPUCABLE CODES AND ORDINANCES.
SUBMmAL OF ADDmONALL Y REQUESTED/REQUIRED INFORMATION, AFTER THE INmAL SUBMmAL, WILL
. EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW.
> THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE UNOCCUPIABLE. UNFINISHED SPACE. IF AN AREA SO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA AFTER THE .
ISSUANCE OF THE PERMIT, THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
ALL CONSTRUCTION IS SUBJECT TO FIELD INSPECTION, AND SHOULD NOT BEGIN PRIOR TO THE
ISSUANCE OF THE BUILDING PERMIT. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED,
INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginning prior to obtaining
a building permit and/or proceeding with construction beyond the stage of a required inspection without approval
constitutes Late Fee penaities, per Z-2B9 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08.
BVILDiNG & CODE ENFORCEMENT; CITY OF CARMEL. One Civic 5'1.; Otrmel, IN 46032. ph. (317) 571-2444.
-
I, the undersigned, certify that all .of the abave listed infarmatian is shawn campletely and accurately an the
attached plat .or site plan(s), canstructian plans, and any ather submitted dacumentatian, submitted with the
building permit applicatian ta the City .of Carmel/Clay Tawnship Department .of Cammunity Services. I furtherl
certify that the jaining .of water supply piping shall be made with lead-free salders and fluxes. Failure ta comply
will result in a replacement .of the system. (Plumbing Cade P-S09-S) Under the penalties.of Perjury (Indiana I
Cade 35-44-2-1), I alsa hereby affirm, under .oath, that all .of the infarmatian 1 have pravided in the table belaw is
true and accurate, ta the best .of my knawledge and belief, and that I have nat knawingly .or intentianally
pravided .or .omitted any informatian that would tend t.o hide, .obscure, .or .otherwise mislead the Dept. .of
C.ommunity Services regarding the truth .of the matters addressed therein.
BASEMENT
(Finished and
Unfinished)
1st Floor
2nd Floor
3
Floor
Front
Porch
Rear
Porch .or
Sunro.om
Total Sq.
Ft. of
Garages
TOTAL
~:lg a;a J ;1
i~;) (]. B~NI~~-#o/r\D~~
A~PLI~NT'S SIGNATURE 0
lot<.; A. r,;RbSoJ\\('r - HiMJ,'klE.
NAME PRINTED
1
'-15' 7,;}1-/
().('~ .2~~ Joa.,
DA
S:Permits/FORMS/RESIDENTlAL PROCEDURES
20'2