HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: PZ-2023-00223 TAC - Carmel High School Polytechnic addition,reno Workflow Started: 9/19/2023 9:33:09 AM Report Generated: 02/15/2024 11:18 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 2 1 Urban Forestry Daren Mindham 9/25/23 10:36 AM Changemark Add tree preservation fencing please fence off existing trees to limit parking and access in both red locations. Please add a tree preservation fencing detail. I have uploaded the city standard detail to the correspondence folder. C320 - Erosion Control Plan - G3.2.pdf Responsed by: Amber Sheller - 11/18/23 1:09 PM Tree protection areas have been added to plan. Replaced tree protection detail on the drawing with the City of Carmel tree preservation detail. Resolved 3 1 Urban Forestry Daren Mindham 9/25/23 1:59 PM Changemark large oak tree Can this greenspace be saved? It has an oak tree (green circle) that is over 40" in diameter here. The access to this area has been used without this extra drive lane to date. I would like to recommend keeping this greenspace as a screening of the building maintenance area and to preserve one of the largest if not the largest oak trees on the property. L100 - Landscape Plan - L1.1.pdf Responsed by: Amber Sheller - 11/18/23 1:09 PM No unfortunately not. The access to the docks that once was to the east then backing in to the south, now needs to use the area north of the docks to back in, as well as for access to the relocated waste dumpster. Resolved 4 1 Planning & Zoning Angie Conn 9/26/23 12:30 PM Comment Please upload a an exterior building addition colors/materials palette and/or colored exterior architectural building elevations. Responsed by: Amber Sheller - 11/18/23 1:07 PM See updated and uploaded Sheet A3.01 with color building elevations. Resolved 5 1 Planning & Zoning Angie Conn 9/26/23 12:33 PM Comment Please upload the exterior storage masonry screen wall architectural elevations. Responsed by: Amber Sheller - 11/18/23 1:07 PM Masonry screenwalls are shown on revised and uploaded Sheets A1.05 and A3.01. Resolved 6 1 Planning & Zoning Angie Conn 9/26/23 12:34 PM Comment Please upload a Tree Preservation Plan that addresses the Forestry Dept. comments and concerns. Responsed by: Amber Sheller - 11/18/23 1:07 PM Tree protection added to GD1.1, G3.1, G3.2 & L1.1. Resolved 7 1 Sign Permits Aliza Shalit 10/4/23 1:16 PM Changemark SIgn Please provide details for this sign. L100 - Landscape Plan - L1.1.pdf Reviewer Response: Aliza Shalit - 11/26/23 4:22 PM If any changes will be made to the face of the existing sign a Sign Permit will be required. ---------------------------------------------------------- Responsed by: Amber Sheller - 11/18/23 1:08 PM This is an existing sign to remain. Info Only 8 1 Sign Permits Aliza Shalit 10/4/23 1:17 PM Comment All Signs require a sign permit application and review process. Please apply through our online application portal when ready. Info Only REVIEW COMMENTS Plan Review - Review Comments Report Project Name: PZ-2023-00223 TAC - Carmel High School Polytechnic addition,reno Workflow Started: 9/19/2023 9:33:09 AM Report Generated: 02/15/2024 11:18 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 9 1 Sign Permits Aliza Shalit 10/4/23 1:18 PM Comment Are there any other signs planned? Please provide location details for wall signs, directional signs, or ground sign (monument) if planned. Responsed by: Amber Sheller - 11/18/23 1:08 PM None, other than ADA parking signs. Resolved 10 1 Vectren Energy Chad Miller 10/9/23 9:44 AM Changemark CenterPoint Energy Please have the school or the developer call the new service center at 1-800- 990-1930 to have a work order created to have the gas service relocated. When will this work need to be done? CenterPoint Energy will also need an AutoCAD file and load information on the proposed building addition. This may require a resize of the gas meter. C610 - Site Utility Plan - SU1.1.pdf Responsed by: Amber Sheller - 1/19/24 2:50 PM No additional comment was made. ---------------------------------------------------------- Responsed by: Amber Sheller - 12/15/23 10:41 AM No additional comment was made. ---------------------------------------------------------- Responsed by: Amber Sheller - 11/18/23 1:10 PM The Construction Manager or Contractor will contact CenterPoint Energy to initate this process and coordinate schedule. Resolved 11 1 Carmel Water Operations Brett Ransford 10/9/23 2:03 PM Comment Request meeting in our office to go over changes. Responsed by: Amber Sheller - 12/20/23 2:40 PM No additional comment was made. ---------------------------------------------------------- Reviewer Response: Brett Ransford - 12/5/23 11:19 AM waiting on revisions from meeting on 11/28 ---------------------------------------------------------- Responsed by: Amber Sheller - 11/17/23 1:59 PM Carmel Utilites was contacted by the project team to review project and provide additional information with meeting scheduled for 11/28. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00223 TAC - Carmel High School Polytechnic addition,reno Workflow Started: 9/19/2023 9:33:09 AM Report Generated: 02/15/2024 11:18 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 12 1 CrossRoad Engineers Willie Hall 10/10/23 4:30 PM Changemark 102.03 Please include sizing for pipe downstream of OCS. 2023-119_Drainage Report.2023-09- 19_REDUCED.pdf Responsed by: Amber Sheller - 12/20/23 2:40 PM Pipe run was added to page 26 of Drainage Report. ---------------------------------------------------------- Reviewer Response: Willie Hall - 11/30/23 1:57 PM Pipe run appears to be omitted from the table. ---------------------------------------------------------- Responsed by: Amber Sheller - 11/17/23 2:00 PM The pipe downstream of the OCS (ST-301 to ST-302) is now included in the storm sewer design table in the drainage report. Resolved 13 1 CrossRoad Engineers Willie Hall 10/10/23 4:30 PM Changemark 701 Please provide isolator row within chamber system to provide required second BMP. 2023-119_Drainage Report.2023-09- 19_REDUCED.pdf Responsed by: Amber Sheller - 11/18/23 1:11 PM The Isolator Row information was added to the Drainage Report and BMP O&M Manual. Resolved 14 1 CrossRoad Engineers Willie Hall 10/10/23 4:36 PM Changemark 102.03 Please include critical storm elevations, proposed and required detention volumes. 2023-119_Drainage Report.2023-09- 19_REDUCED.pdf Responsed by: Amber Sheller - 11/17/23 2:00 PM The detention system stage release summary (table 4) of the drainage report has been updated to include the storage volume for the 10 and 100 year storm events. Resolved 15 1 CrossRoad Engineers Willie Hall 10/10/23 4:36 PM Changemark 303.07 Please include ponding limits of the 100-year fully clogged scenario. C210 - Grading Plan - G2.1.pdf Reviewer Response: Willie Hall - 11/30/23 2:22 PM ---------------------------------------------------------- Responsed by: Amber Sheller - 11/17/23 2:01 PM Ponding limits are shown on the Emergency Flood Routing Plan, G2.1A. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00223 TAC - Carmel High School Polytechnic addition,reno Workflow Started: 9/19/2023 9:33:09 AM Report Generated: 02/15/2024 11:18 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 16 1 CrossRoad Engineers Willie Hall 10/10/23 4:36 PM Changemark 104.02 Please include MFPG and MLAG for the proposed and existing buildings. C210 - Grading Plan - G2.1.pdf Responsed by: Amber Sheller - 12/20/23 2:41 PM Waiver uploaded to correspondence folder. ---------------------------------------------------------- Reviewer Response: Willie Hall - 11/30/23 2:28 PM Please submit a waiver request since the MFPG exceeds the FFE, . ---------------------------------------------------------- Responsed by: Amber Sheller - 11/17/23 2:01 PM The MFPG and MLAG are shown on the Emergency Flood Routing Plan, G2.1A. Resolved 17 1 CrossRoad Engineers Willie Hall 10/10/23 4:36 PM Changemark Containment Tank Please provide details on G4.2 and any other sheets containing details of the oil containment tank to verify no additional water quality measures will be required. C110 - Site Plan - G1.1.pdf Responsed by: Amber Sheller - 11/18/23 12:56 PM The tanks noted in Keynote 26 are located in a concrete pit with a drain to an oil/water separator prior to discharging to the sanitary sewer system. Please see Details 12 and 17 on Sheet S3.03 for the concrete pit and the uploaded cut sheets on the tank. Resolved 18 1 CrossRoad Engineers Willie Hall 10/10/23 4:36 PM Changemark 102.02 Please include HGLs on storm P&P C810 - Storm Sewer Plan and Profile - SU3.1.pdf Responsed by: Amber Sheller - 11/17/23 2:02 PM The HGLs are shown on the Storm Sewer Plan and Profiles, SU3.1. Resolved 19 1 CrossRoad Engineers Willie Hall 10/10/23 4:37 PM Changemark 102.02.xi.m drainage plan shall include a drainage summary, which summarizes the basic conditions of the drainage design, including site acreage, off-site/upstream acreage, allowable release rates, post-developed 10-year, and 100-year flows leaving the site, volume of detention required, volume of detention provided, and any release rate. C610 - Site Utility Plan - SU1.1.pdf Responsed by: Amber Sheller - 11/17/23 2:02 PM A summary of the underground detention system including contributing drainage area, 10 and 100 year elevations, 10 and 100 year release rates, 10 and 100 year storage volumes are shown on Grading Plan, G2.1 and the Utility Plan SU1.1. Resolved 20 1 CrossRoad Engineers Willie Hall 10/10/23 4:37 PM Changemark 102.02.xi.l Please include critical elevations on the detention cross section. C710 - Site Utility Details - SU2.1.pdf Responsed by: Amber Sheller - 11/17/23 2:02 PM A detention system summary has been added to the detention system details on sheet SU2.3 and includes critical elevations. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00223 TAC - Carmel High School Polytechnic addition,reno Workflow Started: 9/19/2023 9:33:09 AM Report Generated: 02/15/2024 11:18 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 21 1 CrossRoad Engineers Willie Hall 10/10/23 4:39 PM Changemark 302.06.10 A minimum of fifteen (15) feet horizontally from the top of bank of the facility, or the 100-year pool if no defined top of bank is present, shall be dedicated as permanent stormwater easement. A 20' access easement to the detention and BMP structure will be required as well. C610 - Site Utility Plan - SU1.1.pdf Responsed by: Amber Sheller - 11/17/23 2:03 PM A 15' easement around the undeground detention basin is shown on the revised plan. On past projects the City of Carmel has waived the requirement for an access easement to detention systems and BMP structures, noting that they have the right to access already. Resolved 22 1 CrossRoad Engineers Willie Hall 10/10/23 4:40 PM Changemark 302.06.11 Please verify that the detention basin is designed with 10% additional capacity for sediment accumulation. 2023-119_Drainage Report.2023-09- 19_REDUCED.pdf Responsed by: Amber Sheller - 11/17/23 2:03 PM The detention basin design has 14% additional storage capacity for sediment accumulation. Available storage is 0.145 ac/ft with 0.127 ac/ft used for the 100 year storage volume. Resolved 23 1 CrossRoad Engineers Willie Hall 10/10/23 4:41 PM Changemark 302.11 Please provide emergency calculations showing the overflow facilities are designed to convey, without overtopping the detention facility banks, one and one-quarter (1.25) times the peak inflow discharge and peak flow velocity resulting from the 100-year design storm event runoff from the entire contributing watershed draining to the detention/retention facility, assuming post-development condition on-site and existing condition off- site. 2023-119_Drainage Report.2023-09- 19_REDUCED.pdf Responsed by: Amber Sheller - 11/17/23 2:04 PM Emergency spillway calculations are now included in the drainage report. Resolved 24 1 Fire Carmel Fire 10/12/23 6:36 AM Comment All vehicle access roads shall be designed to accommodate the largest fire apparatus available to the Carmel Fire Dept. Required fire department access routes shall be unobstructed at all times. All required exits from the building shall have their exit access to the public way maintained at all times. Required exit and exit sidewalks shall not be obstructed. All Required exits from the building shall be maintained not obstructed at all times. Access to fire hydrants and FDCs shall be maintained at all times. The CFD shall be notified on any fire protection systems that are changed or out of service for any length of time. Responsed by: Amber Sheller - 12/15/23 10:36 AM No additional comment was made. ---------------------------------------------------------- Responsed by: Amber Sheller - 11/18/23 2:03 PM The proposed modifications to the drives can accommodate a 40' long Fire Truck. The proposed pavements are designed for highway loading and can accommodate fire truck and delivery vehicles. It is the intent to keep all access and egress points clear and free of obstructions. This comment will be forwarded to the Owner/School as well. See Exhibit A - Fire Truck Turning Plan. Info Only 25 1 Engineering Alex Jordan 10/17/23 11:25 AM Library Comment Please provide a professional engineer's stamp on the cover sheet Responsed by: Amber Sheller - 11/17/23 2:04 PM The Coversheet was updated with the Engineer's Stamp. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00223 TAC - Carmel High School Polytechnic addition,reno Workflow Started: 9/19/2023 9:33:09 AM Report Generated: 02/15/2024 11:18 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 26 1 Engineering Alex Jordan 10/17/23 11:25 AM Library Comment Please include the following note on the plans: "No earth disturbing activity may commence without an approved storm water management permit." Responsed by: Amber Sheller - 11/17/23 2:05 PM The requested note was added to the General Notes of all Plan Sheets GD1.1, G1.1, G2.1, G3.2 and SU1.1. Resolved 27 1 Engineering Alex Jordan 10/17/23 11:25 AM Library Comment Please include the following note on the plans: "Utility relocations required by the project shall be the responsibility of the developer. Utility line relocations required for road projects that result in a conflict with proposed development shall be the developer to resolve with the utility. Existing pole lines required to be relocated to within one foot of proposed right-of-way line." Responsed by: Amber Sheller - 11/17/23 2:05 PM The requested note was added to the General Notes of all Plan Sheets GD1.1, G1.1, G2.1, G3.2 and SU1.1. Resolved 28 1 Engineering Alex Jordan 10/17/23 11:25 AM Library Comment Please include the following note on the plans: "Damage to the exisitng right-of-way shall be restored/repaired to the satisfaction of the City at the completion of the project. The contractor is encouraged to inspect the right- of-way with the city prior to the start of construction to document the existing condition of the right-of-way." Responsed by: Amber Sheller - 11/17/23 2:05 PM The requested note was added to the General Notes of all Plan Sheets GD1.1, G1.1, G2.1, G3.2 and SU1.1. Resolved 29 1 Engineering Alex Jordan 10/17/23 11:25 AM Library Comment Please provide the City's paving policy in the set Responsed by: Amber Sheller - 11/17/23 2:06 PM General Notes Sheet GD0.3 was added with the requested policy. Resolved 30 1 Engineering Alex Jordan 10/17/23 11:25 AM Library Comment Please provide the City's curbing policy in the set Responsed by: Amber Sheller - 11/17/23 2:06 PM General Notes Sheet GD0.3 was added with the requested policy. Resolved 31 1 Engineering Alex Jordan 10/17/23 11:25 AM Library Comment Please verify that there are no direct discharge areas Responsed by: Amber Sheller - 11/17/23 2:06 PM There are no direct discharge areas discharging to on- site storm sewers from the new disturbed pavement and building areas. Resolved 32 1 Engineering Alex Jordan 10/17/23 11:25 AM Library Comment Please verify that all elevations are North American Vertical Datum of 1988 (NAVD) Responsed by: Amber Sheller - 11/17/23 2:07 PM Yes, they are as shown on the originally submitted Survey Plans. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00223 TAC - Carmel High School Polytechnic addition,reno Workflow Started: 9/19/2023 9:33:09 AM Report Generated: 02/15/2024 11:18 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 33 1 Engineering Alex Jordan 10/17/23 11:25 AM Library Comment Please verify that the horizontal datum of topgraphic map is Indiana State Plane Coordinates, NAD83 Responsed by: Amber Sheller - 11/17/23 2:08 PM Yes, they are as shown on the originally submitted Survey Plans. Resolved 34 1 Engineering Alex Jordan 10/17/23 11:25 AM Library Comment Please verify that the locations of existing utilities with top of curb and invert elevations, pipe sizes, and direction are shown Responsed by: Amber Sheller - 11/17/23 2:08 PM Yes, they are as shown on the originally submitted Survey Plans. Resolved 35 1 Engineering Alex Jordan 10/17/23 11:25 AM Library Comment Please verify that all existing culverts, pipes, and bridges on existing drives or under the roadway are shown indicating size, type, and invert elevations Responsed by: Amber Sheller - 11/17/23 2:08 PM Yes, they are as shown on the originally submitted Survey Plans. Resolved 36 1 Engineering Alex Jordan 10/17/23 11:25 AM Library Comment Please verify that the locations of all existing electrical power vaults, transformers, power lines, gas lines, television cable , and telephone lines are shown Responsed by: Amber Sheller - 11/17/23 2:09 PM Yes, they are as shown on the originally submitted Survey Plans. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00223 TAC - Carmel High School Polytechnic addition,reno Workflow Started: 9/19/2023 9:33:09 AM Report Generated: 02/15/2024 11:18 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 37 1 Transportation Systems David Littlejohn 10/17/23 11:40 AM Changemark Wheel stops for parking perpendicular to sidewalks Section 5.28 of the City's UDO requires wheel stops for parking spaces that are perpendicular to pedestrian sidewalks to prevent the bumper of a vehicle from projecting over the surface of the pedestrian facility. Please revise the plans to include wheel stops at this parking aisle and all other locations where parking is perpendicular to adjacent sidewalks and bollards are not proposed. C110 - Site Plan - G1.1.pdf Responsed by: Amber Sheller - 2/7/24 4:32 PM Wheel stops added to plan. ---------------------------------------------------------- Reviewer Response: David Littlejohn - 1/19/24 11:18 AM I see a waiver has been requested, but it has not been granted. Revise the plans to include wheel stops to prevent vehicles from obstructing the adjacent sidewalk or or widen the sidewalk to 10' wide to allow for enough space for people to walk around vehicles over the sidewalk. ---------------------------------------------------------- Responsed by: Amber Sheller - 1/3/24 5:20 PM A waiver has been requested for this review comment via email. Please see Figure 37-38. ---------------------------------------------------------- Reviewer Response: David Littlejohn - 12/1/23 10:34 AM Section 5.28 of the UDO states that wheel stops are not required if the sidewalk perpendicular to the parking is a minimum of 10' wide. If the plans are revised so that the sidewalk is widened to at least 10' wide wheel stops will not be require. ---------------------------------------------------------- Responsed by: Amber Sheller - 11/18/23 1:09 PM The School requests a waiver from this request. The wheel stops create a hardship for snow removal and maintenance issues if there are leaves or debris present. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00223 TAC - Carmel High School Polytechnic addition,reno Workflow Started: 9/19/2023 9:33:09 AM Report Generated: 02/15/2024 11:18 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 38 1 Transportation Systems David Littlejohn 10/17/23 12:33 PM Changemark Direct pedestrian connections at north west corner Revise the plans to include direct pedestrian connections/crosswalks at the north west corner of the site. C110 - Site Plan - G1.1.pdf Responsed by: Amber Sheller - 2/7/24 4:32 PM Pedestrian connection added to the west side of the intersection. ---------------------------------------------------------- Reviewer Response: David Littlejohn - 1/19/24 11:19 AM The north/south pedestrian connection on the west side of this intersection will provide direct pedestrian access to the path along the access drive from the sidewalk along N Richland Ave. Revise the plans to include a north/south pedestrian connection and crosswalk at the intersection. ---------------------------------------------------------- Responsed by: Amber Sheller - 1/3/24 5:20 PM A waiver has been requested for this review comment via email. Please see Figure 37-38. ---------------------------------------------------------- Reviewer Response: David Littlejohn - 12/1/23 10:43 AM The north/south pedestrian connection and crosswalk on the west side of this intersection was not included in the revision. Revise the plans to include this connection and crosswalk. ---------------------------------------------------------- Responsed by: Amber Sheller - 11/18/23 1:09 PM Please see revised Site Plan with the added sidewalk, ADA ramps and crosswalk. Resolved 39 1 Engineering Alex Jordan 10/17/23 2:18 PM Library Comment Please clearly show the construction limits on all sheets with plan view (not required on profile sheets) Responsed by: Amber Sheller - 11/18/23 1:02 PM Construction limits added to all plan sheets. Resolved 40 1 Engineering Alex Jordan 10/17/23 2:18 PM Library Comment Please provide all on-site and off-site flood routing through the site Responsed by: Amber Sheller - 11/18/23 1:02 PM An emergency flood routing plan, G2.1A is now included in the construction documents. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00223 TAC - Carmel High School Polytechnic addition,reno Workflow Started: 9/19/2023 9:33:09 AM Report Generated: 02/15/2024 11:18 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 41 1 Engineering Alex Jordan 10/17/23 2:18 PM Library Comment Please show the 100-year elevations of all inlets in the clogged condtions Responsed by: Amber Sheller - 11/18/23 1:02 PM An emergency flood routing plan, G2.1A is now included in the construction documents indicates the 100 year elevation of all inlets in the clogged condition. Resolved 42 1 Engineering Alex Jordan 10/17/23 2:18 PM Library Comment Please provide the minimum flood protection grade (MFPG) and minimum lowest adjacent grade (MLAG) elevations and definitions of each Responsed by: Amber Sheller - 11/18/23 1:03 PM The MFPG and MLAG are shown on the Emergency Flood Routing Plan, G2.1A. Resolved 43 1 Engineering Alex Jordan 10/17/23 2:30 PM Changemark Please show the critical elevations of the detention facility C210 - Grading Plan - G2.1.pdf Responsed by: Amber Sheller - 11/18/23 1:03 PM A summary of the underground detention system including contributing drainage area, 10 and 100 year elevations, 10 and 100 year release rates, 10 and 100 year storage volumes are shown on Grading Plan, G2.1 and the Utility Plan SU1.1. Resolved 44 1 Engineering Alex Jordan 10/17/23 2:47 PM Changemark Please provide protection over this curb inlet C310 - Pre-Developed Erosion Control Plan - G3.1.pdf Responsed by: Amber Sheller - 11/18/23 1:03 PM Inlet protection added to inlet. Resolved 45 1 Engineering Alex Jordan 10/17/23 2:47 PM Changemark Please have this information provided when available C310 - Pre-Developed Erosion Control Plan - G3.1.pdf Responsed by: Amber Sheller - 11/18/23 1:04 PM Information added. Resolved 46 1 Engineering Alex Jordan 10/17/23 3:20 PM Changemark Please revise this section to be project specific Please also verify that the rest of the SWPPP narrative is project specific as well. C330 - SWPPP - G3.3.pdf Responsed by: Amber Sheller - 11/18/23 1:04 PM Section "C" of the SWPPP, G3.3 has been updated to be project specific. Resolved 47 1 Engineering Alex Jordan 10/17/23 3:20 PM Changemark Please clearly call out the water quality unit on this sheet Please include the units brand and size. C320 - Erosion Control Plan - G3.2.pdf Responsed by: Amber Sheller - 11/18/23 1:05 PM The mechanical BMP and underground detention system with isolator row are now labeled on the Erosion Control Plan, G3.2. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00223 TAC - Carmel High School Polytechnic addition,reno Workflow Started: 9/19/2023 9:33:09 AM Report Generated: 02/15/2024 11:18 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 48 1 Engineering Alex Jordan 10/17/23 3:39 PM Changemark Please provide a detail for the weighted wattles C340 - Erosion Control Details - G3.4.pdf Responsed by: Amber Sheller - 11/18/23 1:05 PM A detail of the weighted wattle has been added as Detail 'H' on Sheet G3.4 . Sheet G3.2 Keynote 7 has been updated to reflect the Detail H on G3.4. Resolved 49 1 Engineering Alex Jordan 10/18/23 8:21 AM Changemark Please provide a detail for this item There is no sheet number provided for this detail and we were unable to locate it within the detail sheets provided. C110 - Site Plan - G1.1.pdf Responsed by: Amber Sheller - 11/18/23 1:05 PM Sheet G1.1 has been updated with the detail number of the containment pit. Sheets S1.01 and S3.03 have been uploaded with Details 12 and 17 on S3.03 added as reference. See Exhibit Tank 1. Resolved 50 1 Engineering Alex Jordan 10/18/23 8:21 AM Changemark What is planned to be stored in this tank? C110 - Site Plan - G1.1.pdf Responsed by: Amber Sheller - 11/18/23 1:05 PM Fuel Oil Storage Tank in a Dual-walled above ground tank. See Exhibit Tank 2. Resolved 51 2 Engineering Alex Jordan 12/12/23 8:38 AM Comment We have no further comments on the plans. Before we can issue the stormwater management permit, the following items will need to be provided: 1. A signed and recorded O&M manual 2. An erosion control engineers estimate 3. A non-expiring erosion control performance bond for 100% of the approved estimate 4. A right-of-way permit application and $5,000 license and permit bond Info Only 1 | P a g e December 20, 2023 City of Carmel Department of Public Works One Civic Square Carmel, IN 46032 RE: Carmel High School Polytechnic Building additions and renovation 502 E. Main Street, Carmel, Indiana 46032 PZ-2023-00223 TAC (FHAI Project No. 221165.01, TLF Project No. 2023-119) On behalf of Carmel Clay Schools and the Project Team we are requesting a waiver from Section 104.02 of the City of Carmel Engineering, Stormwater Technical Standards Manual based on the attached Flood Routing Map indicating the highest ponding to be below the finished floor elevation of the proposed and existing buildings, before spilling over to the next watershed area, thus not impacting the new building addition. Attached is an updated Flood Routing Exhibit – Sheet G2.1A, dated 12-19-2023 depicting the projected ponding at storm inlets (100% clogged) within the project area to elevations that would crest over to the next watershed area (shown by light blue hatching), along with drainage patterns/routing shown by Red Arrows. A Table of projected ponding elevations for 50% and 100% clogged inlet grates at each inlet structure are also shown for reference. As represented in the information noted above, the Finished Floor Elevation (FFE) = 852.88’ (matching existing buildings). The floor elevation cannot be raised due to interior circulation and exterior egress and ADA slope requirements. The Flood Protection Grade (MFPG) is 852.91’ based on a 1.0’ freeboard elevation above the highest cresting elevation (MLAG) = 851.91’ at storm structure ST-102. While the FFE is approximately 0.03’ under the MFPG requirement providing 1.0’ freeboard above the highest ponding elevation, the storm water would never enter the building FFE. We hope you will take this request under consideration and accept this waiver request on behalf of Carmel Clay Schools and the Project Team, and if you have any question or need additional information, please feel free to call me at 317-506-6298. Best Regards, Pete M. Rankovich Pete M. Rankovich, P.E. | TLF 3901 W. 86th Street Suite 200 | Indianapolis, IN 46268 | Office: (317) 334-1500 Ext. | Direct Dial: (317) 224-0423 Mobile: (317) 506-6298 | Fax: (317) 334-1552 | : prankovich@tlf-engineers.com | www.TLF-Engineers.com Attachments: Flood Routing Plan – Sheet G2.1A Cc: John Thomas, Alex Jordan, Caleb Warner (City of Carmel) Justen Hochstetler, Willie Hall (Crossroads) Roger McMichael, Todd Fenoglio, (Carmel Clay School Corp) Tyler Barker (Skillman) David Roan, Andy Miller, Gregg Dixon (Fanning Howey) LOT 15LOT 16FDCFDCFDC FDC FDC FDCDNUPUPCONSTRUCTIONTRADES LABC106ADVANCED MFG.INNOVATION LABC116COMPUTER ARTROOMC120TEACHERSWORKROOMC122CERAMICSCLASSROOM / LABC123DRAWINGCLASSROOM / LABC125DRAWINGCLASSROOM / LABC126DRAWINGCLASSROOM / LABC127JEWELRYCLASSROOM / LABC128PHOTOGRAPHYC129STORAGEC123ASTORAGE /MATERIALSC123BSTORAGEC117ASTORAGE /MATERIALSC117BDEPT. HEADOFFICEC122ASTORAGEC131AMEDIA DATAC131BDARKROOMC119ACORRIDORC131CMEDIA DATAC101CCORRIDORC101FCORRIDORC131CULINARY ARTSC124ADVANCEDCONSTRUCTIONTRADES LABC106BAUTOMOTIVESERVICES LABC115BADVANCEDAUTOMOTIVESERVICES LABC115CORRIDORC131CLASSROOMC107ADVANCED MFG.ARTISAN LABC107ACAD LABC109CAD LABC110STORAGEC101LOADING /RECEIVINGSTORAGEC101ATV CLASSROOMC141OFFICEC141BPASSAGEC138ASTUDIOC138BSTUDIOC138CSTUDIOC138DSTUDIOC138ESTUDIOC138CULINARY ARTSC124CLOSETC124ADRY GOODSC124BWALK-INC124CSTORAGEC101VESTIBULEC101GELECTRICALC100BCAD LABC114STORAGEC115ASPRAY BOOTHC115CADVANCED MFG.CLEAN LABC116ASTORAGEC106AC107BCORRIDORC101JCORRIDORC101H-C152NEW BUILDING ADDITION16,000 SFFFE = 852.88MLAG = 851.91, MFPG = 852.91DWDW TO COOL CREEKST-201ST-202ST-204ST-203ST-206ST-207ST-205ST-104ST-103ST-101ST-102ST-301ST-302206002040COPYRIGHT 2023 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 221165.01CARMEL HIGHSCHOOLPOLYTECHNICADDITION ANDRENOVATIONCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 08/31/2023DRAWN BY: ARS317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANT100% CONSTRUCTION DOCUMENTSKEY PLANUNIT ANEW ADDITIONPLAN NORTH TLF-ENGINEERS.COM317-334-15003901 WEST 86TH STREET, ST# 200, INDIANAPOLIS, IN 4626819700317No.INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! G2.1AEMERGENCY FLOOD ROUTING PLANGRADING PLAN LEGENDEXISTING SPOT ELEVATIONMATCH EXISTING GRADETOP OF CURBBOTTOM OF CURBTOP OF RIMFINISH FLOOR ELEVATIONEXISTING CONTOUR W/ ELEVATIONPROPOSED CONTOUR W/ ELEVATIONPROPOSED SPOT ELEVATIONPROPOSED CURB ELEVATIONMEGTCBCTORTCBC750.65FFE1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONALLEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWNWERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NOGUARANTEES THAT THE UNDERGROUND UTILITIES SHOWNCOMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER INSERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THEPROJECT AREA INCLUDING UNDERGROUND UTILITYCONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITECONSTRUCTION. REPORT ANY DISCREPANCIES TO THEENGINEER.GENERAL NOTESEXISTING STORM LINEEXISTING SANITARY LINEEXISTING GAS LINEEXISTING WATER LINEEXISTING LIGHT POLEEXISTING STORM STRUCTUREEXISTING SANITARY STRUCTUREEXISTING FIRE HYDRANTPROPOSED STORM LINEPROPOSED SANITARY LINEPROPOSED MANHOLE (STORM / SANITARY)PROPOSED STORM INLETPROPOSED / RELOCATED GAS LINEEMERGENCY FLOOD ROUTING PATH100 YEAR INLET CASTING CAPACITY ELEVATION TABLESTRUCTURENUMBER100 YEAR ELEVATION(INLET 50% CLOGGED)101EXISTINGNEENAH INLETCASTING TYPE852.00TOP OF CASTINGELEVATION852.00100 YEAR ELEVATION(INLET 100% CLOGGED)852.00102R-3472851.30851.59851.91203R-3287-SB10849.65850.15850.15205R-3286-8V851.18851.18851.18201R-3286-8V851.54851.54852.54202R-3287-10V850.58850.58851.581TAC COMMENT RESPONSE11-16-20232TAC COMMENT RESPONSE12-19-202322222 TREE PRESERVATION DETAIL Drip Line. Minimum 4 foot chain link or high visibility plastic mesh fence. Metal fence post. Drip Line. Existing grade. GUIDELINES 1. Erect fence barriers around all “saved” trees near the construction activity. 2. Fence multiple trees together when possible. 3. Fence barriers shall be placed outside the drip line and as far from the tree as construction permits. 4. Fence posts shall be placed no further than 15 feet apart. 5. No staging of material or grading shall occur within the fenced tree preservation area. 1Amber Sheller From:Pete RankovichSent:Friday, December 15, 2023 3:34 PMTo:Littlejohn, David WCc:David Roan; Todd Fenoglio; Amber ShellerSubject:Carmel HS Attachments:05_2023-119_G1.1_Site Plan-G1.1.pdfHello David L. , We are responding to a couple of your TAC Review Comments on behalf of the School and Project Team, in order to complete the TAC Review process. Please See responses in Red below. TAC Review Item #37: Review Comment: Section 5.28 of the City's UDO requires wheel stops for parking spaces that are perpendicular to pedestrian sidewalks to prevent the bumper of a vehicle from projecting over the surface of the pedestrian facility. Please revise the plans to include wheel stops at this parking aisle and all other locations where parking is perpendicular to adjacent sidewalks and bollards are not proposed. We are requesting a waiver from this UDO requirement based on the maintenance issues associated with wheel stops/parking bumpers during snow removal operations and routine maintenance of pavements. The proposed sidewalk was increased to 7’ wide during design to allow for a 3’ vehicle overhang and still have 4’ of walkable space, while allowing for trees and shrubs to be planted in the 7.5’ landscape island, as well as a fire hydrant to be out of the sidewalk but away from the drive. Increasing the sidewalk would reduce the landscape island to 4.5’ and the trees would need to be eliminated. We had to remove several existing trees and were asked to replace with the ones shown below on Plan Sheet L1.1 by Daren Mindham (Carmel LS Reviewer). TAC Review Item #38 2Comment: Revise the plans to include direct pedestrian connections/crosswalks at the northwest corner of the site. When this Comment came up in the initial submittal (see clip below), it was our understanding that the direction arrows were for requested connectivity path options, and not to implement both. Figure 1 Figure 2 (NW path) DNUPUPCONSTRUCTIONTRADES LABC106ADVANCED MFG.INNOVATION LABC116COMPUTER ARTROOMC120TEACHERSWORKROOMC122CERAMICSCLASSROOM / LABC123DRAWINGCLASSROOM / LABC125DRAWINGCLASSROOM / LABC126DRAWINGCLASSROOM / LABC127JEWELRYCLASSROOM / LABC128PHOTOGRAPHYC129STORAGEC123ASTORAGE /MATERIALSC123BSTORAGEC117ASTORAGE /MATERIALSC117BDEPT. HEADOFFICEC122ASTORAGEC131AMEDIA DATAC131BDARKROOMC119ACORRIDORC131CMEDIA DATAC101CCORRIDORC101FCORRIDORC131CULINARY ARTSC124ADVANCEDCONSTRUCTIONTRADES LABC106BAUTOMOTIVESERVICES LABC115BADVANCEDAUTOMOTIVESERVICES LABC115CORRIDORC131CLASSROOMC107ADVANCED MFG.ARTISAN LABC107ACAD LABC109CAD LABC110STORAGEC101LOADING /RECEIVINGC100STORAGEC101ATV CLASSROOMC141STUDIO BOFFICEC141BPASSAGEC138ASTUDIOC138BSTUDIOC138CSTUDIOC138DSTUDIOC138ESTUDIOC138CULINARY ARTSC124CLOSETC124ADRY GOODSC124BWALK-INC124CSTORAGEC101VESTIBULEC101GELECTRICALC100BCAD LABC114STORAGEC115ASPRAY BOOTHC115CADVANCED MFG.CLEAN LABC116ASTORAGEC106AC107BCORRIDORC101JCORRIDORC101HCORRIDOR-C1528118911111611555554777771066611133334121514518222155577722248.0'4.6'6'R50'7'8.0'28.9'20.7'55212121222222227718181811181818181515232323232323232425256664444111111377720202020262617207171225203131301818733132323233333333206002040NEW BUILDING ADDITION16,000 SFSITE KEYNOTESCONCRETE PAVEMENT - SEE DETAIL D/G4.1CONCRETE SIDEWALK - SEE DETAIL A/G4.1ASPHALT PAVEMENT - SEE DETAIL O/G4.1CONCRETE STOOP - SEE STRUCTURAL DRAWINGLAWN AREA - SEE LANDSCAPE PLAN L1.0CONCRETE CURB - SEE DETAIL H/G4.1EXTERIOR STORAGE MASONRY SCREEN WALL - SEE ARCHITECTURAL PLANSROLLING GATE WITH CITY SCAPES - TOUGHGATE (PVC VERTICAL PLANK INFILL UNDERGROUND STORMWATER DETENTION AREA - SEE DRAWING SU1.1 & SU2.1DOUBLE SWING GATE (TWO 10'-0" GATES) WITH CITY SCAPES - TOUGHGATE (PVC1234567PROPOSED SITE LEGENDEXISTING BUILDINGPROPOSED BUILDING ADDITIONEXISTING LIGHT POLEEXISTING STORM STRUCTUREEXISTING SANITARY STRUCTUREEXISTING FIRE HYDRANTPROPOSED CONCRETE PAVEMENT/SIDEWALKPROPOSED STORM STRUCTUREPROPOSED SANITARY STRUCTUREPROPOSED LAWN AREA8PARKING SUMMARYHARD SURFACE91011COPYRIGHT 2023 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 221165.01CARMEL HIGHSCHOOLPOLYTECHNICADDITION ANDRENOVATIONCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 08/31/2023DRAWN BY: ARS317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANT100% CONSTRUCTION DOCUMENTSKEY PLANUNIT ANEW ADDITIONPLAN NORTH TLF-ENGINEERS.COM317-334-15003901 WEST 86TH STREET, ST# 200, INDIANAPOLIS, IN 4626819700317No.INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! G1.1SITE PLAN121.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDEDBY CEC - CIVIL & ENVIRONMENTAL CONSULTANTS, INC DATED MAY 19, 2023. THEENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWNCOMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE ORABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREAINCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIORTO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THEENGINEER.4.SEE SHEET G1.2 FOR STRIPING AND SIGNAGE PLAN.5.SEE SHEET G1.3 FOR CONCRETE JOINTING PLAN.6.THE PROPOSED STORM SEWER SYSTEM FOR THIS PROJECT WILL BE PRIVATEOWNED.7.FLOOD ROUTING PATH FROM PARKING LOT WHEN 100 YEAR FLOOD ISEXCEEDED. PATH TRAVELS IN A NORTHERLY DIRECTION TO EXISTING INLETSLOCATED ON THE NORTH SIDE OF BRIDGE OVER COOL CREEK.8.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT.9.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIREDFOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSEDDEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITHTHE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONEFOOT OF PROPOSED RIGHT-OF-WAY LINE.10.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THESATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THECONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITYPRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTINGCONDITION OF THE RIGHT-OF-WAY.GENERAL NOTESDOUBLE SWING GATE (2 - 6'-0" GATES) WITH CITY SCAPES - TOUGHGATE (PVC135' WIDE SWING GATE WITH CITY SCAPES - TOUGHGATE (PVC VERTICAL PLANK1415PRECAST PARKING BUMPER - SEE DETAIL D/G4.28' HT. CITY SCAPES COVRIT SCREENWALL ENCLOSURE WITH VERTICAL PLANKS AND STANDARD STIFFENER, FENCE PANELS AND POSTS, DOUBLE SWING GATEINFILL SERIES - MADISON STYLE) 8'-0" HEIGHT WITH WEATHERPROOF PANIC1617ALUMINUM HANDRAIL - SEE DETAIL E/G4.2EXISTING BUILDINGEXISTING BUILDINGEXISTING BUILDINGPROPOSED ASPHALT PAVEMENT18R100'R100'R15'R3'R10'R5'R20'R10'R2'R2 'R10'R15'R5'R2 5 'TRASH DUMPSTER ENCLOSURE - SEE ARCHITECTURAL PLANS & DWG 10/S3.01, 19STEEL BOLLARD - PER DETAIL Q/G4.1 20CONCRETE/ASPHALT INTERFACE - DETAIL G/G4.121MONOLITHIC CURB & WALK - SEE DETAIL B/G4.122PAVEMENT MARKING - SEE STRIPING AND SIGNAGE PLAN G1.21 0 . 0 'CONCRETE COLLAR - SEE DETAIL N/G4.123CONCRETE EQUIPMENT PAD (±25'-0" X ±20'-0") FOR DUST COLLECTOR AND WELDING 24EXHAUST - SEE DETAIL M/G4.1 (COORDINATE WITH MEP PLANS FOR SIZE AND ADA PARKING SIGN - SEE STRIPING AND SIGNAGE PLAN G1.225CONCRETE EQUIPMENT PAD (12' X 20') WITH ABOVE GROUND TANK - SEE DETAIL M/G4.1 (REFER TO MEP PLANS FOR SIZE AND LOCATION)SHREDDED HARDWOOD MULCH PLANTING BED - SEE LANDSCAPE PLAN L1.0OIL CONTAINMENT TANK, CONCRETE PIT AND CANOPY, SEE SHEET G4.2 FOR 26LOCATION)PROVIDE TWO SWING GATES, CITY SCAPES - TOUGHGATE (PVC VERTICAL PLANK INFILL SERIES - MADISON STYLE) SERIES - MADISON STYLE) FOR A 12'-0" WIDE OPENING AND 8'-0" HEIGHTVERTICAL PLANK INFILL SERIES - MADISON STYLE) 8'-0" HEIGHTVERTICAL PLANK INFILL SERIES - MADISON STYLE) 8'-0" HEIGHTHARDWARE MOUNTED TO DOOR ADDITIONAL LAYOUT INFORMATION AND STRUCTURAL PLAN SHEET S1.01 & 2 2 . 0 '6'SEE ENLARGEMENT B/G4.3SEE ENLARGEMENT A/G4.3SEE ENLARGEMENT A/G4.4TAPER CURB FROM 6" TO 1"271TAC REVIEW9-19-20232ADDENDUM 210-04-202310'6" PIPE BOLLARD - SEE DETAIL 1/G4.130NEW TRENCH DRAIN - SEE DETAIL ON SHEET SU2.1313TAC COMMENT RESPONSE11-16-2023APPROXIMATE LIMITS OF CONSTRUCTION32ADA RAMP - SEE DETAIL R/G4.1 (SIMILAR)EXISTING/RELOCATED SIGN - SEE STRIPING AND SIGNAGE PLAN G1.233DETAILS 12 & 17/S3.03 UPUPADVANCED MFG.INNOVATION LABC116DRAWINGCLASSROOM / LABC125DRAWINGCLASSROOM / LABC126DRAWINGCLASSROOM / LABC127JEWELRYCLASSROOM / LABC128CULINARY ARTSC124ADVANCEDCONSTRUCTIONTRADES LABC106BAUTOMOTIVESERVICES LABC115BADVANCEDAUTOMOTIVESERVICES LABC115ADVANCED MFG.ARTISAN LABC107ASTORAGEC101ATV CLASSROOMC141STUDIO BOFFICEC141BCULINARY ARTSC124CLOSETC124ADRY GOODSC124BWALK-INC124CVESTIBULEC101GCAD LABC114STORAGEC115ASPRAY BOOTHC115CADVANCED MFG.CLEAN LABC116ASTORAGEC106AC107BCORRIDORC101JCORRIDORC101H-C152Pumper Fire Truck40822Pumper Fire TruckOverall Length40.000ftOverall Width8.167ftOverall Body Height7.745ftMin Body Ground Clearance0.656ftTrack Width8.167ftLock-to-lock time5.00sMax Wheel Angle45.00°COPYRIGHT 2023 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 221165.01CARMEL HIGHSCHOOLPOLYTECHNICADDITION ANDRENOVATIONCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 08/31/2023DRAWN BY: ARS317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANT100% CONSTRUCTION DOCUMENTSKEY PLANUNIT ANEW ADDITIONPLAN NORTH TLF-ENGINEERS.COM317-334-15003901 WEST 86TH STREET, ST# 200, INDIANAPOLIS, IN 4626819700317No.INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! EXHIBIT AFIRE TRUCK TURNING PLAN1TAC COMMENT RESPONSE11-16-2023