Loading...
HomeMy WebLinkAboutGN120 - MASTER PARKING PLAN - GD0.2UP REF.23'-8 5 /8 " 26'-6 3/ 8 " 23'-8 5/ 8 "28'-0 3 /8 " 20'-8" 32'-7 5/ 8 " 20'-8 " 175'- 11 5/ 8 " 76'-0 "26'-0"76'-0" 52'-8" 31'-10"18'-9 5/8"PROPOSED NATATORIUMBUILDING ADDITIONF.F.E.= 831.98F.F.E.= 831.98F.F.E.= 831.98F.F.E.= 834.65FH1FH2FH4FH3GSMOKEY ROW ROAD / E 136TH STREETE MAIN STREET3101261254831214131010987654321112210268158GD0.2MASTER PARKING PLAN1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.2.BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN WEREPROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECTAREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTHPRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TOTHE ENGINEER.GENERAL NOTESKEYNOTESPROPOSED BICYCLE RACKS MOUNTED TO EXISTING SIDEWALKS(NOT IN CONTRACT)PROPOSED BICYCLE RACKS MOUNTED TO NEW SIDEWALKS(NOT IN CONTRACT)11THE NUMBERS SHOWN IN THE SYMBOLS BELOW INDICATE THE QUANTITY OFBICYCLE RACKS PROPOSED IN A PARTICULAR AREA.1THE NUMBERS SHOWN IN THE SYMBOL BELOW INDICATE DESIGNATEDPARKING LOT IDENTIFICATION.PARKING LOT IDENTIFICATION NUMBERBICYCLE RACK LOCATION SUMMARY TABLE(NOT IN CONTRACT)LOCATIONBICYCLE RACKSMAIN BUILDING94FOOTBALL STADIUM28123137TENNIS COURTSMURRAY STADIUMTOTAL BICYCLE RACKS274TOTAL BICYCLE PARKING SPACESTHE ABOVE BICYCLE RACKS ACCOMMODATE 5,480 STUDENTSBICYCLE SPACES REQUIRED = 1 PER 20 STUDENTSBUILDING AREA SUMMARYYEAR(2023 THROUGH 2024)PROJECTEXIST. AREA SF.NEW AREA SF.TOTAL AREA SF.%ADDEDREMARKS2002FRESHMAN CENTER2004LOCKER ROOM2012PHYSICAL EDUCATION2019POOL ENTRANCE #212021DOCK STORAGE2021PERFORMING ARTS776,647950,591953,243980,852981,547982,955173,9442,65227,6096951,40825,464950,591953,243980,852981,547982,9551,008,41922.400.282.900.070.142.59BZA APPROVAL WITH VARIANCESNO CLASSROOM IN ADDITIONNO CLASSROOM IN ADDITIONNO CLASSROOM IN ADDITIONNO CLASSROOM IN ADDITIONNO CLASSROOM IN ADDITION2007TENNIS BUILDING1,700SEPARATE BUILDING AT STADIUM SITE2011SECURE ENTRANCE0NO NEW CONSTRUCTION2023NATATORIUM1,008,41993,2291,101,6489.25NO CLASSROOM IN ADDITIONOVERALL PARKING SUMMARYLOT NO.LOT NAMESTANDARD SPACEOLD SENIOR LOT651EXIST.PROPOSED65ADA SPACE0EXIST.0POLICE SPACE0EXIST.0BUS SPACE0EXIST.0TOTAL SPACES65EXIST.PROPOSED65234567891012131415DOOR 719194400002323FRONT LOT103103773300113113AUDITORIUM LOT0000000000WEST LOT69690000006969FRESHMAN CENTER LOT142114661100149121FIELDHOUSE LOT2929FITNESS CENTER LOT000POOL LOT000000000TRAIL LOT221221771144229229SUBTOTAL66263426265544693665FOOTBALL HOME LOT94294218180000960960FOOTBALL SOUTH LOT162162440020 = 4020 = 40166166FOOTBALL VISITOR LOT536536660000542542FOOTBALL NORTH LOT29290000002929290000002900000000PROPOSEDPROPOSEDPROPOSED2,3622,390TOTALCITY OF CARMEL REQUIRED PARKING SPACES (174 CLASSROOMS x 10) + (583 EMPLOYEES) = 2,323(UPON COMPLETION OF THE POLYTECHNIC PROJECT)SUBTOTAL1,6691,6692828001,6971,69720 = 4020 = 40AVAILABLE PARKING SPACES UNTIL JUNE 2022 (LOTS 8 & 9) = 2,640PERMIT PARKING SPACES = 1334 (STUDENTS) + 583 (EMPLOYEES) = 1,917NOTES:1.THE CARMEL HIGH SCHOOL PARKING POLICY IS BASED ON PERMIT ISSUED PARKING. THERE ARE 1,917 PERMITS ISSUED.2.ENROLLMENT IS EXPECTED TO DROP BY 75 STUDENTS IN 2022 AND REMAIN LEVEL THROUGH 2029.3.BUS PARKING AT THE FOOTBALL STADIUM IS CURRENTLY 21 SPACES. THESE SPACES CAN ALSO BE USED FOR STUDENT PARKING AT TWO (2)STANDARD VEHICLE SPACES FOR EACH BUS SPACE. THE 21 BUS PARKING SPACES ALLOWS FOR 42 STUDENT PARKING SPACES.4.THE NATATORIUM PROJECT IS SCHEDULED FOR CONSTRUCTION IN JUNE OF 2022. LOTS 8 & 9 WITH 141 SPACES WILL BE AVAILABLE UNTIL THEN.5.THE CLASSROOM COUNT OF 174 EXCLUDES LABS AND OTHER EXTENDED LEARNING AREAS AS THE LATTER ARE SUPPLEMENTAL TOCLASSROOMS, AND ARE NOT OCCUPIED AT THE SAME TIME AS CLASSROOMS.11MURRAY FIELD LOT14142200001616AVAILABLE PARKING SPACES AFTER JUNE 2022 = 2,347AVAILABLE PARKING SPACES AFTER DECEMBER 2024 = 2,3592006000200400COPYRIGHT 2023 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 221165.01CARMEL HIGHSCHOOLPOLYTECHNICADDITION ANDRENOVATIONCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 08/31/2023DRAWN BY: ARS317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANT100% CONSTRUCTION DOCUMENTSKEY PLANUNIT ANEW ADDITIONPLAN NORTH TLF-ENGINEERS.COM317-334-15003901 WEST 86TH STREET, ST# 200, INDIANAPOLIS, IN 4626819700317No.STADIUM - GREYHOUNDACTIVITY CENTER PROJECT(UNDER CONSTRUCTION)STADIUM - SOUTH SUPPORTBUILDING(UNDER CONSTRUCTION)NATATORIUM(UNDER CONSTRUCTION)POLYTECHNIC ADDITION &RENOVATION2024POLYTECHNIC1,101,64816,0001,117,6481.45LABORATORIES/CLASSROOMS1TAC REVIEW9-19-2023