Loading...
HomeMy WebLinkAboutCorrespondence 09/19/2006 20:30 3177769628 HAMILTON CO SURVEYOR PAGE 01/02 :Kenton C. 'Ward, Srm1t:yor 'Pliont (~P7) 776.L'i4'!5 'Fax (J.1.7) 776'-:)I;':S ..'illite'188 One :Hamilrc/n COllllty .Sqrwrt' ;""Y oble$l'iJ/e, .1 nclimza 4. ';{~6('- Z2J (1 September 19, 2006 Evergreen Planners, LLC ATrN: Art Kaser 234 South Franklin Road Indianapolis, IN 46219 VIA FACSIMILE: 353-0684 l \ \ \ >" . ~ RECEIVED SEP Z 0 zaas DOCS / RE: Courtyards at Carmel Creek Primary Plat 116c11 Street aDd Carmel Creek, Hamilton County, IN. ,- ....... '-.. --.~ -_.~' Dear Mr. Kaser: We have reviewed the concept plan submitted to the Hamilton County Surveyor's Office on September 6, 2006, for this project and have the following comments: 1. The proposed project faIls in the incorporated area and MS4 jurisdiction of the City of Cannel 2. The proposed project DOES NOT tall in a Carmel Wellhead Protection Zone. 3. The proposed project is located in the Carmel Creek Watershed and has Cannel Creek running along the proposed project. Carmel Creek in the W.R. Fertig Regulated Drain upstream of this proposed project. The W.R. Fertig Regulated Drain wi11likely be extended downstream, as petitioned for by the City of Carmel with the 116lh Street road project. 4. The allowable release rate for the W.R. Fertig/J.W. Hawkins Regulated Drain is based on the capacity of the culvert under Ralston Ave. This site will discharge upstream of the restriction point and should be held to the 0.24 cfs per acre. The 0.1 cfs per acre for stonn events from 1 to 10 year size will also need to apply to this site. . 5. The Hamilton County Surveyor's Office recommends STRONGLY against any filling or loss of floodplain volume on this site, which includes placing detention within the floodplain. The floodplain of this site plays a critical role in lessening the chance of flooding to the people downstream of this site. 09/19/2006 20:30 3177769628 HAMILTON CO SURVEYOR PAGE 02/02 6. The upstream watershed area of Cannel Creek at this point is approximately 3 square miles. Any work within the mapped floodplain area will require approval of the Indiana Department of Natural Resources - Division of Water. . 7. The Hamilton County Surveyor's Office recommends STRONGLY against reforestation along Cannel Creek and within the floodplain because it reduces floodplain volume, impedes the flood of water, and will create obstructions in the channel as the tree mature. 8. Hamilton County Ordinance 4-26-99-C(3) will require improvements to the natural watercourse across the site and possibly downstream. These improvements will includedt but not limited to, debris and flowline obstruction removal, tree clearing from top of bank to top of bank, and stream bank erosion repair and stabilization. 9. Hamilton County Ordinance 4-26-99-C(7)e requires all minimum finished floor elevations to be a minimum of 2 feet about the 100 year water surface elevatioD. of this natural watercourse. These minimum finished floor elevations must be denoted on the construction plans. 10. Although the Hamilton County Surveyor's Office has reviewed this conceptual site plan and issued a comment letter, this office will not be limited by the primary plat in regards to the pond sizes or location, drainage easement widths, storm sewer locations, lot layout, landscape layout, or any other drainage related issues. Insufficient information is presented to conduct a complete drainage review and changes may be required during the construction planning stage. 11. Please submit complete construction plans, the secondary plat, and drainage calculations to this office when they become available. 12. Please note that further comments may be necessary at a later date. Should you have any questions, I can be reached at 317-776-8495. JJ;;1~ Greg Hoyes, AC Plan Reviewer cc: Matt Griffin - Cannel DOCD Amanda Foley - Carmel Engineering Dick Hill - Carmel Engineering Mike McBride - HCRD Greg Ilko - Crossroad Engineers David Knipe - INDNR - DOW MHE. Development Company - 264-9831 City of Carmel Via email: Charlie@nf-Iaw.com Original by mail September 11, 2006 Charlie Frankenberger Nelson & Frankenberger, P.C. 3105 East 98th Street Suite 170 Indianapolis, Indiana 46280 co~~/. RE: Courtyards at Carmel Creek PUD (06080034 PUD) Dear Mr. Frankenberger: This letter is in response to your PUD application for the Courtyards at Carmel Creek PUD project. Comments and concerns are as follows: 1. Please indicate the required multiuse path on 116th Street, as well as connections from the path to within the project. 2. Please indicate whether any amenities, such as benches or gazebos, will be provided in the open space at the southern end of the site. Please wait to submit revised materials until after the Technical Advisory Committee (TAC) has met on this application. The resubmitted materials should include edits addressing the above comments along with any requirements that arise from the T AC meeting. Additional comments may be made after the requested revisions have been submitted. Sincerely, rVt1--- ~~JlfLr Christine Barton-Holmes Planning Administrator cc. Gary Merritt 06080034 PUD Courtyards at Carmel Creek Page 1 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 EL .,//----_. -~ //. ~ \' I / RECEIVED . I \- SEP-82006 \ . DOCS \ " I.....""'--___...~ .' September 7, 2006 JAMES BRAINARD, MAYOR Mr. Arthur L. Kaser, L.S. Evergreen Planners, LLC 234 South Franklin Road Indianapolis, IN 46219 RE: Courtyards @ Carmel Creek Coneeptual-ProJed Review #1 Dear Mr. Kritz: We have reviewed the plans submitted for review at the September 20, 2006 Technical Advisory Committee meeting. We offer the following comments: This information is provided in advance of detailed construction plan review. These general information comments will be repeated and updated as construction plans are submitted for review. GENERAL INFORMATION I. The project site is located within current City of Carmel Corporate Limits. 2. Jurisdictions: . Streets and Right of Way - City of Carmel (I 16th Street) . Water - City of Carmel Utilities . Sanitary Sewers - Clay Township Regional Waste District . Storm SewerslDrainage - City of Carmel. . Legal Drains - Hamilton County Surveyor's Office. 3. Board of Public Works and Safety Requirements: . Water Availability approval from the Board is based upon the total number oftownhome units and number of bedrooms per unit. Reference item #11 below for a more detailed explanation. If a community swimming pool or bathhouse is planned, additional Water Availability approval from the Board will be required and additional Water Connection Fees will be assessed. If entryway or other community irrigation systems are planned, these will also require additional Water Availability approval from the Board and additional Water Connection Fees will be assessed based upon the size and usage of the system. . Commercial Curb Cut Approval- This approval will be required for the I 16th Street entrance. Provide a letter to this office requesting BPWS Commercial Curb Cut approval. Provide an 8 ~ x II exhibit or exhibits detailing the requested curb cut(s) with all appropriate dimensional data including width, radii, acel/decel/passing blister dimensions, existing and opposing streets or drives, etc. . Temporary Construction Entrance approval if the location is at a site other than a permanent curb cut on II~ Street. Submission requirements are the same as for commercial curb cut. . Open pavement cuts of dedicated streets require BPWS approval. . Any permanent improvement to be installed within dedicated right of way or dedicated easements. This approval would require a Consent to Encroach Agreement between the Owner and the City of Carmel. . Secondary Plat approval if applicable. . Dedication of Right of Way if not platted. DEPARTMENT OF ENGINEERING ONE CMC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAIL engineering@carmel.in.gov Any submission to the Botml requires prior approval by the CllnneI CItIy PItl1l Commission ad/or the Bofl1'fl of Zoning Appetlls (If applicable) ad completion of review by the Technical Advisory Committee. AU written requests to be plflced on the BOliN'S IIgendllllUlSt Include the approprlflte Docket Number ad the dtIte (or dates) of approvtll by the PItl1I Commission ad/or the Bofl1'fl of Zoning Appetlls (If tlJIplicllble). 4. T.A.C. ReviewlDrawings submitted for approval: We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all Engineering Department and Utility Department issues have been resolved. The design engineer must certify all drawings submitted for final approval. This office will require a minimum of four-sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and will be signed by the City Engineer and Director of Carmel Utilities. The Owner will receive one-set which is to be maintained on the construction site at all times. Carmel Utilities will receive one-set, our Public Works Inspector will receive one-set and one-set will be maintained in the Engineering Department. If additional approved sets are desired, we will approve a maximum oftwo-additional sets for a total of six- sets. However, the additional sets must be submitted with the required four-sets. S. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way or dedicated easements will require a Consent to Encroach Agreement with the City of Carmel. This agreement, with the exception of irrigation systems, requires BPWS approval. The City Engineer may approve irrigation system agreements. 6. Please assure that Carmel Utilities Water Distribution is provided copies of all drawings submitted for review of water issues. They will provide a separate review regarding these issues. Please send drawings to: Paul Pace City of Carmel Water Distribution 130 1st Avenue SW Carmel, IN 46032 7. Carmel Utilities does subscribe to "Holey Moley" who should be contacted directly for all water main locations. 8. We will provide copies of the following with the submission of construction plans: . Board of Public Works and Safety meeting dates and agenda deadlines. . Water Availability & Connection Fees . Subdivision Project Approval Procedures . Commercial Project Approval Procedures . Performance Release Procedure . Subdivision Building Permits . Commercial Permitting Procedures . Permit Data, Contacts, etc. . Street Signage Requirements (Available on Request) BONDING REOUIREMENTS 9. Upon initial review, it appears the following bonding requirements may apply to this project: Performanee GuaranteeslEngineer's Estimates . Interior Streets (base, binder and surface must be bonded together) . Curb & Gutters . Water Mains . Storm SewerslDrainage . Monuments and Markers (if platted) . Street Signs . Sidewalks (Interior-builders lot right of way sidewalks and Exterior-common area/perimeter right of way sidewalks/asphalt paths may be bonded separately). . Right of Way Improvements may be bonded separately. This could include acceVdecellanes, passing blister, pavement widening, thermoplastic striping, stone shoulders, curbs, etc. . Erosion control. Please contact Amanda Foley, Storm Water Administrator for the Engineering Department. The above bonding requirements are based on the interior streets being public dedicated streets. If the streets are to be private, bonding will not be a requirement for Interior Streets, Interior Curbs, Storm Sewers, Street Signs and Interior Sidewalks. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 1000,4 of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineer's Estimates for each improvement including quantities, unit costs, pipe sizes and materials, etc. Upon completion and release of individual Performance Guarantees, a tbree-year Maintenance Guarantee will be required. The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 100,4 of the Performance amount for all other improvements. Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. Right of Way Permit and Bonding Any work in the dedicated right of way of 116* Street will require an approved Right of Way Permit and a License & Permit Bond. The bond amount is determined by the number of instances of work in the right of way at $2,000.00 per instance. However, if the work is included in the scope of work of a required and posted Performance Guarantee, the Performance Guarantee may be used to satisfy the bond requirements of the Right of Way Permit. Please contact our Right of Way Manager, Fred Glaser, to arrange right of way permitting and bonding. Note: Any open pavement eut within dedieated streets wiD require separate Board of Publie Works and Safety approvaL 10. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. We will share Crossroad's comments as they are received. When construction plans are submitted for review for this development, please provide a set of drawings and drainage calculations directly to Crossroad. AVAILABILITY AND CONNECTION FEES 11. Availability (aereage) Fees must be paid after all other Engineering Department requirements have been satisfied and prior to approval and start of construction activities. Availability Fees are based upon total platted acreage or legal description acreage for the development at the current rate of$I,010.oo per acre for Water Availability. The legal description indicates a total of 7.694 acres (including the portion of the 116* Street right of way). Thus: 7.694 acres @ $1,OlO.oo/acre = $7,771.00 Water Availability Fee Conneetion Fees-We will ask that you provide this office with a listing of the townhome buildings, units per building and number of bedrooms per unit. The current Water Connection Fee is $1,310.00 per EDU. Connection Fees are paid when the infrastructure has been completed, satisfactory test results obtained and the development has been released for building permits. Connection Fees are paid on a building-building-lot basis. The EDU calculation is based on the following: I-Bedroom Unit @ 0.54 EDUs per Unit 2-Bedroom Unit @ 0.81 EDUs per Unit 3-Bedroom Unit @ 1.00 EDU per Unit The Availability and Connections Fees are current as of this date but are subject to future revisions. q an irrigation system, swimming pool or clubhouae Is p/tmnedfor this development, additional Water Connection Fees wUl be assessed baed upon the recommendations of the Director of Carmel UtUltlea. PROJECT COMMENTS 12. A seven-page Plan Certification Form is enclosed with this letter. This form was created with the desire and intent to streamline the plan review process. We request that you please complete this form and return it to the Department of Engineering as soon as possible. Comments will be generated after the Certification Form is returned. Please treat each item on the form as a requirement of the Department of Engineering. Providing a ''no'' or ''N/A'' response to any of the items does not relieve the Developer of the responsibility of meeting the requirements of the ;- Department of Engineering. The Department of Engineering will make the final detennination as to the acceptability of any "no" or "Nt A" responses. 13. Does the conceptual plan submitted reflect the 116* Street Road Improvements now being constructed? If not, please include these improvements on future submissions. 14. Will the interior streets be public streets? 15. Will this project be platted? These comments represent the Department of Engineering's initial review of the conceptual plan for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. It is critical that this office be made aware of all modifications made on the plans being re-submitted, particularly if any such changes are considered ''new'' or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notity us of any changes and specifically state any changes. including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. All performance guarantees must be posted prior to submission of secondary plats for Board of Public Works and Safety approval. The Department reserves the right to provide additional comments based upon subsequent reviews and on the grading and drainage system upon receipt of drainage calculations and more detailed construction drawings that provide grading elevations, pipe sizing and invert elevations. These comments may affect the drainage system layout presented on the primary plat. If you have questions, please call me at 571-2441. Sincerely, ~j.~ Nicholas J. Redden, P.E. Plan Review Coordinator Department of Engineering Enclosures Cc: Matt Griffin, Department of Community Services John Duffy, Director Carmel Utilities Paul Pace, Carmel Utilities Distribution Greg Ilko, Crossroad Engineers Greg Hoyes, Hamilton County Surveyor's Office ME Development, LLC Engineering File Copy Engineering Department Review S:\DHILL\PROJREV06\COURTY ARDS@CARMELCREEKCONCEPT l,'. ',' ",:' ,s~pieritber" 1;'2006 ,-, . " . .' _ - ....,'-.. r' ~ '. >,,' .-.... ' ,\ "'\-: -..T "- ,-' -,: ,'J.' -:,;'. ., .\', :, '"j -' 1_, _..- ... .I: - --, ~ :}.... , _ .~'l. ~ :." , " , .f -, ' c :Y,-, . \.'. ,;- . ..;; - . 't-'. ., -.' ',' ,_:' . " <9J TO: Carmel DOCS One Civic Square Carmel, IN. 46032 DATE: 08-15-06 PROJECT NO: 25354 , . I' ." , \ I ,C/', \;..---~--------.;.;.~) /' '\. '. .// . '<'.> '~~" ! ,/ '\./ "(.' .''' \V _~ \. f.., ::",.' <~ s,~ \',' .> " {<:;c-1v "'<:S . . "- ;'V <, v '.- ~ <) , ,"') ~ 0 I ~::~.\~. ~~ <--.<:S I " )/ V / " ' /" , /J) /< ....Q&,.\ ' CSO SCHENKEL SHULTZ Letter of Transmittal RE: Rotary Stairs ATTN: Mike Hollibaugh CONTACT PHONE: 571-2417 WE ARE SENDING YOU: 08-15-06 One Set of Civil Drawings IF ENCLOSURES ARE NOT AS INDICATED, PLEASE NOTIFY US AT ONCE. THESE ARE TRANSMITTED: o For approval [gI For your use [gI As requested [gI For review and comment o Reviewed as submitted o As noted o Revise and Resubmit o Rejected o Resubmit for approval o Submit for distribution o Return corrected prints o Other: REMARKS: Mr. Mike Hollibaugh I am sendig you a set of Civil drawings per Les Olds instruction. cc: 25354 BOB OLSON Courier Service: 0 1-HR FedEx Services: 0 8:30 A.M. Delivery o Fed Ex Ground Delivery Other Delivery Service: 0 [gI 3-HR 010:30 A.M. Delivery o By: Kevin Sellers o Same Day o 3:00 P.M. Delivery LOT Mike Hollibaugh 080306.doc PROGRAMMING' PLANNING' DESIGN 280 East 96th Street, Suite 200 . Indianapolis, Indiana 46240 . Main 317.848.7800 . Fax 317.574.0957 . csoinc.net