Loading...
HomeMy WebLinkAboutC010 - Site Demolition Plan -GD1.1FDCFDCFDC FDC FDC FDC33333334444101014141422219555588881313126111111116151515222634341529171717171717171717343321181818922420182939925252525252662333318433272710282828151532932929292929181818181532918182721528181515157313118313231334343624133013131414182513877734169343253131823TPTPTP TPTPTPTPTPTPTP TPTPTP TP TP TP TP TP TP TP 3333333333TPTPTP 3333153329292942918343131313536TPTPTPTPTPTPTPTPTPTP2 29293341818333333153737206002040INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! GD1.1DEMOLITION PLANDEMOLITION LEGENDEXISTING BUILDINGAPPROXIMATE LIMITS OF CONCRETE REMOVAL DEMOLITION KEYNOTES1.REMOVE CONCRETE PAVEMENT2.REMOVE CONCRETE SIDEWALK & CURB3.REMOVE CONCRETE CURB4.REMOVE ASPHALT PAVEMENT5.REMOVE MASONRY SCREEN WALL AND FOUNDATIONS6.REMOVE METAL PANEL SCREEN WALL AND FOUNDATIONS.7.REMOVE 18" RCP STORM SEWER8.REMOVE 10" VCP SANITARY SEWER9.REMOVE STORM STRUCTURE10.REMOVE LIGHTPOLES (3 TOTAL)11.EXISTING CONCRETE VAULT (INCLUDING CAP WALLS AND SLAB) & 20,000 FUELTANK TO BE REMOVED, AND SOIL TO BE REMEDIATED AS REQUIRED BYOWNER/OTHERS. COORDINATE REMOVAL AND CAPPING OF EXISTING FUEL LINESWITH MEP PLANS.12.REMOVE EXISTING BUILDING STRUCTURE. SEE ARCHITECTURAL PLANS13.REMOVE ELECTRICAL LINES. COORDINATE WITH ELECTRICAL SITE PLANS.14.REMOVE/RELOCATE EXISTING GAS LINE. COORDINATE REMOVALS WITHCENTERPOINTE ENERGY.15.REMOVE TREES AND SHRUBS16.REMOVE 8" DIP WATER LINE17. REMOVE PIPE BOLLARDS AND FOUNDATIONS18.PAVEMENT SAWCUT LINE19.REMOVE EXISTING ABANDONED GREASE TRAP20.REMOVE WASTE OIL/FREEZE TANK, CONCRETE SLAB AND FOUNDATION WALLSFULL DEPTH. REMOVE CANOPY STRUCTURE, SALVAGE AND RETURN TO OWNER.CAP EXISTING LINES AT 6" FROM FACE OF BUILDING. COORDINATE PIPINGREMOVAL WITH MEP.21.REMOVE CONCRETE EQUIPMENT PAD. SEE MEP PLANS FOR REMOVAL OFEQUIPMENT PAD.22.REMOVE HANDRAIL. PROTECT EXISTING RETAINING WALL DURINGCONSTRUCTION. COORDINATE WITH ARCHITECTURAL AND STRUCTURAL PLANS.23. REMOVE SWING GATE24.REMOVE SECTION OF EXISTING RETAINING WALL AND FOUNDATION.COORDINATE LIMITS OF REMOVAL WITH ARCHITECTURAL AND STRUCTURALPLANS.25.CAP EXISTING PIPE WITH MECHANICAL PLUG - SEE DETAIL ON SU2.126.REMOVE SLIDING CHAINLINK FENCE, GATE, AND FOUNDATIONS.27.REMOVE CONCRETE SIDEWALK28.PROTECT LIGHT POLE TO REMAIN29.PROTECT CURB TO REMAIN30.REMOVE ELECTRICAL MANHOLE. COORDINATE REMOVALS WITH ELECTRICALSITE PLAN.31.REMOVE 8" DIP WATER LINE.32.REMOVE POST INDICATOR VALVE. (ABANDONED - CONTRACTOR TO CONFIRM)33. PROTECT TREES TO REMAIN - PER DETAIL F/L2.034.REMOVE 8" ABANDONED WATER LINE35.REMOVE EXISTING VALVE AND 8' OF 6" DIP DOMESTIC WATER LINE (FIELD VERIFYLOCATION OF VALVE) CAP 6" FLANGE TO THE EAST AT THE EXISTING 8"X8"X6" TEE36.REMOVE EXISTING VALVE37.REMOVE CROSSWALK PAVEMENT MARKINGSCREEN WALLTANKSEXISTING STORM LINEEXISTING SANITARY LINEEXISTING GAS LINEEXISTING WATER LINEEXISTING LIGHT POLEEXISTING STORM STRUCTUREEXISTING SANITARY STRUCTUREEXISTING FIRE HYDRANTAPPROXIMATE LIMITS OF UTILITY LINE REMOVALAPPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVALCOPYRIGHT 2023 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 221165.01CARMEL HIGHSCHOOLPOLYTECHNICADDITION ANDRENOVATIONCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 08/31/2023DRAWN BY: ARS317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANT100% CONSTRUCTION DOCUMENTSKEY PLANUNIT ANEW ADDITIONPLAN NORTH TLF-ENGINEERS.COM317-334-15003901 WEST 86TH STREET, ST# 200, INDIANAPOLIS, IN 4626819700317No.1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDEDBY CEC - CIVIL & ENVIRONMENTAL CONSULTANTS, INC DATED MAY 19, 2023.THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIESSHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE ORABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECTAREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTHPRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TOTHE ENGINEER.4.THE PROPOSED STORM SEWER SYSTEM FOR THIS PROJECT WILL BE PRIVATEOWNED.5.FLOOD ROUTING PATH FROM PARKING LOT WHEN 100 YEAR FLOOD ISEXCEEDED. PATH TRAVELS IN A NORTHERLY DIRECTION TO EXISTING INLETSLOCATED ON THE NORTH SIDE OF BRIDGE OVER COOL CREEK.6.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT.7.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIREDFOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSEDDEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVEWITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TOWITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.8.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TOTHE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THECONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THECITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTINGCONDITION OF THE RIGHT-OF-WAY.GENERAL NOTESEXISTING BUILDINGEXISTING BUILDINGEXISTING BUILDING1TAC REVIEW9-19-20232ADDENDUM 210-04-20233TAC COMMENT RESPONSE11-16-2023APPROXIMATE LIMITS OF CONSTRUCTIONTPTPTP TREE PROTECTION REQUIRED4TAC COMMENT RESPONSE12-19-20235PR-011-5-202462-1-2024PR-05, TAC RESPONSE