Loading...
HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 1 Addressing Dave McCoy 9/26/23 11:24 AM Comment Address for Lot 2 will be 510 N Rangeline Rd, Carmel, IN 46032. Info Only 2 1 Engineering Alex Jordan 10/2/23 1:43 PM Changemark Will the improvement proposed in ProjectDox task "PZ-2021-00195 DP ADLS - Matriarch Birth Center" be installed following the lot split? If so, we will need to see all necessary easement for the development on this plat. 21-008-P-plat (1).pdf Responded by: Doug Hall - 11/3/23 11:31 AM The immediate intent is to be able to sell off the existing structure / Lot 1 located at 510 N. Rangeline. Now the propsed use and building design of Lot 2 is TBD. Info Only 3 1 Engineering Alex Jordan 10/2/23 1:43 PM Changemark Will this parcel be common area? If so, please label it as such. If it will not be common area, will it be owned by one of the lots being created? 21-008-P-plat (1).pdf Responded by: Doug Hall - 11/3/23 11:51 AM That area will be dedicated as an alley, D & U E. Info Only 4 1 CrossRoad Engineers Willie Hall 10/2/23 4:07 PM Comment Please provide all information as required per 102.05 of the Carmel STSM. Responded by: Doug Hall - 1/30/24 1:23 PM REQUESTED INFORMATION HAS BEEN RE-SUBMITTED FOR REVIEW UNDER PZ-2021-00195 DP ADLS PROJECT . Resolved 5 1 CrossRoad Engineers Willie Hall 10/2/23 4:08 PM Comment It appears that the submission is only a Primary Plat, not a Secondary Plat. Since this is a PP & SP submission, please provide the SP for review. Responded by: Doug Hall - 1/30/24 1:24 PM SP HAS BEEN SUBMITTED PREVIOUSLY FRO REVIEW DIRECT TO PLANNING STAFF TO INCLUDE THE REQUIRE CAD FILE. Resolved 6 1 CrossRoad Engineers Willie Hall 10/2/23 4:09 PM Comment Please verify whether this submission is related to the PZ-2021-00195 DP ADLS - Matriarch Birth Center project. If it is, there were still several outstanding comments that will need to be addressed prior to approval of this submission. Responded by: Doug Hall - 11/3/23 11:23 AM This is related to PZ-2021-00195 DP ADLS Resolved REVIEW COMMENTS Plan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 7 1 CrossRoad Engineers Willie Hall 10/2/23 4:11 PM Comment Please note that additional comments may be forthcoming based on submission of the requested information. Responded by: Doug Hall - 5/28/24 8:04 PM noted ---------------------------------------------------------- Responded by: Doug Hall - 5/7/24 12:23 PM NOTED ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:20 AM noted ---------------------------------------------------------- Responded by: Doug Hall - 1/30/24 1:25 PM NOTED/ UnResolved 8 1 Building & Code Services Mike Sheeks 10/5/23 3:34 PM Comment Please see Crossroads comments. Thank you. Responded by: Doug Hall - 1/30/24 1:22 PM COMMENTS ANSWERED AND REVISED PROJECT RE- SUBMITTED TODAY. Resolved 9 1 Planning & Zoning Alexia Lopez 10/5/23 5:07 PM Changemark Buildings over Property Lines The metal garage and block garage buildings will need to be demolished or a variance granted as they do not meet the minimum building setback as they straddle a property line. Please let me know which route you will be going. 21-008-P-plat (1).pdf Responded by: Doug Hall - 11/3/23 11:46 AM Those existing accessory structures have been demoed at this point. Resolved 10 1 Planning & Zoning Alexia Lopez 10/5/23 5:07 PM Changemark Minimum Side Setback for Lot 1 Please adjust the lot line so that the existing building will meet the minimum 5 ft. side yard setback. 21-008-P-plat (1).pdf Reviewer Response: Alexia Lopez - 2/14/24 11:26 AM At the Plan Commission meeting I believe Justin Moffett said that this portion that is closer to the property line is a deck and it will be removed. ---------------------------------------------------------- Responded by: Doug Hall - 11/3/23 11:53 AM Proposed buiding have been moved for this accomodation. Resolved 11 1 Planning & Zoning Alexia Lopez 10/5/23 5:10 PM Changemark Update Street Names Please update the street names. I believe 6th Street is now Doane Way and 5th Street is Small St. 21-008-P-plat (1).pdf Responded by: Doug Hall - 11/3/23 11:58 AM Names updated as requested. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 12 1 Vectren Energy Chad Miller 10/9/23 11:41 AM Changemark CenterPoint Energy Please have the developer call the new service center at 1-800-990-1930 to have the two existing services retired and the gas meters removed if the existing homes will be demoed. 21-008-P-plat (1).pdf Info Only 13 1 Planning & Zoning Alexia Lopez 10/9/23 8:57 PM Comment Please submit future drawings as PDFs and individual sheets. And please be sure to name revised drawings with the same name as the original drawing and ProjectDox will version it for us. Responded by: Doug Hall - 5/10/24 12:23 PM noted and done ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:24 AM noted and done. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 2/14/24 4:15 PM Keeping this comment here as a reminder. ---------------------------------------------------------- Responded by: Doug Hall - 11/3/23 1:23 PM will do Resolved 14 1 Planning & Zoning Alexia Lopez 10/9/23 9:07 PM Changemark Proposed Lot Layout Please put this proposed Lot Layout onto its own sheet. 21-008-P-plat (1).pdf Responded by: Doug Hall - 11/3/23 12:26 PM Sheet added Resolved 15 1 Planning & Zoning Alexia Lopez 10/9/23 9:08 PM Changemark Drainage and Utility Easement This easement should be labeled as common area or it should be a part of one of the lots. Please correct. 21-008-P-plat (1).pdf Reviewer Response: Alexia Lopez - 2/14/24 3:12 PM Petitioner indicated that this area will be dedicated as a public alley instead of a common area. ---------------------------------------------------------- Responded by: Doug Hall - 11/3/23 12:00 PM That easement served a specific purpose as being designated as the BMP easement for the project. That area is already also included in the Common Area and DUE designations. Our intent is to have the BMP easement over that portion of the common are that will serve as our "dry basin" Resolved 16 1 Planning & Zoning Alexia Lopez 10/9/23 9:18 PM Changemark Easement for Shared Parking? Will there be an easement here for the parking shown on the plans for the Matriarch Birth Center? 21-008-P-plat (1).pdf Responded by: Doug Hall - 11/3/23 12:02 PM Yes, shared parking will occur within this easement. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 17 1 Planning & Zoning Alexia Lopez 10/9/23 9:30 PM Changemark Add Zoning to Plat Please list the Zoning for the parcels. 21-008-P-plat (1).pdf Responded by: Doug Hall - 1/30/24 1:28 PM added as requested. Resolved 18 1 Planning & Zoning Alexia Lopez 10/9/23 9:32 PM Changemark Add Owner and Subdivider Info Please add the Name, address, telephone number of the owner and the subdivider. 21-008-P-plat (1).pdf Responded by: Doug Hall - 11/3/23 12:44 PM added as requested Resolved 19 1 Planning & Zoning Alexia Lopez 10/9/23 9:34 PM Changemark Vicinity Map Please add a better Vicinity Map. This one is not useful as it does not show the names of the streets. You can use the Carmel GIS maps to get a zoomed out view of the area to create a vicinity map. https://carmelgis.carmel.in.gov/maps/apps/webappviewer/index.html? id=3005d15bb8ee47c48538605fa421a359 21-008-P-plat (1).pdf Responded by: Doug Hall - 11/3/23 12:45 PM map updated as requested Resolved 20 1 Planning & Zoning Alexia Lopez 10/9/23 9:40 PM Changemark Docket Number Add the Docket Number to the Primary Plat 21-008-P-plat (1).pdf Responded by: Doug Hall - 11/3/23 12:48 PM that appears at the top of the drawing page under the title Resolved 21 1 Planning & Zoning Alexia Lopez 10/9/23 10:35 PM Changemark Tree Preservation Are you proposing to save any of the existing trees on the site? If so, which ones? 21-008-P-plat (1).pdf Responded by: Doug Hall - 11/3/23 12:46 PM That is shown on the demo plan in the set under review as part of the DP / ADLS process. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 22 1 Transportation Systems David Littlejohn 10/17/23 10:58 AM Changemark 10' path required along Range Line Rd. The City's Mobility and Pedestrian plan requires a 10' multi-use path along Range Line Rd. You may elect to provide a monetary commitment equal to the value to otherwise design and construct the improvements along the roadway frontage. If you choose to provide a commitment in lieu of constructing the path, please work with the Engineering Department to determine the appropriate commitment amount to fulfill this requirement 21-008-P-plat (1).pdf Responded by: Doug Hall - 5/28/24 7:49 PM The election has been made by developer. They will be in contact with Egnineering post haste. ---------------------------------------------------------- Reviewer Response: David Littlejohn - 5/24/24 10:23 AM If you wish to request a variance for this requirement you need to submit a development standards variance request for the Board of Zoning Appeals to review. The application for a development standards variance can be found here: https://www.carmel.in.gov/home/showpublisheddocum ent/21658/638415376869100000 ---------------------------------------------------------- Responded by: Doug Hall - 5/10/24 12:31 PM same ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:52 AM We request a variance from section 1.07 Compliance of the City's UDO ---------------------------------------------------------- Reviewer Response: David Littlejohn - 2/15/24 9:48 AM The City Engineer does not have the authority to simply waive requirements from the city's ordinance. If you are not able to bring this project/site into compliance with the city's transportation plan you may request a variance from section 1.07 Compliance of the City's UDO. You may also choose to provide a monetary commitment to the city's non-reverting thoroughfare fund in lieu of constructing the required right-of-way facilities. ---------------------------------------------------------- Responded by: Doug Hall - 11/3/23 11:44 AM These requirements were waived by the Engineering in an email from last year. that email was submitted in the last re-submittal at the end of September / early October for the DP / ADLS review. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 23 1 Transportation Systems David Littlejohn 10/17/23 10:58 AM Changemark Section 1.07 Compliance with the Thoroughfare Plan Section 1.07 Compliance of the City's UDO states: E. Transportation Plan: In addition to meeting requirements of Americans with Disabilities Act (ADA), all projects and Improvements or authorizations under the planning jurisdiction that adjoin, include, are served by or affect existing streets bearing a designation in the Transportation Plan shall conform to the requirements of the Transportation Plan Section of the Comprehensive Plan in regard to: 1. The dedication of public Rights-of-way; 2. Design and construction of the improvements indicated by the Transportation Plan across the roadway frontage of the project; 3. Setback; and 4. Any other affected development standards. F. Monetary Commitment In-lieu-of Compliance: The petitioner may elect to provide a monetary commitment equal to the value to otherwise design and construct the improvements indicated by the Transportation Plan across the roadway frontage. The value of the commitment shall be equal to the difference in the value to otherwise design and construct the improvements indicated by the Transportation Plan across the roadway frontage, minus the cost to design and construct those improvements indicated by the Transportation Plan across the roadway frontage that will be installed by the petitioner. The values established above shall be approved by the Department of Engineering. Conformance with the Transportation Plan as outlined above shall be in addition to any improvements required: Please revise the plans to ensure that the property will be brought into compliance with the City's Transportation Plan 21-008-P-plat (1).pdf Responded by: Doug Hall - 5/28/24 7:51 PM The election has been made by developer. They will be in contact with Egnineering post haste. ---------------------------------------------------------- Reviewer Response: David Littlejohn - 5/24/24 10:27 AM If you wish to request a variance for this requirement you need to submit a development standards variance request for the Board of Zoning Appeals to review. The application for a development standards variance can be found here: https://www.carmel.in.gov/home/showpublisheddocum ent/21658/638415376869100000 ---------------------------------------------------------- Responded by: Doug Hall - 5/10/24 12:31 PM see replys to PZ-201-00195 DP ADLS ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 12:03 PM We request a variance from section 1.07 Compliance of the City's UDO ---------------------------------------------------------- Reviewer Response: David Littlejohn - 2/15/24 9:49 AM This is section 1.07 of the City's UDO regarding compliance with the City's Transportation Plan. The City Engineer does not have the authority to simply waive requirements from the city's ordinance. If you are not able to bring this project/site into compliance with the city's transportation plan you may request a variance from section 1.07 Compliance of the City's UDO. You may also choose to provide a monetary commitment to the city's non-reverting thoroughfare fund in lieu of constructing the required right-of-way facilities. ---------------------------------------------------------- Responded by: Doug Hall - 11/3/23 11:44 AM See response in Ref #22 Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 24 1 Planning & Zoning Alexia Lopez 10/17/23 5:11 PM Library Comment Please add a comment about Common Area Inspections to the plat. Before the developer transfers control of the owners' association under the Declaration of Covenants to the property owners, including control of a board of directors or other means of representation, the developer shall arrange for an inspection of all improvements not located on a platted lot or for which the owners' association has maintenance responsibility (a "Common Area Improvement"), including street trees. Please refer to and also see UDO Section 7.20 for more details: https://www.carmel.in.gov/government/departments-services/community- services/codes-ordinances Reviewer Response: Alexia Lopez - 2/14/24 12:32 PM Since there is no more common area now, because the common area became an alley, you do not need the Common Area Inspection wording anymore. ---------------------------------------------------------- Responded by: Doug Hall - 1/30/24 2:04 PM This will be added to the SP. Resolved 25 1 Planning & Zoning Alexia Lopez 10/17/23 5:13 PM Library Comment Staff has been advised that we cannot present a Secondary Plat to the Director for signature from this point forward until Ms. Terry Krueskamp (tkrueskamp@carmel.in.gov) in Information Systems has received an e-mail with an electronic file attached (MicroStation .dgn is preferred, or AutoCad .dwg of the subdivision) and it (the e-mail) has been copied to myself (aconn@carmel.in.gov), OR please upload a .dgn or .dwg file of the proposed plat. Responded by: Doug Hall - 5/10/24 12:26 PM just emailed over moments ago ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:24 AM digital files previously submitted ---------------------------------------------------------- Responded by: Doug Hall - 11/3/23 1:22 PM will do Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 26 1 Planning & Zoning Alexia Lopez 10/17/23 5:13 PM Library Comment Please submit a revised Secondary Plat after making above-mentioned changes. Once these changes have been made and comments addressed, please produce a Mylar copy (with the surveyors and land owners signatures) for signature by this Department. 1 digital copy of the plat must be provided with the Mylar copy, prior to recording, and then 1 paper copy and 1 electronic copy of the scanned, recorded plat must be submitted following recording of the document. Our approval of the secondary plat (signature) will be forthcoming upon revision of the plans according to the items listed above. Responded by: Doug Hall - 5/28/24 7:47 PM signed mylar copy will be delivered by a rep from OLD TOWN within the next 24 hours. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 5/15/24 11:28 AM Once changes have been and approved, you will need to submit a Mylar copy of the Plat to our office for signature. ---------------------------------------------------------- Responded by: Doug Hall - 5/10/24 12:26 PM will do ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:25 AM noted and will be submitted upon approval for signature atthe time of final approval. ---------------------------------------------------------- Responded by: Doug Hall - 11/3/23 1:22 PM will do Resolved 27 1 Planning & Zoning Alexia Lopez 10/17/23 5:13 PM Library Comment Lastly, please submit a .pdf or .jpg file of the scanned, recorded plat. Responded by: Doug Hall - 5/10/24 12:26 PM will do upon recording ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:25 AM will do ---------------------------------------------------------- Responded by: Doug Hall - 11/3/23 1:22 PM will do Info Only 28 1 Planning & Zoning Alexia Lopez 10/17/23 5:13 PM Library Comment Please provide the Dept. with a copy of the Covenants & Restrictions for this neighborhood. Responded by: Doug Hall - 1/30/24 2:05 PM None are planned for this project. Resolved 29 1 Planning & Zoning Alexia Lopez 10/17/23 5:41 PM Changemark Separate out Secondary Plat Please separate out the Secondary Plat documents on the next submittal. 21-008.dwg Responded by: Doug Hall - 11/3/23 1:21 PM ok Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 30 1 Planning & Zoning Alexia Lopez 10/17/23 5:41 PM Changemark Upload Individual Sheets Please upload revised sheets as individual sheets. 21-008.dwg Responded by: Doug Hall - 11/3/23 1:21 PM ok Resolved 31 1 Planning & Zoning Alexia Lopez 10/17/23 5:41 PM Changemark Add Overlay to the Zoning Please add the Old Town Overlay Zone to the Current Zoning. 21-008.dwg Responded by: Doug Hall - 11/3/23 1:20 PM added as requested Resolved 32 1 Planning & Zoning Alexia Lopez 10/17/23 5:41 PM Changemark Public Alley? The Secondary Plat says there is a public alley? Is there a public alley on this plat? 21-008.dwg Responded by: Doug Hall - 11/3/23 11:38 AM Yes the 10' area previously noted as common will now be dedicated as a public Alley Resolved 33 1 Planning & Zoning Alexia Lopez 10/17/23 5:41 PM Changemark Clerk Name Please change this name to read: Sue Wolfgang, Clerk of the City 21-008.dwg Responded by: Doug Hall - 11/3/23 11:41 AM changed as requested Resolved 34 1 Planning & Zoning Alexia Lopez 10/17/23 5:41 PM Changemark Alleys shall be dedicated? Are there alleys on this plat? Or is this supposed to say streets? 21-008.dwg Responded by: Doug Hall - 11/3/23 11:42 AM Its supposed to say "streets" this has been revised. Resolved 35 2 Planning & Zoning Alexia Lopez 2/14/24 12:01 PM Changemark Alley Label Please clearly show where this 10 ft. alley is. Either provide a leader line to the alley or move the label over the alley area. SP1.pdf Responded by: Doug Hall - 5/10/24 12:27 PM arrows & labels have been added ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:26 AM revised as requested Resolved 36 2 Planning & Zoning Alexia Lopez 2/14/24 12:01 PM Changemark Remove Old names for streets on the Secondary Plat Please remove the old names for the streets on the Secondary Plat. All that needs to be recorded is the current name of the street. SP1.pdf Responded by: Doug Hall - 5/10/24 12:27 PM old names have been removed ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:26 AM revised as requested Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 37 2 Planning & Zoning Alexia Lopez 2/14/24 12:12 PM Changemark Max Bldg. height The Max height in the Overlay is 30 ft. Please change this or consider removing it from the plat as it can be found in the UDO and there are other stipulations, like the height of the nearest character buildings. SP1.pdf Responded by: Doug Hall - 5/28/24 7:47 PM removed as requested ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 5/15/24 10:04 AM This is still not correct. The maximum height per the Old Town Overlay is 30 ft. Please just remove the Max Bldg Ht from the Secondary Plat so there is no confusion. The maximum height doesn't need to be on the recorded plat. ---------------------------------------------------------- Responded by: Doug Hall - 5/10/24 12:28 PM revised as requested ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:27 AM revised as requested Resolved 38 2 Planning & Zoning Alexia Lopez 2/14/24 12:20 PM Changemark Ingress Egress Easement Instrument Do you have a separate Ingress Egress Easement instrument that you will be recording to spell out what the easement is for and what is allowed? If not, please refer to UDO 7.10.B.3 and add the pertinent wording to the Secondary Plat. SP1.pdf Responded by: Doug Hall - 5/10/24 12:28 PM same answer as before ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:43 AM verbage added Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 39 2 Planning & Zoning Alexia Lopez 2/14/24 12:29 PM Changemark Spelling error I believe this is supposed to be "and"? Please correct. SP2.pdf Responded by: Doug Hall - 5/28/24 7:47 PM text revised as requested ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 5/15/24 10:05 AM This is still incorrect. You changed it to as. It should be and. ---------------------------------------------------------- Responded by: Doug Hall - 5/10/24 12:28 PM same ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:45 AM yes, corrected. Resolved 40 2 Planning & Zoning Alexia Lopez 2/14/24 12:29 PM Changemark spelling error I believe this is supposed to be "as"? Please correct. SP2.pdf Responded by: Doug Hall - 5/28/24 7:47 PM text revised as requested ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 5/15/24 10:06 AM This was not changed. Please change at to as. ---------------------------------------------------------- Responded by: Doug Hall - 5/10/24 12:28 PM same answer as before ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:46 AM yes, corrected Resolved 41 2 Planning & Zoning Alexia Lopez 2/14/24 12:29 PM Changemark Dedication Certificate In the second paragraph it says 520 North Range Line Addition, but the Subdivision name in the Title block just says 520 North Range Line. Please remove the word "Addition" here so the names match for the subdivision. SP2.pdf Responded by: Doug Hall - 5/10/24 12:28 PM same answer as before ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:46 AM revised Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 42 2 Planning & Zoning Alexia Lopez 2/14/24 12:29 PM Changemark Vicinity Map Please update the Vicinity Map with the correct names of the streets. Currently it shows the old names. SP2.pdf Responded by: Doug Hall - 5/10/24 12:29 PM revised ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:46 AM revised Resolved 43 2 Planning & Zoning Alexia Lopez 2/14/24 3:21 PM Changemark External Boundaries Monumentation Please refer to UDO Article 7.18 for the monument and marker standards. Per that section, please change the external corners of the subdivision to a concrete monument, not less than twenty-four (24) inches in depth, not less than four (4) inches square or five (5) inches in diameter, and marked on top with a brass plug, ferrous or magnetic rod, or other durable material securely embedded at major corners. SP1.pdf Responded by: Doug Hall - 5/10/24 12:29 PM revised ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:49 AM revised Resolved 44 2 Planning & Zoning Alexia Lopez 2/14/24 3:37 PM Changemark Alley Pavement Will you be paving this alley and improving it per the standards in UDO Article 7.27? SP1.pdf Responded by: Doug Hall - 5/10/24 12:29 PM same answer as before ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 12:15 PM no, this will not be paved Resolved 45 2 Planning & Zoning Alexia Lopez 2/14/24 3:59 PM Changemark Zoning Chart Title Please add a title above this zoning information. You can simply title it Zoning Information or Zoning District. SP1.pdf Responded by: Doug Hall - 5/10/24 12:30 PM rev ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:50 AM revised Resolved 46 2 Planning & Zoning Alexia Lopez 2/14/24 4:06 PM Changemark Update Date I think this date needs to be updated as Sept. 13, 2024 hasn't happened yet. :) SP2.pdf Responded by: Doug Hall - 5/10/24 12:30 PM revised ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:52 AM LOL revised Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 47 2 Planning & Zoning Alexia Lopez 2/14/24 4:11 PM Changemark BMP Easement The Primary Plat shows a BMP Easement in this area. Will you still have this easement? If so, please add it to the Secondary Plat as well so that it can be recorded. SP1.pdf Responded by: Doug Hall - 5/10/24 12:30 PM easements on this submission are in their final configutation on both PP & SP ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 12:03 PM added back Resolved 48 2 Engineering Alex Jordan 2/16/24 10:00 AM Comment We will hold on approval of this until the development plans are approved under PZ-2021-00195 DP ADLS. Responded by: Doug Hall - 5/10/24 12:23 PM noted ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:23 AM noted, plans and documents have been submitted for review Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 49 2 CrossRoad Engineers Willie Hall 2/23/24 9:03 AM Changemark 701.07 An adequate easement width, as detailed in Table 701-1, beyond the actual footprint of the stormwater quality management facility (per PC-101) as well as a 20-foot-wide BMP access easement from a public right-of-way to each BMP shall be provided. Please revise to reflect the layout proposed. PP2.pdf Responded by: Doug Hall - 5/28/24 7:44 PM The newly uploaded plat shows a variety of easement that in there totality provide adequate easement area over the BMP. The North-South total width is 20' with a bump out for the landscape island. Along the eastern edge is the planned parking lot and curb line. It makes no sense to contiinue BMP easements into paved areas. This is also where our proposed access easement for the BMP AND cross access for the lots begins. We overlap the access and BMP here measureing 75' in width off the West end of Lots 1 & 2. With the recent engineering apporval and staffs awareness of the design, I believe that everyone can agree that additional easement area beyond that is presently provided for would be "overkill". So, if any additional variance must be sought then it is now formally requested here. primary plat & secondary plat easements are now congruant with each other. ---------------------------------------------------------- Responded by: Doug Hall - 5/10/24 12:22 PM easements have been adjusted ---------------------------------------------------------- Responded by: Doug Hall - 4/24/24 11:23 AM proposed easements are outlined in the O & M Manual. UnResolved 50 3 CrossRoad Engineers Willie Hall 5/13/24 10:59 AM Comment As with PZ-2021-00195, since not all drainage comments have been adequately addressed to meet the intent of the Stormwater Ordinance, our office will not grant approval for this project. At the direction of the Engineering department, we will designate this project as "No Comments" to expedite its progress without further delay stemming from drainage review. Info Only 51 3 Planning & Zoning Alexia Lopez 5/15/24 10:57 AM Changemark Remove MAX BLDG HT Please Remove the Max Bldg Ht from the plat. SP1.pdf Responded by: Doug Hall - 5/28/24 7:48 PM revised as requested Resolved 52 3 Planning & Zoning Alexia Lopez 5/15/24 11:04 AM Changemark Change as to and Change as to and SP2.pdf Responded by: Doug Hall - 5/28/24 7:48 PM revised as requested Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00216 PP and SP Matriarch Minor Subdivision Workflow Started: 9/20/2023 12:22:08 PM Report Generated: 06/03/2024 10:47 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 53 3 Planning & Zoning Alexia Lopez 5/15/24 11:04 AM Changemark Change at to as Change at to as SP2.pdf Responded by: Doug Hall - 5/28/24 7:48 PM revised as requested Resolved 54 4 Transportation Systems David Littlejohn 5/29/24 11:15 AM Comment Approved with conditions: Please work with the Engineering Dept. on the appropriate commitment to the City's Non-Reverting Thoroughfare Fund in lieu of constructing the path. Info Only