Loading...
HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: PZ-2023-00224 ADLS and Variances North End Fields Market Garden Workflow Started: 10/2/2023 4:59:09 PM Report Generated: 02/28/2024 03:05 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 2 1 Sign Permits Aliza Shalit 10/12/23 12:09 PM Comment All Signs require a separate sign permit application and review process. Please apply through the City's online permitting site. Info Only 3 1 Sign Permits Aliza Shalit 10/12/23 12:10 PM Comment Please include any proposed signage in this submittal. Reviewer Response: Aliza Shalit - 2/21/24 1:11 PM Thank you for uploading the possible signage solutions, but we will need to come to a final decision on the structure for the sign. We can keep working on what the final solution will be through the sign permit application and review process. Sign must follow UDO SIgn Standards for ground signs. ---------------------------------------------------------- Responsed by: Charlie Mattox - 2/9/24 4:43 PM I've uploaded the sign proof. The structural portion of the sign is still being considered. ---------------------------------------------------------- Reviewer Response: Aliza Shalit - 1/17/24 2:50 PM No update to signage has been made. ---------------------------------------------------------- Responsed by: Charlie Mattox - 12/29/23 4:49 PM Please let us know if anything further is needed. ---------------------------------------------------------- Reviewer Response: Aliza Shalit - 12/6/23 3:34 PM item in folder is for the cart, not for the ground sign. Any more updates on the ground sign? ---------------------------------------------------------- Responsed by: Rebecca McGuckin - 11/20/23 9:58 AM See Architectural Folder for look-feel. Info Only 4 1 Building & Code Services Mike Sheeks 10/14/23 2:10 PM Comment Is there a flood mitigation plan? Thank you! Responsed by: Rebecca McGuckin - 11/20/23 1:48 PM Please see Drainage File. Resolved REVIEW COMMENTS Plan Review - Review Comments Report Project Name: PZ-2023-00224 ADLS and Variances North End Fields Market Garden Workflow Started: 10/2/2023 4:59:09 PM Report Generated: 02/28/2024 03:05 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 5 1 Engineering Alex Jordan 10/18/23 8:16 AM Comment We have no comments on the ADLS but will need to see a full set of civil construction plans for our review. Please work with Planning and Zoning to determine if these documents will be submitted under a different docket number or if the development plan will be included in this submittal. Responsed by: Charlie Mattox - 12/29/23 4:40 PM Please let us know if anything further is needed. ---------------------------------------------------------- Responsed by: Rebecca McGuckin - 11/20/23 9:52 AM Please see Site Files for civil docs. Info Only 6 1 Vectren Energy Chad Miller 10/20/23 10:48 AM Comment No comments. Info Only 7 1 Planning & Zoning Alexia Lopez 11/15/23 3:55 PM Changemark Farm Stand What will the farm stand look like? What will it be made out of and how tall will it be? C300 Site Dimension, Grading, Utility and Erosion Control Plan.pdf Responsed by: Rebecca McGuckin - 11/20/23 9:53 AM Please see sketch in architectural file (Farm Stand Sketch 2.0) 7' tall; majority of exterior is plywood siding. Roofing material "Ondura". Please see Farm Stand Materials sheet. Resolved 8 1 Planning & Zoning Alexia Lopez 11/15/23 3:55 PM Changemark Setback shown for Farm stand Please show the setback for the farm stand from the property line, instead of the centerline of the road. C300 Site Dimension, Grading, Utility and Erosion Control Plan.pdf Responsed by: Rebecca McGuckin - 11/20/23 9:54 AM See Updated Civil Sheets Resolved 9 1 Planning & Zoning Alexia Lopez 11/15/23 3:55 PM Changemark Property Line Please show the property lines for the parcel. This line appears to go to the middle of the right-of-way. C300 Site Dimension, Grading, Utility and Erosion Control Plan.pdf Responsed by: Rebecca McGuckin - 11/20/23 9:54 AM See Updated Civil Sheets Resolved 10 1 Planning & Zoning Alexia Lopez 11/15/23 4:07 PM Changemark Side yard setback There is a minimum side yard setback of 6 ft for an accessory building. Please move the high tunnel to meet this setback. C300 Site Dimension, Grading, Utility and Erosion Control Plan.pdf Responsed by: Rebecca McGuckin - 11/20/23 9:55 AM Please see Updated Civil Sheets Resolved 11 1 Planning & Zoning Alexia Lopez 11/15/23 4:13 PM Changemark Side setback for farm stand Please move the farm stand to meet the minimum 6 ft. side yard setback for accessory buildings. C300 Site Dimension, Grading, Utility and Erosion Control Plan.pdf Responsed by: Rebecca McGuckin - 11/20/23 9:55 AM Please see Updated Civil Sheets Resolved 12 1 Planning & Zoning Alexia Lopez 11/15/23 4:30 PM Changemark Bees Please make sure you are operating the beekeeping in compliance with all state environmental and state health laws and rules, including the annual registration of bees. C300 Site Dimension, Grading, Utility and Erosion Control Plan.pdf Responsed by: Rebecca McGuckin - 11/20/23 9:56 AM Honey production at Fields Market Garden is done by a hobbyist. Because the honey is not for sale and this is his hobby, he is not held to these standards. FMG allows him to operate on the property for the sake of pollination. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00224 ADLS and Variances North End Fields Market Garden Workflow Started: 10/2/2023 4:59:09 PM Report Generated: 02/28/2024 03:05 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 13 1 Planning & Zoning Alexia Lopez 11/15/23 4:32 PM Changemark Parking Lot in Floodway Please provide an update on any approvals to be allowed to construct a parking lot in the floodway. C300 Site Dimension, Grading, Utility and Erosion Control Plan.pdf Reviewer Response: Alexia Lopez - 2/27/24 4:04 PM Ok. I will approve this with the condition of receiving that DNR approval. ---------------------------------------------------------- Responsed by: Charlie Mattox - 2/9/24 4:38 PM We are still in queue for final review. They have accepted our application and our public notices, but we are still waiting on the permit approval, unfortunately. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 1/18/24 10:29 AM Any progress with DNR? ---------------------------------------------------------- Responsed by: Charlie Mattox - 12/29/23 4:43 PM Coordination with DNR is still ongoing. We will upload all permitting info once we receive approval. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/12/23 12:43 PM Thank you. Please upload the approve once you receive it. ---------------------------------------------------------- Responsed by: Rebecca McGuckin - 11/20/23 1:51 PM Application filed with DNR. Will share approval when received. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00224 ADLS and Variances North End Fields Market Garden Workflow Started: 10/2/2023 4:59:09 PM Report Generated: 02/28/2024 03:05 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 14 1 Planning & Zoning Alexia Lopez 11/15/23 4:42 PM Changemark Please upload additional details Please upload the additional details related to the greenhouse design, like the decorative ridge cresting and cutter details you are proposing. 3D Greenhouse.pdf Responsed by: Charlie Mattox - 2/9/24 4:39 PM I've uploaded the revised greenhouse drawing indicating the materials to be used. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 1/18/24 9:45 AM This comment is still outstanding as I did not see the greenhouse details uploaded. They were included in the packet to the Plan Commission, but please also upload these to ProjectDox as an individual sheet so that I can stamp them approved. I believe it is pages 7 and 8 from the packet. ---------------------------------------------------------- Responsed by: Charlie Mattox - 12/29/23 4:44 PM Let us know if any further action is needed for this comment. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/12/23 12:38 PM Please upload each sheet individually in the Architectural Drawings folder where you have uploaded the other architectural information. Then I can stamp approved the appropriate sheets. ---------------------------------------------------------- Responsed by: Rebecca McGuckin - 11/20/23 9:56 AM Please see Uploaded Packet Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00224 ADLS and Variances North End Fields Market Garden Workflow Started: 10/2/2023 4:59:09 PM Report Generated: 02/28/2024 03:05 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 15 1 Planning & Zoning Alexia Lopez 11/15/23 4:42 PM Changemark Knee wall material Please label the materials on the building. What material will the knee wall of the greenhouse be? 3D Greenhouse.pdf Responsed by: Charlie Mattox - 2/9/24 4:40 PM Material labels added to the Greenhouse detail. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 1/18/24 9:52 AM Yes, further action is needed as I did not see the materials labeled on the 3D Greenhouse file. ---------------------------------------------------------- Responsed by: Charlie Mattox - 12/29/23 4:44 PM Let us know if any further action is needed for this comment. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/12/23 12:40 PM Please add this label on the 3D Greenhouse file. And please provide a label for what the other materials on the greenhouse will be. ---------------------------------------------------------- Responsed by: Rebecca McGuckin - 11/20/23 9:57 AM Split-face CMU Resolved 16 1 Planning & Zoning Alexia Lopez 11/15/23 4:54 PM Changemark Label location of the sign Please label the location of the proposed sign and make sure that it is a minimum of 5 ft. from the right-of-way C300 Site Dimension, Grading, Utility and Erosion Control Plan.pdf Responsed by: Rebecca McGuckin - 11/20/23 9:57 AM See Updated Civil Sheets Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00224 ADLS and Variances North End Fields Market Garden Workflow Started: 10/2/2023 4:59:09 PM Report Generated: 02/28/2024 03:05 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 17 1 Planning & Zoning Alexia Lopez 11/15/23 5:04 PM Changemark Head house side setback Please move the headhouse to meet the minimum 6 ft. side setback for an accessory structure or 5 ft. for a principal structure. C300 Site Dimension, Grading, Utility and Erosion Control Plan.pdf Responsed by: Charlie Mattox - 2/9/24 4:41 PM The building has been shifted to meet the required setback. See Sheet 300. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 1/18/24 9:54 AM Even if the headhouse is the primary structure, there is still a 5 ft. Side setback. If you want 0 ft. then you would have to follow UDO Sec. 5.05.B.2 which states, A side facade may be constructed on the side property line (no setback) if an agreement is in place between the subject property owner and neighboring property owner, acknowledging that the neighboring property owner supports the zero lot line setback, understands its impact on the neighboring property, and grants the subject lot’s owner the right to access to maintain the side facade from the neighboring property in perpetuity. The side facade shall be in full compliance with Section 5.05(C): Facades. Also refer to Sec. 5.05.B.3. Is there an issue with moving the building a few feet? ---------------------------------------------------------- Responsed by: Charlie Mattox - 12/29/23 4:46 PM My understanding from the pre-file meeting was that the headhouse is the primary structure with no setback requirement, which is why it did not meet the maximum front yard setback requirements, etc. Let me know if this was a misunderstanding and that it falls under the accessory building requirements. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/12/23 12:36 PM This comment has not been resolved as the head house is still too close to the property line. ---------------------------------------------------------- Responsed by: Rebecca McGuckin - 11/20/23 9:57 AM Moved; see updated Civil Sheets Resolved 18 2 Building & Code Services Mike Sheeks 11/29/23 4:54 PM Comment More specifically you will need to provide a fill/cut report in their drainage summary and get a BPW waiver from our prohibition of fill in floodplain ordinance. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00224 ADLS and Variances North End Fields Market Garden Workflow Started: 10/2/2023 4:59:09 PM Report Generated: 02/28/2024 03:05 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 19 2 Building & Code Services Mike Sheeks 11/29/23 5:14 PM Comment Please refer to comments from the engineering department. Thank you! Info Only 20 2 Engineering Alex Jordan 12/6/23 10:09 AM Library Comment Please provide the sites zone district on the cover sheet Responsed by: Charlie Mattox - 12/29/23 4:40 PM Development summary added to Sheet C100. Resolved 21 2 Engineering Alex Jordan 12/6/23 10:09 AM Library Comment Please provide the setback distances on the cover sheet Responsed by: Charlie Mattox - 12/29/23 4:40 PM Development summary added to Sheet C100. Resolved 22 2 Engineering Alex Jordan 12/6/23 10:09 AM Library Comment Please provide the sites total disturbance on the cover sheet Responsed by: Charlie Mattox - 12/29/23 4:40 PM Development summary added to Sheet C100. Resolved 23 2 Engineering Alex Jordan 12/6/23 10:09 AM Library Comment Please provide all technical information required by Section 102.02(xi)(m) of the Storm Water Technical Standards on the grading plan Responsed by: Charlie Mattox - 12/29/23 4:41 PM Drainage Summary added to Sheet C300. Resolved 24 2 Engineering Alex Jordan 12/6/23 10:09 AM Library Comment Please verify that there are no direct discharge areas Responsed by: Charlie Mattox - 12/29/23 4:41 PM The entire site will continue to sheet flow northeasterly to Little Cool Creek matching existing drainage conditions. Resolved 25 2 Engineering Alex Jordan 12/6/23 10:09 AM Library Comment Please verify that all elevations are North American Vertical Datum of 1988 (NAVD) Responsed by: Charlie Mattox - 12/29/23 4:41 PM Confirmed. Resolved 26 2 Engineering Alex Jordan 12/6/23 10:09 AM Library Comment Please verify that the horizontal datum of topgraphic map is Indiana State Plane Coordinates, NAD83 Responsed by: Charlie Mattox - 12/29/23 4:41 PM Confirmed. Resolved 27 2 Engineering Alex Jordan 12/6/23 10:09 AM Library Comment Please verify that the locations of existing utilities with top of curb and invert elevations, pipe sizes, and direction are shown Responsed by: Charlie Mattox - 12/29/23 4:42 PM Confirmed. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00224 ADLS and Variances North End Fields Market Garden Workflow Started: 10/2/2023 4:59:09 PM Report Generated: 02/28/2024 03:05 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 28 2 Engineering Alex Jordan 12/6/23 10:09 AM Library Comment Please verify that all existing culverts, pipes, and bridges on existing drives or under the roadway are shown indicating size, type, and invert elevations Responsed by: Charlie Mattox - 12/29/23 4:42 PM Confirmed. Resolved 29 2 Engineering Alex Jordan 12/6/23 10:09 AM Library Comment Please verify that the locations of all existing electrical power vaults, transformers, power lines, gas lines, television cable , and telephone lines are shown Responsed by: Charlie Mattox - 12/29/23 4:42 PM Confirmed. Resolved 30 2 Engineering Alex Jordan 12/6/23 11:14 AM Changemark Please provide a detail for the grass pavers C500 MISCELLANEOUS DETAILS AND SPECIFICATIONS.pdf Responsed by: Charlie Mattox - 12/29/23 4:42 PM Details have been added to Sheet C500. Resolved 31 2 Engineering Alex Jordan 12/6/23 11:24 AM Changemark Do the grass pavers require any subsurface drainage or do they rely only on infiltration? If there will be any drains installed, we will need to see them on this sheet. How will infiltration be achieved on a compacted subgrade? The soils report indicates a D soil group. Please provide how the grass paver system proposed meets the manufacturers design requirements for clay soils and associated infiltration rates. C300 Site Dimension, Grading, Utility and Erosion Control Plan.pdf Responsed by: Charlie Mattox - 12/29/23 4:43 PM An underdrain has been added, inverts and location on Sheet C300. Resolved 32 2 Engineering Alex Jordan 12/6/23 2:07 PM Comment Please provide an operation and maintenance manual for the grass pavers with the next submittal. Responsed by: Charlie Mattox - 2/9/24 4:37 PM Updated O&M manual has been uploaded. ---------------------------------------------------------- Responsed by: Charlie Mattox - 12/29/23 4:43 PM An O&M manual has been provided with the resubmittal. Resolved 33 2 Planning & Zoning Alexia Lopez 12/12/23 2:40 PM Changemark Add Docket Number Please add the Docket Number to the Cover Sheet C100 TITLE SHEET.pdf Responsed by: Charlie Mattox - 12/29/23 4:49 PM The docket number has been added to the title sheet. Resolved 34 3 Engineering Alex Jordan 1/23/24 9:02 AM Comment Please see my comments sent via email on 1/18/24 to Charlie and revise the plans accordingly. Responsed by: Charlie Mattox - 2/9/24 4:38 PM Separate response via email sent. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00224 ADLS and Variances North End Fields Market Garden Workflow Started: 10/2/2023 4:59:09 PM Report Generated: 02/28/2024 03:05 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 35 4 Engineering Alex Jordan 2/14/24 2:25 PM Comment We have one final comment that can be addressed on the final submittals: 1. Please have the BMP easement added to the O&M site map. Before we can issue a stormwater management permit, the following items will need to be submitted: 1. A signed and recorded O&M manual (with the requested revisions) 2. An erosion control engineers estimate for all temporary and permanent erosion control measures 3. A non-expiring erosion control performance bond for 100% of the approved estimate 4. A completed BMP easement agreement with exhibit and legal description 5. A right-of-way permit application and $5,000 license and permit bond (this can be applied for here: https://cw.carmel.in.gov/PublicAccess/login) Info Only 36 4 Planning & Zoning Alexia Lopez 2/27/24 4:58 PM Comment This ADLS approval is conditioned upon final signage design approval through the sign permit process. Sign must follow UDO Sign Standards for ground signs. Info Only