Loading...
HomeMy WebLinkAboutC300 GRADING PLANUPMERCHANTS BANKOFFICE BUILDING GARAGEFFE = 838.18BUCKINGHAMMULTI-FAMILY BUILDINGFFE = 838.35MERCHANTS BANKOFFICE BUILDINGGROSS BUILDING = 110,889 SFFFE = 838.350.99 ACRESWEST ELM STREET3RD AVENUE SWINDUSTRIAL DRIVESGSMODMFPG = 838.97MLAG = 838.97MFPG = 838.44MLAG = 838.44GRADING LEGEND:FLOOD NOTE:DRAINAGE SUMMARY8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTAL NORTHDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:GRADING PLAN 1"=20' SGJ04C300 ADDITIONAL CITY OF CARMEL NOTES:GENERAL GRADING NOTES:”08/31/20239/21/2023