Loading...
HomeMy WebLinkAboutCorrespondence for TAC l ~' March 2, 2007 ~% ])~cKt{ I 6& o~ (JD I tf: .. Mr. Jeff Eagle, VP Construction CI Winegardner & Hammons, Inc. 4243 Hunt Road Cincinnati, OH 45242 JAMES BRAINARD, MAYOR EL uf\JCS RE: Renaissance Hotel and Commerelal BuDding eonstnetioD plans-ProJeet Review #4 Dear Mr. Eagle: The City has received your comment letter and drawings dated February 22, 2007 based upon the City review of February 5, 2007. The comments from the City review have been satisfactorily addressed with the exceptions outlined below. Provided that the revisions below are made, the requisite number of plans may be submitted for approval. CONSTRUCTION DRAWING COMMENTS 1. "Notes" item 1 OD Sheets CG-IOl and CG-llO, the word "by" Is spelled ineorreetly OD Sheets CG-IOl aDd CG-llO. Please revise OD the plaDS submitted for approvaL 2. ThaDk you for adding Note 3 to Sheet CS-IOl. Please reword this Dote to cODform to the provided IaDguage OD the plaDS submitted for approvaL 3. On Sheet CS-IOI, CO-Ill, CU-IOI, and CR-IOI, the outline ofa sidewalk is shown within the 10-foot asphalt path. Also the outline of a sidewalk is shown crossing the concrete aprons at the entrances. On the plans submitted for approval, please eliminate the outline of the sidewalk from these sheets. Also please ensure that the widths of the A.D.A. ramps correctly match the 10-foot width of the asphalt path. On the drawings, currently the widths of the A.D.A. ramps match the 5- foot width of a sidewalk. These comments represent the Department of Engineering's fourth review of the construction drawings for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Department reserves the right to provide additional comments based on subsequent reviews. If you have questions, please contact me at 571-2441. DEPARTMENT OF ENGINEERING ONE CMC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAIL engineering@carmel.in.gov ~. .- , cc: Matt Griffin, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers Project File Engineering Department Review S:\PROJREY07\RENAlSSANCEHOTEL#S 701 Congressional Blvd. I Suite 260 Carmel, IN 46032 Ph. (317) 571-3420. Fax (317) 571-3421 www.driesenga.com DRIESENGA& ASSOCIATES, INC. Engineering · Surveying · Testing October 12, 2006 Amanda Foley, Storm Water Administrator City of Carmel Department of Engineering One Civic Square Carmel, IN 46032 RE: Renaissance Hotel and Commercial Building-Project Review #2 Dear Ms Foley: In response to your comment letter dated October 10, 2006, we submit for your review our response along with revised plans. BONDING REQUIREMENTS 1. The bond will be prepared and submitted through our Client. STORMW ATER QUALITY REVIEW COMMENTS-CONSTRUCTION PLANS B2. Sequence describing storm water quality measure implementation relative to land disturbing activities Separate Pre-pavement (CG-llO) and Post Pavement (CG-1l1) Storm Water Pollution Prevention Plans were added and the reference to swales in the sequencing were removed except for the temporary swale discharging from the southwest silt basin. B4. Sediment control measures for sheet flow areas Silt fence was removed from the north perimeter. However it was retained along the toe of the proposed slope along south parking lot. Diversion berms were ad<;l.ed to direct the flow into the temporary silt basins. B5. Sediment control measures for concentrated flow areas The silt basin and rock check dam at the southwest comer was moved away from the tree preservation area. A temporary swale was added to drain the basin to the exiting outfall. The silt basin and rock check dam at the northeast comer is located around an exiting pie and is not in the tree preservation area. Therefore its location remains per plan. B6. Sediment control measures for storm sewer inlet protection Beehive inlet protection was modified to be the basket type inlet protection and not the coconut erosion control log as previously specified. C4. Location, dimensions, specifications, and construction details of each storm water quality measure. Catch Basin Insert details were added on Sheet CG-502. Holland . Grand Rapids 0 Spring Lake . Kalamazoo 0 Cadillac 0 Indianapolis .. :.i" ~ It> C5. Description of maintenance guidelines for post construction storm water quality measures Weare working with Lange Industries to prepare the 0.& M manual for the inserts and will be submitted separately with the Owner Acknowledgement form. The additional BMP will be included with the pond in the Pannatoni Development along with the 0& M manual. As we discussed yesterday, please fmd attached Sheets CG-llO, CG-ll1, CG-501 and CG-502 to review the modifications made to the plans per the comments. If you have questions, please feel free to contact me at 571-3420. Sincerely, Michael K. Ten . Senior Project Manager cc: Jeff Eagle, W & Construction, wlo encl. Gary Duncan, City of Carmel Department of Engineering, wlo encl Matt GriffIn, DOCS, wlo encl Scott Brewer, DOCS, wlo encl Driesenga & Associates, Inc. .:. , .'4' . _o'--'~'._- /; .2: RECEIVED AUG 2 1 ?OOfi ".- I // EL // August 16, 2006 JAMES BRAINARD, MAYOR Mr. Jeff Eagle, VP Construction Winegardner & Hammons, Inc. 4243 Hunt Road Cincinnati, OH 45242 RE: Renaissanee Hotel and Commerelal BuUdlng-ProJeet Review #1 Dear Mr. Eagle: We have reviewed the construction drawings submitted for this project for the August 16, 2006 Technical Advisory Committee meeting. We offer the following comments: GENERAL INFORMATION 1. The project site is currently within current City of Cannel Corporate Limits. 2. Jurisdictions: . Street and Right of Way - Pennsylvania Street/City Center (122M Street) Drive . Water-City of Cannel Utilities. . Sanitary Sewer-The project is within Clay Township Regional Waste District service area. . Stonn SewerlDrainage - City of Cannel. The Hamilton County Surveyor's Office has jurisdiction over legal drains and discharge to legal drains. 3. Board of Public Works and Safety Approval Requirements: . Water Availability approval: Water Availability Approval request to the Board is based upon EDU requirements as determined by the proposed use of the building. Water Connection Fees will be based upon EDU calculations. If entryway or other irrigation systems are planned, additional Water Availability Approval from the Board will be required and additional Water Connection Fees will be assessed based upon the size and usage of the system. . Commercial Curb Cut-Please provide 8~ x 11 exhibits to accompany the request for commercial curb cut approval. Include all pertinent data including radii, drive width at throat and street, opposing drives etc. . Temporary Construction Entrance-Board approval is required if the temporary entrance is located at a site other than the existing approved curb cuts. Please provide exhibits as detailed above, if applicable. . Open Pavement Cuts in dedicated streets. It appears that there will be several instances of open pavement cuts. . Secondary Plat approval if applicable. . Dedication of right of way if applicable. . Consent to Encroach Agreements for any permanent improvement to be installed within dedicated right of way and/or dedicated easements. I am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. Any slIbmlsslon to the Board rei/11M prior final approval by the CtII'1IU!l Clay Plan CommJaslon tl1ItVor the Board of Zoning Appeals and completion of review by the Technical DEPARTMENT OF ENGINEERING ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAIL engineering@carmel.in.gov ;' Advisory Committee. AU written requests to be plflce on the Board's agenda1lUlSt Include the fl/JProprlflte Docket Numbers and the date (or dates) 01 fl/Jprovtd by the Plan Commission and/or BZA. 4. TAC ReviewlDrawings submitted for approval: We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all issues have been resolved. The design engineer must certify all drawings submitted for final approval. This office will require a minimum of four-sets of approved drawings after all issues have been resolved and the construction drawings have been approved The drawings will be stamped as approved and signed by the City Engineer and by the Director of Carmel Utilities. The Developer/Owner will receive one-set which is to be maintained on the construction site at all times. Carmel Utilities will receive one set. The Engineering Department Construction Manager will receive one-set and one-set will be maintained in the Department of Engineering. Ifmore than the minimum of four-sets are requested to be approved, the additional sets (maximum total of two additional) must be submitted with the four required sets. s. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way and/or dedicated easements will require a Consent to Encroach Agreement between the OwnerlDeveloper and the City of Carmel. This Agreement requires Board of Public Works and Safety approval. 6. Please provide Carmel Utilities with all initial and subsequent drawings submitted for review. They will provide a separate review regarding these issues. Please submit to: Paul Pace, Water Distribution City of Carmel Water Utility 130 1st Avenue SW Carmel, IN 46032 7. Carmel Utilities subscnoes to "Holey Moley" who should be contacted for water main locations. 8. The following items are being included with this review. Please share this information with all appropriate entities to be involved in this project: . Equivalent Water User Contribution Multiplier. . Current Water Connection and Availability Fees. . Commercial Project Approval Procedures. . Performance Release Procedure. . Permit Data, Contacts, etc. . Commercial Permitting Procedures. BONDING REOUlREMENTS 9. Upon initial review, it appears the following bonding requirements may apply to this project: PerformancelMaintenance Guarantees This project may be required to provide Certified Engineer's Estimates and performancelMaintenance Guarantees for the following improvements: . Water Mains if applicable. . Perimeter concrete sidewalks/asphalt paths if applicable. . Perimeter road improvements ifrequested. . Erosion Control Provide detailed/itemized Certified Engineer's Estimates in the amount of 100% of the cost of labor and materials for the requested improvements. Provide individual Performance Guarantees in the amount of the Engineer's Estimates. When the improvements have been constructed and accepted and the Performance Guarantee is released by our BPWS, 3-Year Maintenance Guarantees will be required in the amount of 15% of the Performance amount for streets and curbs and 10% of the Performance amount for all other improvements. Street CutlRight of Way Permit and Bonding Requirements Any work in the dedicated right of way of Pennsylvania Street will require a Right of Way Permit. If the work is included in the scope of work of a required Performance Guarantee, a separate License and Permit Bond will not be required. If the work is not included in a Performance Guarantee, a License and Permit bond will be required. The bond amount will be determined by the number of instances of work in the right of way @ $2,000.00 per instance. ODell Davement cuts In dedicated stre_ reaulre fUJDroval bv our Board of Public Works and Safetv. Please contact Fred Glaser, Department of Engineering Right of Way InspectorlManager for details regarding this issue. 10. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. We will share Crossroad's comments as they are received. When construction plans are submitted for review for this development, please provide a set of drawings and drainage calculations directly to Crossroad. Contact Amanda Foley, City of Carmel Storm Water Administrator, regarding bonding requirements for erosion control. AVAILABILITY AND CONNECTION FEES 11. Water Availability (acreage) Fees are required to be paid after Engineering Department approval of the project's construction plans and prior to obtaining a Building Permit. Availability Fees are based upon total platted acreage or legal description acreage at the current rate ofSl,OlO.oo per acre, subject to future revisions. Based upon the legal description on the plans, the preliminary Water Availability Fee calculation is: 7.96 Acres @ $I,OIO.OO/Acre = $8,039.60 or $8,040.00 12. Water Connection Fees are required to be paid after Engineering Department approval of the project's construction plans and prior to obtaining a building permit. Connection Fees are based upon the EDU calculation of the proposed usage of the building at the current rate ofSl,31O.00 per EDU, also subject to future revisions. Please provide this office with a detailed list of the various uses planned for these buildings. It appears that the following uses may apply: . Bars & Cocktail Lounges - 0.10 EDU/Seat . Retail Space - 1.0 EDUIl 000 ft2 . Hotels - 0.50 EDU/Room . Office - 0.50 EDUIlOOO ft2 . Restaurant - 0.10 EDU/Seat . Swimming Pools - 1.60 EDUIlOOO ft2 . Barber Shop - 0.30 EDU/Chair . Beauty Shop - 0.90 EDU/Chair If an irrigation system Is plll1med for this development, additional Water Connection Fees wUl be assessed based upon the recommendations of the Director of Camel UtUltles. CONSTRUCTION DRAWING COMMENTS A seven-page Plan Certification Form is enclosed with this letter. This form was created with the desire and intent to streamline the plan review process. We request that you please complete this form and return the original of this form along with complete 24" x 36" civil drawings to the Department of Engineering as soon as possible. Comments will be generated after the Plan Certification form is returned. Please treat each item on the form as a requirement of the Department of Engineering. Providing a "no" or "N/A" response to any of the items does not relieve the Developer of the responsibility of meeting the requirements of the Department of Engineering. The Department of Engineering will make the final determination as to the acceptability of any "no" or ''N/ A" responses. 13. Any off-site easements necessary for installation of utilities and storm drainage must be secured prior to the Department of Engineering approving the drawings. 14. All paving within the existing and proposed City right-of-way shall conform to the requirements of the Department of Engineering. Please add a note to the drawings that the Contractor shall contact the Department of Engineering to schedule a pre-construction meeting to review the Department's construction requirements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the Department as it relates to work within the existing and proposed City right-of-way. 15. Please contact Crossroad Engineers to obtain drainage review checklist for consideration in developing construction plans and that design effort. 16. ADA ramps are required at all locations where the sidewalks or asphalt paths cross the streets. 17. Please delineate any curb cuts on the plan for sawcut, removal, and replacement. 18. An asphalt path is required along the entire Pennsylvania Street frontage, per the Alternative Transportation Plan. 19. Please add an Asphalt Path Detail that requires I inch HMA # II surface on 2 inches HMA #8 binder on 5 inches #53 stone, if applicable. 20. For sidewalk within the right-of-way, please specify the width of the sidewalks to be 5 feet. Please add the following notes to the sidewalk detail: "SPACING BETWEEN TRANSVERSE JOINTS SHALL NOT EXCEED 1.25 TIMES WIDTH," "SIDEWALK BUILT WITH DRIVEWAYS SHALL HAVE MINIMUM THICKNESS OF 6" OR THICKNESS OF DRIVEWAY, WHICHEVER IS GREATER," and "JOINTS SHALL BE TOOLED OR SAWED TO A DEPTH OF y.. THE SIDEWALK THICKNESS." 21. Please remove the LANDSCAPE PLAN sheet titles from the index on the cover sheet. The Engineering Department does not approve landscaping or landscaping plans and they should not be included in drawings submitted to Engineering for review and/or approval. 22. Please replace the STRAIGHT CONCRETE CURB DETAIL (5/C803) with the City of Carmel standard detail. 23. For subsurface drain within the right-of-way, please add the City of Carmel subsurface drain standard and add the note" ALL SUBSURFACE DRAIN TO BE DOUBLE WALL HANCOR ID-Q OR EQUIVALENT" in the vicinity of the subsurface drain standard. 24. Please indicate dedication of the Right-of-Way prescribed by the City's 20-year Thoroughfare Plan if the existing Right-of-Way is not ofsufticient width. 25. Please label and dimension the right-of-way of Pennsylvania Street. 26. Entrances with medians may be a maximum width of 46 feet. Each travel lane (on either side of the median) shall be a maximum of 18 feet wide and the median shall be a maximum of 10 feet wide. The north entrance is in compliance at the west end of the median, but the plans must be revised such that the east end of the median is in compliance. 27. As the drainage design progresses, the design shall accommodate detention volume for the fully developed site and for the fully developed thoroughfare plan right-of-way for the perimeter road frontages. This requirement shall apply regardless of watershed limits. Please provide adequately sized pipes to carry water from the street to the proposed ponds. Please confirm with the Pannatoni Development that they are accommodating this requirement. 28. This project is subject to the Carmel Stormwater Management Ordinance, which was adopted February 6, 2006. 29. All Pennsylvania Street drainage structures and bridges across the frontage of this development must be indicated on the plans and replaced or improved by the developer to accommodate the widening, auxiliary lanes, multi-use path, and any other required improvements to the property or the roadway. 30. On all sheets where the street name "122ud Streef' appears, please revise to "City Center Drive." 31. Please remove the graphic scale from all sheets. 32. Please provide a maintenance oftraftic plan. 33. Please include the note "THERE SHALL BE NO WATER VALVES OR MANHOLES WITHIN THE PAVEMENT, CURBS, OR SIDEWALKS, OR ASPHALT PATHS" on all appropriate sheets. 34. Ifit will be necessary to relocate existing utility poles, they must be relocated to within one foot of the proposed right-of-way. The expense of such relocation shall be borne by the Developer. 35. The Department requires that the construction drawings be developed in accordance with the City of Carmel digital submission standards and that all required submittals for primary plat, secondary plat, and construction drawings be made. The digital tiles must be submitted to the Department of Engineering prior to approval of the construction plans. 36. The City has adopted a new paving policy. Please revise any notes, specifications, and details to accommodate this policy. The language of this policy must be added to a specitication sheet on the plans. 37. The City has adopted a new curbing policy. Please revise any notes, specifications, and details to accommodate this policy. The language of this policy must be added to a specification sheet on the plans. 38. As discussed at the meeting, the City's Thoroughfare Plan requires construction of half of the improvements prescribed by the Thoroughfare Plan across the frontage. Typically, developers provide the money equal to the value of constructing these improvements to the City for deposit in the City's non-reverting Thoroughfare Plan fund. 39. Although not discussed at our meeting, the City is requesting right-of-way dedication for a future roundabout at the intersection of City Center Drive and Pennsylvania Street. This right-of-way shall be a 120-foot radius circle centered on the existing intersection of the centerline of City Center Drive and the section line. 40. As we discussed, the piping under Pennsylvania Street to discharge storm water runoff from the site into the Pannatoni Development must be sized to convey the 100-year storm without overtopping the roadway. 41. Thank you for indicating the construction of a left turn lane in the existing median for northbound traffic at the main entrance. 42. Please confirm with the Department of Community Services the need for internal vehicle connectivity to the north parcel for a future connection. 43. The Department understands that storm water detention and post construction storm water treatment is being provided off-site. 44. The portions of commercial driveways within the right-of-way shall be constructed of concrete and shall have a depressed curb along them to maintain drainage. These comments represent the Department of Engineering's initial review of the construction drawings for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. It is critical that our office be made aware of all modifications made on the plans being resubmitted, particularly if any such changes are considered ''new'' or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notifY us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Department reserves the right to provide additional comments based on subsequent reviews. If you have questions, please contact me at 571-2441. " cc: Matt Griffin, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Greg Hayes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers Project File Engineering Department Review S:\PROJREV06\RENAISSANCEHOTEL