HomeMy WebLinkAboutProject DescriptionUDO § 1.07E requires compliance with the Comprehensive Plan § 4.2 that provides for the
installation of sidewalks along the full length of the parcel being improved. There are currently
no sidewalks anywhere in the Woodland subdivision and the area presently has golf cart paths
and connecting pedestrian walkways. Until sidewalks are installed in the Woodland subdivision
along existing street (Woodland Drive) requiring sidewalks along the approximate 500 feet will
not improve connectivity or pedestrian safety.