HomeMy WebLinkAboutA200 - UNIT A - BUILDING ELEVATIONSBUILDING ELEVATION NOTES
VERIFICATION NOTE
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
CLEARANCES AND ALL EXISTING FIELD CONDITIONS
BEFORE STARTING CONSTRUCTION. COMMENCEMENT
OF WORK CONSTITUTES ACCEPTANCE OF CONDITIONS.
SHOULD DIFFERENT CONDITIONS BE ENCOUNTERED,
CONTACT THE ARCHITECT BEFORE PROCEEDING WITH
WORK.
(ALL NOTES MAY NOT BE INDICATED ON THIS SHEET)
ELEVATION GENERAL NOTES
X
1. REFER TO THE ELECTRICAL AND TECHNOLOGY
DRAWINGS FOR CAMERA, LOCATIONS, SECURITY
DEVICES, RECEPTACLES, LIGHT FIXTURES, ETC.
COORDINATE LOCATIONS WITH VENEER
COURSING TO PROVIDE CONSISTENT MOUNTING
HEIGHTS.
2. REFER TO PLUMBING DRAWINGS FOR EXTERIOR
WALL HYDRANTS, SECONDARY ROOF DRAIN
OUTLETS, ETC. COORDINATE PENETRATIONS
THROUGH EXTERIOR ENVELOPE WITH OTHER
TRADES. PROVIDE TRANSITION MEMBRANE TO
MAINTAIN AIR BARRIER SYSTEM.
3. REFER TO MECHANICAL DRAWINGS FOR
EXTERIOR LOUVER LOCATIONS LOCATED IN
EXTERIOR WALL AND EXTERIOR SOFFITS.
COORDINATE PENETRATIONS THROUGH
EXTERIOR ENVELOPE WITH OTHER TRADES.
PROVIDE TRANSITION MEMBRANE TO MAINTAIN
AIR BARRIER SYSTEM.
FIRST FLOOR
EL 100'-0"
T/STEEL
EL 126'-0"
1
A4.01
___________1
A5.01
___________4
A4.01
___________
11
1
A5.02
___________
1
3
1
5
3
1
6
8
5
2
6
EJ EJ
EJ
EJ
EJ
EJ EJ EJ EJ
EJ
7
5
7
3
5
6
8
5
911
2
10
4
8
6
12
7
17
1
A5.03
___________
2
A5.02
___________
13
BEYOND
1
17
TYP.
16
EJ EJEJ EJ EJ EJEJ EJ
9
A2.02
___________
21 21
FIRST FLOOR
EL 100'-0"
FIRST FLOOR
EL 100'-0"
T/STEEL
EL 126'-0"
T/STEEL
EL 126'-0"
2
A4.01
___________3
A4.01
___________2
A5.01
___________
3
A5.02
___________
1
A5.01
___________
SIM.
3
1
5
6
8
5
11
2
10
4
8
6
1
1
3
13
BEYOND
8
6
EJ EJ EJ EJ EJ EJ
18
EJ
17
21
FIRST FLOOR
EL 100'-0"
FIRST FLOOR
EL 100'-0"
T/STEEL
EL 126'-0"
T/STEEL
EL 126'-0"
2
A4.01
___________3
A4.01
___________1
A5.04
___________
1
6
8
5 2
4
7 7
2
6
8
1
13
BEYOND
14
EJ
EJ EJ EJ EJ
EJ EJ EJ
EJ
6
EJ
15
17
18 19
20
TYP.
3
A5.01
___________
17
EJ EJ
T/STEEL
EL 126'-0"
T/STEEL
EL 126'-0"
4
A4.01
___________4
A5.01
___________
8
6
13
8
6
3'-0"9'-0 3/8"8'-0" TYP.8'-1 9/16"8'-0" TYP.
1414 148
8
COPYRIGHT 2023 BY FANNING/HOWEY ASSOCIATES, INC.
KEY PLAN
UNIT A
WWW.FHAI.COM
ARCHITECT
NEW ADDITION
9/13/2023 6:02:26 PM\\data1\citrixprofiles$\droan\upm_profile\Documents\2021_ARCH_221165.01_droanR3Y2M.rvtPROJECT NUMBER: 221165.01
CARMEL HIGH
SCHOOL
POLYTECHNIC
ADDITION AND
RENOVATION
CARMEL CLAY SCHOOLS
520 EAST MAIN STREET
CARMEL, IN 46032
UNIT A -BUILDING ELEVATIONS
A3.01
PROJECT ISSUE DATE: 09/20/2023
REGULATORY REVIEW
DRAWN BY: DSR
317-848-0966
350 E. NEW YORK ST. SUITE 300, INDIANAPOLIS, IN 46204
SCALE: 1/8" = 1'-0"
BUILDING ELEVATION - NORTH1
SCALE: 1/8" = 1'-0"
BUILDING ELEVATION - EAST3
SCALE: 1/8" = 1'-0"
BUILDING ELEVATION - WEST2
SCALE: 1/8" = 1'-0"
BUILDING ELEVATION - SOUTH4 NO.DESCRIPTION
1 ANCHORED BRICK VENEER.
2 BRICK VENEER SOLDIER COURSE AT DOOR HEADS. SEE
DOOR DETAILS FOR ADDITIONAL INFORMATION.
3 ALUMINUM FRAMED STOREFRONT SYSTEM.
4 4" TALL CAST STONE BAND / CAP WITH CUT DRIP EDGE.
PROVIDE BACKER ROD AND CONTINUOUS SEALANT AT ALL
JOINTS.
5 8" TALL CAST STONE BAND / CAP WITH CUT DRIP EDGE.
PROVIDE BACKER ROD AND CONTINUOUS SEALANT AT ALL
JOINTS.
6 METAL COMPOSITE MATERIAL (MCM) WALL PANEL SYSTEM.
7 GLAZED SECTIONAL DOOR SYSTEM. SEE DOOR SCHEDULE
FOR ADDITIONAL INFORMATION.
8 PRE-FINISHED METAL COPING SYSTEM.
9 VERTICAL SLAT FENCE ENCLOSURE WITH SWING GATE. SEE
CIVIL FOR ADDITIONAL INFORMATION.
10 VERTICAL SLAT ROLLING GATE. SEE CIVIL FOR ADDITIONAL
INFORMATION.
11 PRE-ENGINEERED METAL WALKWAY COVERING SYSTEM
WITH INTEGRAL DOWNSPOUTS.
12 EXISTING BRICK VENEER / CMU WALL TO REMAIN. MODIFY
ONLY AS REQUIRED FOR INSTALLATION OF NEW EXTERIOR
WALL AND NEW ALUMINUM STOREFRONT WINDOW.
13 24" WIDE FIXED ALUMINUM ACCESS LADDER WITH
PLATFORM OVER PARAPET, SIMILAR TO O'KEEFES MODEL
503.
14 PRE-FINISHED METAL LOUVER. SEE MECHANICAL FOR
ADDITIONAL INFORMATION.
15 EXISTING CONCRETE RETAINING WALL AND METAL
GUARDRAIL TO REMAIN. PROTECT FROM DAMAGE DURING
CONSTRUCTION.
16 MECHANICAL EQUIPMENT. SEE MECHANICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
17 LIGHT FIXTURE. SEE ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
18 PREFORMED JOINT SEAL. SEE PLAN DETAILS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
19 PRE-FINISHED METAL COPING SYSTEM TO MATCH
ADJACENT PROFILE AND COLOR ON EXISTING BUILDING.
20 TURN METAL COPING VERTICALLY AT END WALL TO CAP
WALL AND SHED OVER ADJACENT, LOWER COPING.
21 STANDING SEAM METAL ROOF ASSEMBLY. SEE ROOF PLANS
FOR ADDITIONAL INFORMATION.PLANNORTHREV.
NO.DESCRIPTION DATE