HomeMy WebLinkAboutC601 STORM PLANS - ROSIES GARDENSN. COLLEGE AVE(PUBLIC ROW)VILLAGE PLACE S.
(PUBLIC ROW)
VACATED 25' ROW PER
BOOK 87 PAGE 100 AT HCSO
OHU OHU OHU
PARK AVE(PUBLIC ROW)LOT 28
LOT 29
LOT 30
LOT 31
LOT 32
LOT 33
LOT 34
LOT 35
LOT 36
LOT 37
LOT 93
LOT 94
LOT 95
LOT 96
LOT 97
LOT 102
LOT 101
LOT 100
LOT 99
LOT 98
LOT 157
LOT 158
LOT 159
LOT 160
LOT 161
OHU OHU
GGGGGWWWWWWWWWWWWWWWOHU OHU OHU OHU OHU OHU OHUOHUOHUOHU OHUOHUOHUOHUOHUOHUOHUOHUE E E E
DDDDDDDDD
D
D
DD D D D D DDDDDDDDDDDWWWWW W W WWE
EEE10
14
10
4
1066
66 7 GGGGGGGGGGGGGWWWEEE Storm 204-102
830
835
840
845
850
855
Storm 101 - Existing Storm
830
835
840
845
850
855
Storm 230-200
835
840
845
850
855
835
840
845
850
855
Storm 250-220
835
840
845
850
855
835
840
845
850
855
STORM SEWER NOTES
1.THE CONTRACTOR SHALL ADHERE TO ALL TERMS AND CONDITIONS AS
OUTLINED IN THE EPA OR APPLICABLE STATE GENERAL N.P.D.E.S. PERMIT FOR
STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES AND
STORMWATER POLLUTION PREVENTION PLAN.
2.REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD
SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION
METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE
INTENT OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER
SECTIONS OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE
APPLICABLE.
3.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND
LOCATION SERVICE AT LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL
CONTACT THE OWNER AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE IN
CONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES
WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.
4.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN
THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE
VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS
EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE
SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED.
5.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS,
CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE
LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND
MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE
UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR.
6.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY
AND ALL FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES.
7.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH
O.S.H.A. STANDARDS FOR WORKER SAFETY.
8.ANY PART OF STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF
PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL.
9.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND
ELEVATION OF EXISTING UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS
RELATED TO THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR
DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS.
10.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE BETWEEN STORM /
SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE. SANITARY
SEWER LINE IN PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE
PVC.
11.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL
SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN
SANITARY SEWERS, WATER MAINS AND STORM SEWERS IS 18" OR LESS.
12.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING
CONSTRUCTION, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR
AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO
EXISTING CONDITIONS OR BETTER.
13.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER,
PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER
MANAGEMENT TO CONTROL MOISTURE OF SOILS.
14.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED
AREAS.
15.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT
AND SHALL HAVE TRAFFIC BEARING RING AND COVERS.
16.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH
PLUMBING DRAWINGS.
17.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO STORM SEWER
INSTALLATION.
18.ALL EXISTING MANHOLE AND CATCH BASIN GRATES SHALL BE ADJUSTED TO
NEW FINISH GRADE ELEVATIONS.
19.EXISTING PIPES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO
REMOVE ALL SILT AND DEBRIS.
20.ALL STORM PIPE CONNECTIONS AT STRUCTURES SHALL BE GROUTED TO
ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT.
21.ALL STORM SEWER STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH
PAVEMENT AND SHALL HAVE TRAFFIC BEARING RING AND COVERS.
22.ALL STORM SEWER STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED
MORTAR CHANNEL FROM INVERT IN TO INVERT OUT.
23.NEW PIPES AND STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE
CLEANED OUT TO REMOVE ALL SILT AND DEBRIS PRIOR TO FINAL TURNOVER TO
THE OWNER.
24.ALL HDPE PIPE SHALL BE DUAL WALLED, HANCOR HQ, ADS N-12 PIPE OR
APPROVED EQUAL.
25.ALL FITTINGS AND ACCESSORIES INCLUDING BUT NOT LIMITED TO END CAPS,
CLEANOUTS, REDUCERS, ETC., SHALL BE OF HDPE MATERIAL COMPARABLE
WITH STORAGE PIPES.
26.PROVIDE BACKFILL WITH A MINIMUM OF 4" BEDDING MATERIAL OF #8
AGGREGATE COMPACTED IN 8" LIFTS TO 95% MAXIMUM DRY DENSITY.
27.VERIFY EXISTING STORM INVERT ELEVATIONS PRIOR TO STARTING NEW STORM
SEWER CONNECTION.
ROW RIGHT OF WAY
ESMT EASEMENT
D.&U.E.DRAINAGE AND UTILITY EASEMENT
FFE FINISH FLOOR ELEVATION
CMP CORRUGATED METAL PIPE
RCP REINFORCED CONCRETE PIPE
PVC POLYVINYL CHLORIDE PIPE
VCP VITRIFIED CLAY PIPE
HDPE HIGH DENSITY POLYETHYLENE PIPE
DIP DUCTILE IRON PIPE
SSD SUB SURFACE DRAIN PIPE
STM STORM
SAN SANITARY
STR STRUCTURE
CO CLEANOUT
PAVEMENT
STORM SEWER PLAN
AND PROFILE LEGEND
UTILITIES
ABBREVIATIONS
LEGEND
EXISTING GRADE
FINISHED GRADE
GRANULAR BACKFILL
W
S
N
E C601 STORM PnP - ROSIES GARDENSC601STORM PLAN AND PROFILEW22.0156SSRW22.015604/06/2023EACSSRROSIE'S GARDENS10402 N. College Avenue, Carmel, IN 4628010 9abcd 8 7 6efgh109876
5 4 3 2 Part of the NE/4 of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, Indiana1 PREPARED FOR:PROJECT NO.
SHEET NO.abcd5 4 3 2
e1
fhAPPROVAL PENDINGNOT FOR CONSTRUCTIONREVISIONS PER SECOND ROUND OF COMMENTS 08.21.2023SMB1gALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitecturePROJECT NO.:REVISIONS AND ISSUESDATEBYDWG NAME:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:Know what's below.
before you dig.Call
R
STEVEN SCOTT RUCKER P.E. 11300279
HEAVY DUTY ASPHALT
CONCRETE PAVEMENT
STANDARD DUTY ASPHALT
RIGHT OF WAY LINE
BOUNDARY LINE
LINE TYPES
EXISTING SANITARY SEWER MAIN
EXISTING STORM SEWER MAIN
UNDERGROUND GAS
UNDERGROUND WATER
UNDERGROUND ELECTRIC
UNDERGROUND COMMUNICATIONS
OVERHEAD UTILITY
G G G
W W
E E E
C C C
OHU OHU
SANITARY SEWER LATERALSANSAN
GUY ANCHOR
ORNAMENTAL LIGHT
STREET LIGHT
ELECTRIC OUTLET
UTILITY POLE
UTILITY POLE W/ TRANSFORMER
COMMUNICATIONS JUNCTION BOX
COMMUNICATIONS PEDESTAL
FIRE HYDRANT
SPRINKLER CONTROL VALVE
SPIGOT
WATER METER
GAS METER
ELECTRIC METER
EXISTING BOLLARD
POST
ACCESSIBLE SPACE
COMMUNICATIONS RISER
EXISTING BEEHIVE INLET
EXISTING ROUND INLET
EXISTING SQUARE INLET
EXISTING SANITARY SEWER MANHOLE
PARKING LOT LIGHT (1 HEAD)
PARKING LOT LIGHT (2 HEAD)
PROPOSED BOLLARD
PROPOSED END SECTION
PROPOSED STORM INLET
PROPOSED STORM INLET
BOARD FENCE
CHAINLINK FENCE
PROPOSED STORM SEWER MAIN
FLOW LINE
BENCHMARK INFORMATION
SITE TBM #1
MAG NAIL SET IN THE NORTH SIDE OF A UTILITY POLE 54.8' FROM
THE SOUTHEAST CORNER OF THE BUILDING AT 10450 N.
COLLEGE AVE AND APPROXIMATELY 214' SOUTH OF THE
INTERSECTION OF N. COLLEGE AVE AND 105TH STREET.
ELEV. 845.04 (NAVD 88)
SITE TBM #2
MAG NAIL SET IN THE EAST SIDE OF A UTILITY POLE
APPROXIMATELY 108.9' SOUTH OF THE INTERSECTION OF N.
COLLEGE AVE AND E. 104TH STREET, AND 121.8' NORTH OF A
FIRE HYDRANT ON THE WEST SIDE OF N. COLLEGE AVE.
ELEV.846.92 (NAVD 88)
NOTE
ALL CASTINGS TO BE STAMPED
HYDRAULIC GRADE LINE - 10-YR