Loading...
HomeMy WebLinkAboutC600 MAINTENENCE OF TRAFFIC PLANFLOOD NOTE:UPMERCHANTS BANKOFFICE BUILDING GARAGEFFE = 838.18BUCKINGHAMMULTI-FAMILY BUILDINGFFE = 838.35ELM STREETINDUSTRIAL DRIVEMERCHANTS BANKOFFICE BUILDINGGROSS BUILDING = 110,889 SFFFE = 838.350.99 ACRESI N D U S T R I A L D R I V E3 rd A V E N U E S. W.SIDEWALK CLOSED AHEAD WARNING SIGNTO BE PLACED 1 BLOCK FROM CLOSURE.AHEADCROSS HERE2 nd A V E N U E S. W.SIDEWALK CLOSEDUSE OTHER SIDER9-10 [12" X 24"]NOTETHESE SIGNS ARE TYPICALLY MOUNTED ON A DETECTABLE BARRICADE TO ENCOURAGECOMPLIANCE AND TO COMMUNICATE TO PEDESTRIANS THAT THE SIDEWALK IS CLOSED.HOWEVER, PRINTED SIGNS ARE NOT USEFUL TO MANY PEDESTRIANS WITH VISUALDISABILITIES, THEREFORE A BARRIER OR BARRICADE DETECTABLE BY A PERSON WITH AVISUAL DISABILITY IS SUFFICIENT TO INDICATE THAT A SIDEWALK IS CLOSED. IF THEBARRIER IS CONTINUOUS WITH DETECTABLE CHANNELIZING DEVICES FOR AN ALTERNATEROUTE, ACCESSIBLE SIGNING MAY NOT BE NECESSARY. AN AUDIBLE INFORMATION DEVICEIS NEEDED WHEN THE DETECTABLE BARRICADE OR BARRIER FOR AN ALTERNATECHANNELIZED ROUTE IS NOT CONTINUOUS.NOTES:WARNING LIGHTS:XW20-2 [48" X 48"]SIDEWALK CLOSEDAHEADCROSS HERER9-11a [18" X 24"]NON-METALLICREFLECTORIZED DRUMWITH LIGHTNOTES:1.ALL SIGNS AND BARRICADES TO BE PLACED IN ACCORDANCE WITH THE LATEST EDITIONOF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.2.NO CONSTRUCTION SHALL COMMENCE PRIOR TO APPROVAL BY INDIANAPOLISDEPARTMENT OF PUBLIC WORKS.3.CONTRACTOR SHALL MAINTAIN ADA ACCESSIBLE PEDESTRIAN ROUTE AT ALL TIMES.4.CONTRACTOR SHALL PROVIDE ALL NECESSARY SIGNAGE FOR PEDESTRIAN TRAFFIC.ADDITIONAL SIGNAGE, BARRICADES AND TRAFFIC CONTROL DEVICES, OTHER THANSHOWN, COULD BE REQUIRED.5.PLAN SHOWN IS FOR GENERAL PURPOSES AND IS NOT A COMPLETE MAINTENANCE OFTRAFFIC PLAN.8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTAL NORTHDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:MAINTENENCE OF TRAFFIC PLAN 1"=50' SGJ09C600 TRAFFIC LEGEND:STANDARD SIGNCONSTRUCTION DRUMS, CHANNELIZING DEVICESBARRICADE, CHANNELIZING DEVICES08/31/20239/21/2023