HomeMy WebLinkAboutAvant 2 L300-L306 LP stamped approved revised Revision Date Description
01 01/05/2023 REQ'D EDITS; SHEETS REISSUED Date:11.23.2022 Job No:2020-1360 Drawn by:MA / BM Checked by:JM / BMConstruction Intent Plans for the
AVANT PH 2, Carmel, Indiana
Edward Rose Development Carmel, LLC
5825 Lawton Loop E. Dr. | Indianapolis, IN 46216
317-485-6900 | www.context-design.com0Scale 1" = 30'-0"60'30'15'PLANTING REFERENCE PLANL300North REFER TOSHEET L302REFER TOSHEET L301Outdoor AmenityArea. Refer to SheetL303Outdoor Co-workArea. Refer to SheetL304Refer toSheetL306Refer toSheetL305
(2) Zel-s(2) Gle-x(2) Car-b(4) Liq-s(10) Jun-s(4) Phy-d(4) Vib-b(5) Phy-d(5) Jun-s(6) Ile-v(9) Car-c(2) Que-x(1) Que-b(2) Gle-x(12) Ile-v(1) Zel-s(10) Ile-v(6) Jun-s(8) Ile-v(2) Zel-s(11) Cle-s(14) Thu-f(1) Que-b(3) Aro-m(5) Jun-s(5) Jun-s(5) Aro-m(3) Phy-d(6) Ile-v(14) Car-c(7) Car-c(6) Ile-v(4) Vib-b(8) Fot-g(2) Zel-s(2) Gle-x(2) Car-b(4) Liq-s(10) Jun-s(4) Phy-d(4) Vib-b(5) Phy-d(5) Jun-s(6) Ile-v(9) Car-c(2) Que-x(1) Que-b(2) Gle-x(12) Ile-v(1) Zel-s(10) Ile-v(6) Jun-s(8) Ile-v(2) Zel-s(11) Cle-s(14) Thu-f(1) Que-b(3) Aro-m(5) Jun-s(5) Jun-s(5) Aro-m(3) Phy-d(6) Ile-v(14) Car-c(7) Car-c(6) Ile-v(4) Vib-b(8) Fot-g(2) Zel-s(2) Gle-x(2) Car-b(4) Liq-s(10) Jun-s(4) Phy-d(4) Vib-b(5) Phy-d(5) Jun-s(6) Ile-v(9) Car-c(2) Que-x(1) Que-b(2) Gle-x(12) Ile-v(1) Zel-s(10) Ile-v(6) Jun-s(8) Ile-v(2) Zel-s(11) Cle-s(14) Thu-f(1) Que-b(3) Aro-m(5) Jun-s(5) Jun-s(5) Aro-m(3) Phy-d(6) Ile-v(14) Car-c(7) Car-c(6) Ile-v(4) Vib-b(8) Fot-g Revision Date Description
01 01/05/2023 REQ'D EDITS; SHEETS REISSUED Date:11.23.2022 Job No:2020-1360 Drawn by:MA / BM Checked by:JM / BMConstruction Intent Plans for the
AVANT PH 2, Carmel, Indiana
Edward Rose Development Carmel, LLC
5825 Lawton Loop E. Dr. | Indianapolis, IN 46216
317-485-6900 | www.context-design.comPLANTING PLANL301North 1.Refer to Project Manual for Planting Specifications and Topsoil requirements.Refer to Plant Schedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Ownerat any time. Landscape Architect to inspect all plant locations and plant bedconditions prior to installation. On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'AmericanStandards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALLREMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates withinfive (5) days after planting. Replace immediately with approved, specifiedmaterial.5.Plant counts indicated on drawings are for Landscape Architect's use only.Contractor shall make own plant quantity takeoffs using drawings,specifications, and plant schedule requirements (i.e., spacing), unlessotherwise directed by Landscape Architect. Contractor to verify bedmeasurements and install appropriate quantities as governed by plant spacingper schedule. Plant material quantities shown on plan are minimum quantities.Additional material may be needed to meet spacing requirements and fieldconditions.6.Seed all areas disturbed by construction activities that are not otherwise notedto receive pavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas tomeet Specifications. Contractor shall coordinate quantity and placement oftopsoil. Landscaper shall verify depth of topsoil prior to plant installation.(Refer to specifications for topsoil source and placement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for reviewand approval by the Landscape Architect. Any plant material installed in anincorrect location, by the judgment of the Landscape Architect, shall bereinstalled at the Contractor's expense.9.All plant beds shall receive 1-2" minimum of shredded hardwood bark mulch(unless otherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair all damagedutilities to Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project isfully accepted by the Landscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for aperiod of one calendar year after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances.Coordinate with the Owner to obtain any required permits necessary tocomplete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water formore than 24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimumprotected area shall include the full drip line of the canopy. NO constructionactivities, material storage, etc. may occur within that area. The Contractorshall ensure that no soil compaction or tree damage occurs in any Protectedareas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.NOTE:LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS ONSHEET L311 - SEE PLANTINGS DETAILS.0Scale 1" = 20'-0"40'20'10'GENERAL LANDSCAPE ANDPLANTING NOTESLawn;All Disturbed Areas unless Noted OtherwiseMATCHLINE - REFER TO SHEET L302MATCHLINE - REFER TO SHEET L302
OUTDOOR AMENITY AREA - REFER TOENLARGED PLAN ON SHEET L303OUTDOOR CO-WORKAREA - REFER TOENLARGED PLAN ONSHEET L304 REFER TOENLARGED PLANON SHEET L305 REFER TOENLARGEDPLAN ONSHEET L306
(1) Zel-s(2) Car-b(3) Que-b(5) Jun-s(6) Ile-v(5) Aro-m(6) Ile-v(5) Phy-d(5) Vib-b(5) Phy-d(4) Vib-b(2) Phy-d(3) Que-b(2) Liq-s(1) Zel-s(12) Ile-v(1) Zel-s(6) Jun-s(2) Gle-x(2) Gle-x(12) Ile-v(14) Thu-f(5) Jun-s(5) Phy-d(5) Vib-b(4) Vib-b(4) Phy-d(6) Jun-s(5) Aro-m(10) Jun-s(6) Ile-v(7) Car-c(6) Ile-v(8) Fot-g(1) Zel-s(2) Car-b(3) Que-b(5) Jun-s(6) Ile-v(5) Aro-m(6) Ile-v(5) Phy-d(5) Vib-b(5) Phy-d(4) Vib-b(2) Phy-d(3) Que-b(2) Liq-s(1) Zel-s(12) Ile-v(1) Zel-s(6) Jun-s(2) Gle-x(2) Gle-x(12) Ile-v(14) Thu-f(5) Jun-s(5) Phy-d(5) Vib-b(4) Vib-b(4) Phy-d(6) Jun-s(5) Aro-m(10) Jun-s(6) Ile-v(7) Car-c(6) Ile-v(8) Fot-g(1) Zel-s(2) Car-b(3) Que-b(5) Jun-s(6) Ile-v(5) Aro-m(6) Ile-v(5) Phy-d(5) Vib-b(5) Phy-d(4) Vib-b(2) Phy-d(3) Que-b(2) Liq-s(1) Zel-s(12) Ile-v(1) Zel-s(6) Jun-s(2) Gle-x(2) Gle-x(12) Ile-v(14) Thu-f(5) Jun-s(5) Phy-d(5) Vib-b(4) Vib-b(4) Phy-d(6) Jun-s(5) Aro-m(10) Jun-s(6) Ile-v(7) Car-c(6) Ile-v(8) Fot-g Revision Date Description
01 01/05/2023 REQ'D EDITS; SHEETS REISSUED Date:11.23.2022 Job No:2020-1360 Drawn by:MA / BM Checked by:JM / BMConstruction Intent Plans for the
AVANT PH 2, Carmel, Indiana
Edward Rose Development Carmel, LLC
5825 Lawton Loop E. Dr. | Indianapolis, IN 46216
317-485-6900 | www.context-design.com0Scale 1" = 20'-0"40'20'10'PLANTING PLANL302North 1.Refer to Project Manual for Planting Specifications and Topsoil requirements.Refer to Plant Schedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Ownerat any time. Landscape Architect to inspect all plant locations and plant bedconditions prior to installation. On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'AmericanStandards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALLREMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates withinfive (5) days after planting. Replace immediately with approved, specifiedmaterial.5.Plant counts indicated on drawings are for Landscape Architect's use only.Contractor shall make own plant quantity takeoffs using drawings,specifications, and plant schedule requirements (i.e., spacing), unlessotherwise directed by Landscape Architect. Contractor to verify bedmeasurements and install appropriate quantities as governed by plant spacingper schedule. Plant material quantities shown on plan are minimum quantities.Additional material may be needed to meet spacing requirements and fieldconditions.6.Seed all areas disturbed by construction activities that are not otherwise notedto receive pavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas tomeet Specifications. Contractor shall coordinate quantity and placement oftopsoil. Landscaper shall verify depth of topsoil prior to plant installation.(Refer to specifications for topsoil source and placement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for reviewand approval by the Landscape Architect. Any plant material installed in anincorrect location, by the judgment of the Landscape Architect, shall bereinstalled at the Contractor's expense.9.All plant beds shall receive 1-2" minimum of shredded hardwood bark mulch(unless otherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair all damagedutilities to Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project isfully accepted by the Landscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for aperiod of one calendar year after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances.Coordinate with the Owner to obtain any required permits necessary tocomplete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water formore than 24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimumprotected area shall include the full drip line of the canopy. NO constructionactivities, material storage, etc. may occur within that area. The Contractorshall ensure that no soil compaction or tree damage occurs in any Protectedareas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.NOTE:LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS ONSHEET L311 - SEE PLANTINGS DETAILS.GENERAL LANDSCAPE ANDPLANTING NOTESMATCHLINE - REFER TO SHEET L301
REFER TOENLARGEDPLAN ONSHEET L306Lawn;All Disturbed Areas unless Noted Otherwise
(1) Gle-i(69) Iri-c(10) Cle-s(51) Lir-s(4) Cle-s(6) Fot-g(1) Pla-x(1) Pla-x(1) Gyn-d(1) Gle-i(2) Zel-s(2) Gle-i(2) Car-b(86) Iri-c(5) Cle-s(55) Lir-s(15) Cal-d(5) Ile-v(6) Tax-m(6) Ile-v(30) Heu-a(33) Lir-s(40) Heu-a(4) Car-c(6) Spo-t(10) Sch-j(6) Spo-t(10) Sch-j(13) Spo-t(65) Ger ann(46) Ger ann(111) Ger ann(50) Heu-a(27) Ger ann(36) Heu-a(35) Ger ann(23) Heu-a(6) Sch-j(6) Cle-s(9) Sch-j(4) Cle-s(5) Pen-a(6) Cal-d(82) Heu-a(145) Lir-s(183) Iri-c(1) Zel-s(15) Pen-a(3) Sch-j(7) Sch-j(9) Pen-a(124) Lir-s(73) Heu-a(6) Sch-j(5) Ile-v(67) Lir-s(8) Ile-v(19) Pen-a(12) Sch-j(2) Cle-s(16) Hos-g(1) Gle-i(69) Iri-c(10) Cle-s(51) Lir-s(4) Cle-s(6) Fot-g(1) Pla-x(1) Pla-x(1) Gyn-d(1) Gle-i(2) Zel-s(2) Gle-i(2) Car-b(86) Iri-c(5) Cle-s(55) Lir-s(15) Cal-d(5) Ile-v(6) Tax-m(6) Ile-v(30) Heu-a(33) Lir-s(40) Heu-a(4) Car-c(6) Spo-t(10) Sch-j(6) Spo-t(10) Sch-j(13) Spo-t(65) Ger ann(46) Ger ann(111) Ger ann(50) Heu-a(27) Ger ann(36) Heu-a(35) Ger ann(23) Heu-a(6) Sch-j(6) Cle-s(9) Sch-j(4) Cle-s(5) Pen-a(6) Cal-d(82) Heu-a(145) Lir-s(183) Iri-c(1) Zel-s(15) Pen-a(3) Sch-j(7) Sch-j(9) Pen-a(124) Lir-s(73) Heu-a(6) Sch-j(5) Ile-v(67) Lir-s(8) Ile-v(19) Pen-a(12) Sch-j(2) Cle-s(16) Hos-g(1) Gle-i(69) Iri-c(10) Cle-s(51) Lir-s(4) Cle-s(6) Fot-g(1) Pla-x(1) Pla-x(1) Gyn-d(1) Gle-i(2) Zel-s(2) Gle-i(2) Car-b(86) Iri-c(5) Cle-s(55) Lir-s(15) Cal-d(5) Ile-v(6) Tax-m(6) Ile-v(30) Heu-a(33) Lir-s(40) Heu-a(4) Car-c(6) Spo-t(10) Sch-j(6) Spo-t(10) Sch-j(13) Spo-t(65) Ger ann(46) Ger ann(111) Ger ann(50) Heu-a(27) Ger ann(36) Heu-a(35) Ger ann(23) Heu-a(6) Sch-j(6) Cle-s(9) Sch-j(4) Cle-s(5) Pen-a(6) Cal-d(82) Heu-a(145) Lir-s(183) Iri-c(1) Zel-s(15) Pen-a(3) Sch-j(7) Sch-j(9) Pen-a(124) Lir-s(73) Heu-a(6) Sch-j(5) Ile-v(67) Lir-s(8) Ile-v(19) Pen-a(12) Sch-j(2) Cle-s(16) Hos-g Revision Date Description
01 01/05/2023 REQ'D EDITS; SHEETS REISSUED Date:11.23.2022 Job No:2020-1360 Drawn by:MA / BM Checked by:JM / BMConstruction Intent Plans for the
AVANT PH 2, Carmel, Indiana
Edward Rose Development Carmel, LLC
5825 Lawton Loop E. Dr. | Indianapolis, IN 46216
317-485-6900 | www.context-design.comPLANTING PLAN ENLARGEMENTL303 1.Refer to Project Manual for Planting Specifications and Topsoil requirements.Refer to Plant Schedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Ownerat any time. Landscape Architect to inspect all plant locations and plant bedconditions prior to installation. On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'AmericanStandards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALLREMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates withinfive (5) days after planting. Replace immediately with approved, specifiedmaterial.5.Plant counts indicated on drawings are for Landscape Architect's use only.Contractor shall make own plant quantity takeoffs using drawings,specifications, and plant schedule requirements (i.e., spacing), unlessotherwise directed by Landscape Architect. Contractor to verify bedmeasurements and install appropriate quantities as governed by plant spacingper schedule. Plant material quantities shown on plan are minimum quantities.Additional material may be needed to meet spacing requirements and fieldconditions.6.Seed all areas disturbed by construction activities that are not otherwise notedto receive pavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas tomeet Specifications. Contractor shall coordinate quantity and placement oftopsoil. Landscaper shall verify depth of topsoil prior to plant installation.(Refer to specifications for topsoil source and placement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for reviewand approval by the Landscape Architect. Any plant material installed in anincorrect location, by the judgment of the Landscape Architect, shall bereinstalled at the Contractor's expense.9.All plant beds shall receive 1-2" minimum of shredded hardwood bark mulch(unless otherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair all damagedutilities to Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project isfully accepted by the Landscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for aperiod of one calendar year after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances.Coordinate with the Owner to obtain any required permits necessary tocomplete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water formore than 24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimumprotected area shall include the full drip line of the canopy. NO constructionactivities, material storage, etc. may occur within that area. The Contractorshall ensure that no soil compaction or tree damage occurs in any Protectedareas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.NOTE:LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS ONSHEET L311 - SEE PLANTINGS DETAILS.GENERAL LANDSCAPE ANDPLANTING NOTESNorth0Scale 1" = 10'-0"20'10'5'MATCHLINE: REFER TO SHEET L301MATCHLINE: REFER TO SHEET L301
REFER TOENLARGED PLANON SHEET L305Lawn;All Disturbed Areas unless Noted Otherwise
(1) Gyn-d(2) Lir-t(31) Hos-g(7) Cle-s(7) Fot-g(1) Pla-x(12) Fot-g(59) Heu-a(3) Fot-g(6) Pen-a(1) Gyn-d(2) Lir-t(31) Hos-g(7) Cle-s(7) Fot-g(1) Pla-x(12) Fot-g(59) Heu-a(3) Fot-g(6) Pen-a(1) Gyn-d(2) Lir-t(31) Hos-g(7) Cle-s(7) Fot-g(1) Pla-x(12) Fot-g(59) Heu-a(3) Fot-g(6) Pen-a Revision Date Description
01 01/05/2023 REQ'D EDITS; SHEETS REISSUED Date:11.23.2022 Job No:2020-1360 Drawn by:MA / BM Checked by:JM / BMConstruction Intent Plans for the
AVANT PH 2, Carmel, Indiana
Edward Rose Development Carmel, LLC
5825 Lawton Loop E. Dr. | Indianapolis, IN 46216
317-485-6900 | www.context-design.comPLANTING PLAN ENLARGEMENTL304 1.Refer to Project Manual for Planting Specifications and Topsoil requirements.Refer to Plant Schedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Ownerat any time. Landscape Architect to inspect all plant locations and plant bedconditions prior to installation. On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'AmericanStandards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALLREMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates withinfive (5) days after planting. Replace immediately with approved, specifiedmaterial.5.Plant counts indicated on drawings are for Landscape Architect's use only.Contractor shall make own plant quantity takeoffs using drawings,specifications, and plant schedule requirements (i.e., spacing), unlessotherwise directed by Landscape Architect. Contractor to verify bedmeasurements and install appropriate quantities as governed by plant spacingper schedule. Plant material quantities shown on plan are minimum quantities.Additional material may be needed to meet spacing requirements and fieldconditions.6.Seed all areas disturbed by construction activities that are not otherwise notedto receive pavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas tomeet Specifications. Contractor shall coordinate quantity and placement oftopsoil. Landscaper shall verify depth of topsoil prior to plant installation.(Refer to specifications for topsoil source and placement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for reviewand approval by the Landscape Architect. Any plant material installed in anincorrect location, by the judgment of the Landscape Architect, shall bereinstalled at the Contractor's expense.9.All plant beds shall receive 1-2" minimum of shredded hardwood bark mulch(unless otherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair all damagedutilities to Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project isfully accepted by the Landscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for aperiod of one calendar year after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances.Coordinate with the Owner to obtain any required permits necessary tocomplete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water formore than 24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimumprotected area shall include the full drip line of the canopy. NO constructionactivities, material storage, etc. may occur within that area. The Contractorshall ensure that no soil compaction or tree damage occurs in any Protectedareas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.NOTE:LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS ONSHEET L311 - SEE PLANTINGS DETAILS.GENERAL LANDSCAPE ANDPLANTING NOTESNorth0Scale 1" = 10'-0"20'10'5'MATCHLINE: REFER TO SHEET L301MATCHLINE: REFER TO SHEET L301M
A
T
C
H
L
I
N
E
:
R
E
F
E
R
T
O
S
H
E
E
T
L
3
0
1 REFER TOENLARGED PLANON SHEET L306 REFER TOENLARGED PLANON SHEET L305Lawn;All Disturbed Areas unless Noted Otherwise
(2) Ile-v(55) Lir-s(5) Ile-v(67) Lir-s(8) Ile-v(19) Pen-a(12) Sch-j(2) Cle-s(16) Hos-g(3) Cle-s(12) Sch-j(4) Pla-x(2) Cal-d(65) Iri-c(8) Cal-d(32) Iri-c(18) Sch-j(7) Ile-v(65) Lir-s(15) Pen-a(2) Cle-s(13) Hos-g(11) Sch-j(3) Cle-s(6) Hos-g(2) Fot-g(34) Heu-a(12) Fot-g(59) Heu-a(10) Pen-a(2) Ile-v(55) Lir-s(5) Ile-v(67) Lir-s(8) Ile-v(19) Pen-a(12) Sch-j(2) Cle-s(16) Hos-g(3) Cle-s(12) Sch-j(4) Pla-x(2) Cal-d(65) Iri-c(8) Cal-d(32) Iri-c(18) Sch-j(7) Ile-v(65) Lir-s(15) Pen-a(2) Cle-s(13) Hos-g(11) Sch-j(3) Cle-s(6) Hos-g(2) Fot-g(34) Heu-a(12) Fot-g(59) Heu-a(10) Pen-a(2) Ile-v(55) Lir-s(5) Ile-v(67) Lir-s(8) Ile-v(19) Pen-a(12) Sch-j(2) Cle-s(16) Hos-g(3) Cle-s(12) Sch-j(4) Pla-x(2) Cal-d(65) Iri-c(8) Cal-d(32) Iri-c(18) Sch-j(7) Ile-v(65) Lir-s(15) Pen-a(2) Cle-s(13) Hos-g(11) Sch-j(3) Cle-s(6) Hos-g(2) Fot-g(34) Heu-a(12) Fot-g(59) Heu-a(10) Pen-a Revision Date Description
01 01/05/2023 REQ'D EDITS; SHEETS REISSUED Date:11.23.2022 Job No:2020-1360 Drawn by:MA / BM Checked by:JM / BMConstruction Intent Plans for the
AVANT PH 2, Carmel, Indiana
Edward Rose Development Carmel, LLC
5825 Lawton Loop E. Dr. | Indianapolis, IN 46216
317-485-6900 | www.context-design.comPLANTING PLAN ENLARGEMENTL305 1.Refer to Project Manual for Planting Specifications and Topsoil requirements.Refer to Plant Schedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Ownerat any time. Landscape Architect to inspect all plant locations and plant bedconditions prior to installation. On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'AmericanStandards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALLREMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates withinfive (5) days after planting. Replace immediately with approved, specifiedmaterial.5.Plant counts indicated on drawings are for Landscape Architect's use only.Contractor shall make own plant quantity takeoffs using drawings,specifications, and plant schedule requirements (i.e., spacing), unlessotherwise directed by Landscape Architect. Contractor to verify bedmeasurements and install appropriate quantities as governed by plant spacingper schedule. Plant material quantities shown on plan are minimum quantities.Additional material may be needed to meet spacing requirements and fieldconditions.6.Seed all areas disturbed by construction activities that are not otherwise notedto receive pavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas tomeet Specifications. Contractor shall coordinate quantity and placement oftopsoil. Landscaper shall verify depth of topsoil prior to plant installation.(Refer to specifications for topsoil source and placement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for reviewand approval by the Landscape Architect. Any plant material installed in anincorrect location, by the judgment of the Landscape Architect, shall bereinstalled at the Contractor's expense.9.All plant beds shall receive 1-2" minimum of shredded hardwood bark mulch(unless otherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair all damagedutilities to Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project isfully accepted by the Landscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for aperiod of one calendar year after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances.Coordinate with the Owner to obtain any required permits necessary tocomplete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water formore than 24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimumprotected area shall include the full drip line of the canopy. NO constructionactivities, material storage, etc. may occur within that area. The Contractorshall ensure that no soil compaction or tree damage occurs in any Protectedareas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.NOTE:LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS ONSHEET L311 - SEE PLANTINGS DETAILS.GENERAL LANDSCAPE ANDPLANTING NOTESNorth0Scale 1" = 10'-0"20'10'5'MATCHLINE: REFER TO SHEET L301MATCHLINE: REFER TO SHEET L301MATCHLINE: REFER TO SHEET L301 REFER TOENLARGED PLANON SHEET L304 REFER TOENLARGED PLANON SHEET L303Lawn;All Disturbed Areas unless Noted Otherwise
(2) Lir-t(3) Fot-g(6) Pen-a(3) Cle-s(11) Sch-j(3) Cle-s(9) Pen-a(5) Ile-v(13) Sch-j(5) Hos-g(37) Lir-s(2) Ulm-a(13) Pen-a(6) Cal-d(11) Hos-g(3) Cle-s(16) Sch-j(11) Fot-g(77) Hos-g(1) Ulm-a(2) Lir-t(3) Fot-g(6) Pen-a(3) Cle-s(11) Sch-j(3) Cle-s(9) Pen-a(5) Ile-v(13) Sch-j(5) Hos-g(37) Lir-s(2) Ulm-a(13) Pen-a(6) Cal-d(11) Hos-g(3) Cle-s(16) Sch-j(11) Fot-g(77) Hos-g(1) Ulm-a(2) Lir-t(3) Fot-g(6) Pen-a(3) Cle-s(11) Sch-j(3) Cle-s(9) Pen-a(5) Ile-v(13) Sch-j(5) Hos-g(37) Lir-s(2) Ulm-a(13) Pen-a(6) Cal-d(11) Hos-g(3) Cle-s(16) Sch-j(11) Fot-g(77) Hos-g(1) Ulm-a Revision Date Description
01 01/05/2023 REQ'D EDITS; SHEETS REISSUED Date:11.23.2022 Job No:2020-1360 Drawn by:MA / BM Checked by:JM / BMConstruction Intent Plans for the
AVANT PH 2, Carmel, Indiana
Edward Rose Development Carmel, LLC
5825 Lawton Loop E. Dr. | Indianapolis, IN 46216
317-485-6900 | www.context-design.comPLANTING PLAN ENLARGEMENTL306 1.Refer to Project Manual for Planting Specifications and Topsoil requirements.Refer to Plant Schedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Ownerat any time. Landscape Architect to inspect all plant locations and plant bedconditions prior to installation. On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'AmericanStandards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALLREMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates withinfive (5) days after planting. Replace immediately with approved, specifiedmaterial.5.Plant counts indicated on drawings are for Landscape Architect's use only.Contractor shall make own plant quantity takeoffs using drawings,specifications, and plant schedule requirements (i.e., spacing), unlessotherwise directed by Landscape Architect. Contractor to verify bedmeasurements and install appropriate quantities as governed by plant spacingper schedule. Plant material quantities shown on plan are minimum quantities.Additional material may be needed to meet spacing requirements and fieldconditions.6.Seed all areas disturbed by construction activities that are not otherwise notedto receive pavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas tomeet Specifications. Contractor shall coordinate quantity and placement oftopsoil. Landscaper shall verify depth of topsoil prior to plant installation.(Refer to specifications for topsoil source and placement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for reviewand approval by the Landscape Architect. Any plant material installed in anincorrect location, by the judgment of the Landscape Architect, shall bereinstalled at the Contractor's expense.9.All plant beds shall receive 1-2" minimum of shredded hardwood bark mulch(unless otherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair all damagedutilities to Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project isfully accepted by the Landscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for aperiod of one calendar year after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances.Coordinate with the Owner to obtain any required permits necessary tocomplete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water formore than 24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimumprotected area shall include the full drip line of the canopy. NO constructionactivities, material storage, etc. may occur within that area. The Contractorshall ensure that no soil compaction or tree damage occurs in any Protectedareas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.NOTE:LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS ONSHEET L311 - SEE PLANTINGS DETAILS.GENERAL LANDSCAPE ANDPLANTING NOTESNorth0Scale 1" = 10'-0"20'10'5'MATCHLINE: REFER TO SHEET L301MATCHLINE: REFER TO SHEET L302
M
A
T
C
H
L
I
N
E
:
R
E
F
E
R
T
O
S
H
E
E
T
L
3
0
1 REFER TOENLARGED PLANON SHEET L304Lawn;All Disturbed Areas unless Noted Otherwise