David B. Klain [david@dbklain.com]
Friday, September 29, 2006 1 :57 PM
Lillard, Sarah N
FW: Office Building
Sarah,
Here is the
starting in
information you had requested for the commercial building we are going to be
The Village of westClay:
Docket number #06070006
Address:
2159 Glebe Street
Carmel, IN 46032
Contact person is:
David B. Klain
david@dbklain.com
317-846-4344
Please reply back and let me know that you received this information. Thank you!
Sincerely,
David B. Klain
D,B. Klain Builders, LLC.
715 East 107th Street
Indianapolis, IN 46280
Office: (317) 846-9992
Fax: (317) 846-2070
Digital Pager: (317) 382-4999
Please visit:
www.DBKLAIN.com
!
I
This message and any attached documents contain information from David B. Klain that jrnay
be confidential and/or privileged. If you are not the intended recipient, you may not
read, copy/ distribute, or use this information. If you have received this transmiss~on in
error, please notify the sender immediately by reply e-mail and then delete this message.
1
Page 1 of 1
Lillard, Sarah N
From: Ryan Hartman [Ryan.Hartman@CTRWD.ORG]
Sent: Monday, October 02, 2006 2:23 PM
To: lillard, Sarah N
Subject: Branson Bldg
Sarah,
If this item was sent as vowc Commercial Bldgs. & Townhomes - See 3001, Block F, we have!
seen the plans but still have outstanding issues with the townhomes associated wiih
the submittal. Therefore approval has not been granted for the set of plans.
Ryan C. Hartman, E.I.T
District Engineer
Clay Township Regional Waste District
10701 N. College Ave., Suite A
Indianapolis, IN 46280-1098
Direct: 317-844-9200
Fax: 317-844-9203
Cell: 317-714-7219
ryan.hartman@ctrwd.orq
10/6/2006
Page 1 of2
Lillard, Sarah N
Sent:
To:
From: Ryan Hartman [Ryan.Hartman@CTRWD.ORG]
Monday, October 02,20069:49 AM
Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; grh@co.hamilton.in.us; rct@co.hamilton.in.us;
jbt@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick
Cc: david@dbklain.com
Subject: RE: Pre-Submittal for the Brason Bldg @ The Village of West Clay
Sarah,
CTRWD has not received any plans or information regarding this project. Thank you!
Ryan C. Hartman, E.I.T
District Engineer
Clay Township Regional Waste District
10701 N. College Ave., Suite A
Indianapolis, IN 46280-1098
Direct: 317-844-9200
Fax: 317-844-9203
Cell: 317-714-7219
ryan.hartman@ctrwd.org
From: Lillard, Sarah N (mailto:SLillard@carmel.in.gov]
Sent: Monday, October 02,20069:12 AM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; grh@co.hamilton.in.us; rd@co.hamilton.in.us; Ryan Hartman;
jbt@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick
Cc: david@dbklain.com
Subject: Pre-Submittal for the Brason Bldg @ The Village of West Clay
The Dept. of Community Service, Building & Code Enforcement division, has
received a submittal for the purpose of obtaining a building permit for foundation.!
PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF YOU HAVE
OUTSTANDING ISSUES. After that time, we may proceed with the meeting and
submittal.
Project:
The BRASON BUILDING
@ the Village of West Clay
(2159 Glebe St. ?)
Meeting Date:
PENDING
Time:
PENDING
10/6/2006
Lillard. Sarah N
Cc:
Subject:
Greg Hoyes [grh@co.hamilton.in.us]
Tuesday, October 03, 2006 3:51 PM I
Conn, Angelina V; Foley, Amanda J; Hill, Dick B; Duncan, Gary R; Hoyt, Gary A; Blanchard,
Jim E; Griffin, Matt L; Redden, Nick; Brewer, Scott I; Lillard, Sarah N; Dolan, Veronica A;
Akers, William P; Joel Thurman; Robert Thompson; Ryan.hartman@ctrwd.org
david@dbklain.com
Re: Pre-Submittal for the Brason Bldg @ The Village of WestClay
From:
Sent:
To:
Sarah
Based on the submittal that I received today, the Branson BIdg no longer has any
outstanding issue. I still need to review the revised plans for the entire Block F
development, but I do not have any problems with Mr. Klain starting his building at
point. If you have any questions, please let me know.
this
I
Greg Hayes
HCSO Plan Reviewer
>>> "Lillard, Sarah Nll <SLillard@carmel.in.gov> 9:11 AM Monday, October
02, 2006 >>>
The Dept. of Community Service, Building & Code Enforcement division, has received a i
submittal for the purpose of obtaining a building permit for foundation. PLEASE llRE~LY TO
ALL" AS SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After that time, we may proceed
with the meeting and submittal.
Project:
The BRASON BUILDING
@ the Village of West Clay
(2159 Glebe St. ?)
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
06070006 (TAC)
Representative:
David B. Klain
DB Klain Builders, LLC
david@dbklain.com
Ph. (317) 846-4344
1
Lillard. Sarah N
Cc:
Subject:
David B. Klain [david@dbklain.com]
Monday, October 02, 2006 1 :39 PM ,
Greg Hoyes; Conn, Angelina V; Foley, Amanda J; Hill, Dick B; Duncan, Gary R; Hoyt, Gary A;
Blanchard, Jim E; Griffin, Matt L; Redden, Nick; Brewer, Scott I; Lillard, Sarah N; Dolan:
Veronica A; Akers, William P; Joel Thurman; Robert Thompson; Ryan.hartman@ctrwd.org
David B. Klain; George Sweet
Re: Pre-Submittal for the Brason Bldg @ The Village of WestClay
From:
Sent:
To:
Greg,
Yes the building
still need to be
, ' I
was submitted at the Klain Building. What are the outstandlng lssue~
resolved?
that
Sincerely,
David B. Klain
D.B. Klain Builders, LLC
715 East 107th Street
Indianapolis, IN 46280
Office: (317) 846-9992
Fax: (317) 846-2070
Digital Pager: (317) 382-4999
Please Visit:
www.DBKLAIN.com
This message and any attached documents contain information from David B. Klain that may
be confidential and/or privileged. If you are not the intended recipient, you may not
read, copy, distribute, or use this information. If you have received this transmission in
error, please notify the sender immediately by reply e-mail and then delete this message.
-----Original Message-----
From: "Greg Hoyes" <grh@co.hamilton.in.us>
Date: Mon, 02 Oct 2006 11:59:03
To:IlAngelina V Connll <Aeonn@carmel.in.gov>, "Amanda J Foley" <afoley@carmel.in.lgov>,
lIDick B Hill" <DHill@carmel. in. gov>, "Gary R Duncan n <gduncan@carmel. in. gov>, I
llGary A Hoyt" <Ghoyt@carmel. in. gov> , uJim E Blanchard 11 <JBlanchard@earmel. in. gbv>,
"Matt L Griffin" <mgriffin@carmel.in.gov>,"Nlck Redden" <nredden@carmel.in.govl'>'
lIScott I Brewer" <SBrewer@carmel.in.gov>, "Sarah N Lillardl!
<SLillard@carmel.in.gov>, "Veronica A Dolan" <VDolan@carmel.in.gov>, "William
P Akersu <WAkers@earmel.in.gov>, lIJoel Thurman II <jbt@co.hamilton.in.us>, I
"Robert Thompson 11 <rct@co.hamilton. in. us>, <Ryan. hartman@ctrwd.org>
Cc:<david@dbklain.com>
Subject: Re: pre-Submittal for the Brason Bldg @ The Village of West
Clay
Sarah
I
Was this building maybe named the Klain Building when it went thru TAC. Looking at the
Docket Number and the plans associated with that (VOWC Commercial Bldgs. & Townhomes 1- See
3001, Block F), I see the Founders Building and the Klain Building. If that is true, HCSO
still has outstanding issues with the entire review for Block F that have not been
resolved. If you have any questions, please let me know.
Greg Hoyes
HCSO Plan Reviewer
>>> "Lillard, Sarah N" <SLillard@carmel.in.gov> 9:11 AM Monday, October
02, 2006 >>>
The Dept. of Community Service, Building & Code Enforcement division, has
submittal for the purpose of obtaining a building permit for foundation.
1
received a
PLEASE "REPLY TO
Lillard. Sarah N
From:
Sent:
To:
Greg Hoyes [grh@co.hamilton.in.us]
Monday, October 02, 2006 11 :59 AM
Conn, Angelina V; Foley, Amanda J; Hill, Dick B; Duncan, Gary R; Hoyt, Gary A; Blanchard,
Jim E; Griffin, Malt L; Redden, Nick; Brewer, Scott I; Lillard, Sarah N; Dolan, Veronica A;
Akers, William P; Joel Thurman; Robert Thompson; Ryan.hartman@ctrwd.org
david@dbklain.com
Re: Pre-Submiltal for the Brason Bldg @ The Village of WestClay
Cc:
Subject:
Sarah
Was this building maybe named the Klain Building when it went thru TAC. Looking at ihe
Docket Number and the plans associated with that (vawe Commercial Bldgs. & Townhomes :- See
3001, Block F) I I see the Founders Building and the Klain Building. If that is true,' HCSO
still has outstanding issues with the entire review for Block F that have not been
resolved. If you have any questions, please let me know.
Greg Hayes
HCSO Plan Reviewer
>>> "Lillard, Sarah N" <SLillard@carmel.in.gov> 9:11 AM Monday, October
02, 2006 >>>
The Dept. of Community Service, Building & Code Enforcement division, has received a i
submittal for the purpose of obtaining a building permit for foundation. PLEASE flREPLY TO
ALL" AS SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After that time, we may proceed
with the meeting and submittal.
Project:
The BRASON BUILDING
@ the Village of West Clay
(2159 Glebe St. ?)
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
06070006 (TAC)
Representative:
David B. Klain
DB Klain Builders, LLC
david@dbklain.com
Ph. (317) 846-4344
1
Page 1 of 1
Lillard, Sarah N
From: Lillard, Sarah N
Monday, October 02, 2006 9:12 AM
Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary'
R; Redden, Nick
Cc: 'david@dbklain.com'
Subject: Pre-Submittal for the Brason Bldg @ The Village of West Clay
Sent:
To:
The Dept. of Community Service, Building & Code Enforcement division, has
received a submittal for the purpose of obtaining a building permit for foundation.
PLEASE "RI;_J:JL Y TO ALL" AS SOON AS POSSIBLE, IF YOU HAVE
OUTSTANDING ISSUES. After that time, we may proceed with the meeting and
submittal.
Project:
The BRASON BUILDING
@ the Village of West Clay
(2159 Glebe St. ?)
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
06070006 (TAC)
Representative:
David B. Klain
DB Klain Builders, LLC
david@dbklain.com
Ph. (317) 846-4344
Again, if there are concerns that might affect the issuance of this permit,
please REPLY TO ALL on this e-mail.
10/2/2006
Page 1 of 1
,
Lillard, Sarah N
From: Lillard, Sarah N
Sent: Thursday, October 12, 2006 9:37 AM
To: 'david@dbklain.com'
Subject: Water Permit Information
David,
I did want to let you know that I heard from John Duffy of Carmel Utilities this morning,
regarding your water connection permit. The permit will cost: $4,602.00. You can either
come in and pay that prior to your submittal meeting, or you can bring the check when you I:
come in for the submittal meeting. When you pay for this permit, we will need to know the
name of the excavating company that will be excavating for the lateral connection to the utility
lines. That company must hold a current bond with the City of Carmel Engineer's office. If you
have any questions about this, please let me know. (This permit is issued out of the BUildingl &
Code Services office-not the Carmel Utilities office, even though it is for them.) ,
Thank you,
Sarah
SMt<ft- LiUM~
Building & Code Services
City of Carmel
Ph. (317) 571.2475
Fax (317) 571.2499
slillard@carme1.in.gov
10/12/2006
;
Page 1 of2
I
Lillard, Sarah N
From: Duffy, John M
Sent: Thursday, October 12, 2006 9:02 AM
To: Lillard, Sarah N
Cc: Kempa, Lisa L; Hill, Dick B
Subject: RE: The Klain Bldg. (Brason Bldg.) Village of West Clay
Sarah:
Based on 7,027 sq. ft,. the connection would be as follows:
7.027 sq ft. x .50 edu's = 3.5135 edu' x $1310 per edu = $4602 connection fee
Please let me know if you have any questions. Thanks
J Duffy
-----Original Message-----
From: Lillard, Sarah N
Sent: Thursday, October 12, 2006 8:55 AM
To: Duffy, John M
Subject: RE: The Klain Bldg. (Brason Bldg.) Village of West Clay
Here is the description I have from the builder:
"The use will be a mix of office and retail. The gross rentable square footage is 6,859, and there is a 168
s.f. Storage garage."
Thanks,
Sarah
-----Original Message---n
From: Duffy, John M
Sent: Wednesday, October 11, 2006 4:58 PM
To: Lillard, Sarah N
Subject: RE: The Kla!n Bldg. (Brason Bldg.) Village of West Clay
Sarah:
Can you tel mee what the building is for, i.e., office, retail, restaurant..7 and the total sq footagel
Thanks
J Duffy
-----Original Message-----
From: Lillard, Sarah N
Sent: Wednesday, October 11, 2006 3:21 PM
To: Duffy, John M
Subject: The Klain Bldg. (Brason Bldg.) Village of West Clay
John,
Another contractor is hoping to come in soon for another building in West Clay. It is called
10/12/2006
Page 1 of2
Lillard, Sarah N
From: Lillard, Sarah N
Sent: Tuesday, October 10, 2006 10:54 AM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary
R; Redden, Nick; Duffy, John M
Cc: 'david@dbklain.com'
Subject: RE: Pre-Submittal for the Brason Bldg @ The Village of West Clay
David,
The following requests for copies of certain parts of the approved plan come from members of
our Planning and Zoning office. One copy of each stamped plan is required for submittal for the
building permit. I have also listed outstanding items as I am aware of them, after the first items.
1. Please submit four (4) copies of the approved site plan to Scott Brewer, DOCS, One Civic Square, Carmel, IN,
46032. You will be notified when your copies are ready for pickup. Contact: Scott Brewer, City Forester/Environmental
Planner. One Civic Square; Carmel. IN 46032. Phone: (317) 571-2478. FAX (317) 571-2426
2. Please submit three (3) copies of the architectural elevation drawings for the structure to Matt Griffin, DOCS,
One Civic Square, Carmel, IN, 46032. You will be notified when your copies are ready for pickup. Contact: Matt
Griffin, Planning Administrator. One Civic Square; Carmel. IN 46032. Phone: (317) 571-2417. FAX (317) 571-2426.
I
Please contact John Duffy of Carmel Utilities regarding the water connection/availability. If a ~
permit for the water needs to be issued, that will need to be obtained prior to submittal for the
building permit, or at the time of the submittal meeting.
Additionally, I am still waiting to hear that Clay Township Regional Waste has signed off, or .
that you have obtained your permit. Also, I believe the City of Carmel Engineer's office still has
the most recent revised plans in review. We will need to hear back from them that the plans
have been approved.
Thank you,
Sarah
-----Original Message-----
From: Lillard, Sarah N
Sent: Monday, October 02,20069:12 AM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamllton.ln.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R;
Redden, Nick
Cc: 'david@dbklain.com'
Subject: Pre-Submittal for the Brason Bldg @ The Village of West Clay
,
The Dept. of Community Service, Building & Code Enforcement division, hasl
I
I
10/1 0/2006
Page 1 of2
Lillard, Sarah N
From: Duncan, Gary R
Thursday, October 05, 2006 3: 1 0 PM
Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Redden, Nick.
Cc: 'david@dbklain.com'
Subject: RE: Pre-Submittal for the Brason Bldg @ The Village of West Clay
Sent:
To:
Sarah,
We received revised plans and comment responses dated September 20th. We are still reviewing the latest plans.
Gary
-----Original Message-----
From: Lillard, Sarah N
Sent: Monday, October 02, 2006 09: 12
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org';
'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick
Cc: 'david@dbklain.com'
Subject: Pre-Submittal for the Brason Bldg @ The Village of West Clay
The Dept. of Community Service, Building & Code Enforcement division, has
received a submittal for the purpose of obtaining a building permit for foundation.
PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF YOU HAVE
OUTSTANDING ISSUES. After that time, we may proceed with the meeting and
submittal.
Project:
The BRASON BUILDING
@ the Village of West Clay
(2159 Glebe St. ?)
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
06070006 (TAC)
Representative:
David B. Klain
DB Klain Builders, LLC
10/6/2006
t
Page 1 of2
I
Lillard, Sarah N
From: Duncan, Gary R
Sent: Thursday, November 16, 2006 2:56 PM
To: Duffy, John M; Lillard, Sarah N
Subject: RE: Water Fee Issue @ 2 West Clay Buildings
~
*5-
*7--
Thanks so much John.
L
Gary
-----Original Message--m
From: Duffy, John M
Sent: Wednesday, November 15, 2006 13:07
To: Lillard, Sarah N
Cc: Duncan, Gary R
Sub' ct: RE: Water Fee Issue @ 2 West Clay Build'
Sarah:
II It appears that the sq. footage changed slightly from what was origianlly presented. Saying that I do not think it is
)-- signifigant enough to warrant holding up their permit. More than likely the extra sq. footage will not mean
addtionaJ water consumption so I am OK with the lesser fee. Sorry for the confusion.
J Duffy
-----Original Message-----
From: Lillard, Sarah N
Sent: Wednesday, November 15, 2006 11:16 AM
To: Duffy, John M; Duncan, Gary R
Subject: Water Fee Issue @ 2 West Clay Buildings
Importance: High
,
John & Gary,
Between myself and the contractors, we had been in touch with John regarding the water
connection fees that would be due for the Klain building at the Village of West Clay and the
Founders building at the Village of West Clay. I have John's email from 10/12/06 giving the fee
amount, based on the square footage and use information the builder had provided regarding
the Klain building. I then forwarded this number to the builder, so that he would be able to bring
in the check for the water when he came in to submit for the permit. Also, a representative far
the project of the Founders building contacted Utilities, and John let me know by phone an
10/11/06 what the fee for that building would be. I again passed that infarmatian ta the builder,
sa that they wauld be able ta prepare a check far their submittal.
Dick then brought aver his calculatian sheets far these buildings sametime later. I did nat laak
at the amaunts an those sheets at that time, as I assumed they wauld match what Jahn had
provided ta me. Hawever, I naticed taday when I went ta process the transactians, as bath
applicatians have naw been submitted, that the amaunts listed an the sheets provided by Dick
da nat match what was given ta me by Jahn. The fee amaunts pravided by Dick are mare than
what I had from John, and therefore the checks I naw have fram each builder are less than what
is listed an Dick's sheets.
I
I am nat sure what ta da. Gary, I have included ,you an this, as Dick is aut .of the .office. Caulcj
11/16/2006
Page 2 of2
either/both of you please advise me on how to proceed? I am listing below the amounts
calculated for each building.
~
Founders Buildinq: (6.756 Sq.Ft.)
Per John -- $4,425.18; Per Dick -- $4,821.00
Thank you for your assistance,
Sarah
11/16/2006
Form ED-1 Revised 10-20-82
Name of Project: :{.9_~-~~~_~<2!.6:_t??~S~.b-_t.___
Location: _______~~_t~~__Gkul~2_~~___________________
Name of Applicant: ""8.~"~L~h~~.plA...i:2::'lI__________
Address: if~~(~~ll~~~~'[~~~~~~hone: ____________________
Date Figured: 1i~~~Q~___ By: ~~~__ Applicable Ordinance(s) Jk~~l])-----------
CONNECTION
SEWER
TOTALS
(a) Total User Units:
(b) User Multiplier:
C""-A1u/l)
_:1~_________
(c) Total E.D.U.'s (a x b)
(d) Connection Charge per
1 E.D.U.
(e) Total con;e~ti;n-Charge
(e x d)
tJA.
WATER
(f)
(g)
(h)
Total User Units: ~~~29~~~___
User Multiplier: qL~~~IlQQQf\<-
Total E.D.U.'s (f x g) 2_~1_____
( i)
Connection Charge per
1 E.D.U. _L~~O~____
Total Connection Charge
(h x i)
i 5'00 j.<:::.
__-1'-__L______
(j)
---------------------------------------~---~-------------------------------------
AVAILABILITY
SEWER
(k) Number of Acres
------------
(1) Cost per Acre
--------------
WATER
-----
(n) Number of Acres
--------------
(0 ) Cost per Acre
--------------
(m) Availability Charges(k x 1)
/J,A,
-----------
(p) Availability Charges(n x 0)
/J,A,
(q) Meter Installation Fee
Total Charges
-----re-;-y-; m + p + q)
__.tJ:.-t::_____
--~~~~!~------
Date Paid:
By:
Received by:
. Remarks: ~h.::~Li..-A...J~Li-.L'12L-~-+>.fl.Q~~--lh.:L~__~f>~_____
__________gE--J::?id6\,dC SU.tJ~_!~~_.t:Jtd~~__'-S_~Q.k________
(Over for further remarks)
- '.
November g, 2006
EL
JAMES BRAINARD, MAYOR
Board of Public Wotb and Safety
One Civic Square
Cannel, IN 46032
RE: Water AvallabWty RequestIVWage or West Clay, Seetlon 3OO1A Block F Townhomes and Commercial
BuUdlngs
Dear Board Members:
I recommend the Board approve Water Availability for this townhome and commercial development as follows:
VOWC. SECTION 3oo1A BLOCK F TOWNHOMES AND COMMERCIAL BUILDING
Water: 31.5 EDUs per Water Ordinance A66/A77. Not to exceed an average daily flow of 9,450.0 gallons per
day.
This development is in the service area of the Clay Township Regional Waste District for sanitary sewers.
Construction or development of this project must begin within twelve (12) months or said approval expires and the
developer or builder must reapply to the Board.
EDU Calculation
The Schneider Corporation estimated EOUs as follows:
Founders Building -7,350 ft> @ 0.5 EDUIlOOO ft> = 3.6g EOU
KIain Building -7,630 ft>@ 0.5 EDUlIOOO ft> = 3.82 EOU
(24) 3-BR Townhomes Units @ 1.0 EOU each = 24.00 EOU
Total EOU 31.50 EOU
Water Connection Fees
31.5 EOUs @$I,310.oo Water Connection FeelEOU = $41,265.00
Water AvallabUlty Fees
Not Applicable
Sincerely,
:;?;1.":2 ~ ~---6
Michael T. McBride, P.E.
City Engineer
MTMIrbh
Eoclosure
cc: John Duffy, Cannel Utilities
Brandon Burlce, The Schneider Corporation
Kevin Krulik, Brenwick Development
,:\A V AIL06\VOWOOOIABLKFrOWNHOMESCOMMBlDO
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317571,2441 FAX 31757L2439
EMAIL engineering@carmel.in.gov
~*~*****~*******************************************************~", ~
* ' ~ ,t***********************
* TRANSACTION REPORT p, 01 *
~ FOR: NOV-20-2006 MON 10: 33 AM ~
* *
~ DATE START RECEIVER TX TIME PAGES TYPE NOTE ~
~ NOV 20 10:32 AM 98462070 1'05" 2 SEND M# DP ~
* OK 835 *
* *
* TOTAL : 1M 5S PAGES' 2 *
"",...",...""..".""..,.."",..,.."",....."."",..."..""".,.,...,;"""",.....",:
MU<NS OF EGRESS
~.
age level is the same as for the means of egress illumi-
nation in Section 1003.2.11,1. The reduction of
illumination recognizes the performance characteristics
over time of some types of power supplies, such as bat-
teries. The minimum levels are sufficient for the occu-
pants to egress from the building.
The maximum illumination uniformity ratio of 40
means that the variation in the illumination levels is not
to exceed 40. For example, a minimum of 0.06 foot-can-
die (0.6 lux) would establish a maximum illumination of
2.4 foot-candle (24 lux) in an adjacent area. This Is to
establish a variation limit such that the means of egress
can be seen as a person walks from bright to darker ar-
eas along the egress path.
1003.2.12 Guards. Guards shall be located along open-sided
walking surfaces, mezzanines. industrial equipment platforms,
stairways, ramps and landings which are located more than 30
inches (762 mm) above the floor or grade below. Guards shall be
adequate in slTength and attachment in accordance with Section
1607.7. Guards shall also be located along glazed sides of stair-
ways, ramps and landings that are located more than 30 inches
(762 nun) above the floor or grade below where the glazing pro-
vided does not meet the strength and attachment requirements in
Section 1607.7.
Exception: Guards are not required for the following loca-
tions:
L On the loading side of loading docks or piers.
2. On the audience side of stages and raised platforms,
inc\udin~ steps ,leading up to the stage and raised
1003.2.12-FIGURE 100302.12
3. On raised stage and platform floor areas such as run-
, ways. ramps and side stages used for entertainment or
presentations.
4. At vertical openings in the performance area of stages
and platforms.
5. At elevated walking surfaces appurtenant to stages and
platforms for access to and utilization of special light"
ing or equipment.
6. Along vehicle service pits not accessible to the public.
7. In assembly seating where guards in accordance with
Section 1008.12 are permitted and provided.
.$0 This section establishes the conditions that warrant
guards to be located on all types of open-sided walking
surfaces that are located more than 30 inches (762 mm)
above the floor or grade below, including but not limited
to those listed in the code. Additionally, this section reg.
, ulates where glazing is installed on the 'open side" of a.
stairway and the glazing has not been designed to resist
the forces from a fall.
Where one ormore sides of a walking surface is open
to the floor level or grade below. a guard system must
be provided to minimize the possibility of occupants ac-
cidentally failing to the surface belOW (see Figure
1003.2.12). A guard Is required only where the differ-
ence in elevation between the higher walking surface '
and the surface below is greater than 30 inches (762
mm). The 'loads for guard design 618 addressed in See-
tion1607. '
The exceptions identify some typical situations where
.... ."lrAc ::am nnt nmctical.
A~\lJ.N3WWOO @3COO !lNJC1Ina l\1NOIJ.\lN~3J.NI OOOZ
V'JnV'JINIV'J ..lv
vZ.O~
J.H~J3H o~"'n~
n~TCOO~ 91n61:1
'WW V'SZ = 40U[ ~ :IS '0:1
-------- -------------
lIVClON\tH 3Hl OSl\i SI1IVCl
dOl 3Hl 3Cl3HM SllNn 8NIl13MO
l-Cl NIH1IM ON\t S-Cl dnOCl8 NI
S318N\tdn880 ClO.:l ..8S 01 "vS 38 A\tV'J
~.
40U!-1> e le41 saleo!pu! le4140JeasaJ S! aJa4ds (ww 1:0~)
40U!-1> e 01 pJen6 e U/ s6u!uado 6u!I!w!l JOj s!seq a4l-:-
'ssed lOll
I1eqs JOjOlU1lIP U! (WW toz) soqouI 8 oloqds e 'sooepns
gu"![e", luooefpe olfl oAoqe (ww L90IJ soqoUl ZP 01
, (=099) soqoUlnJo IqglOq e wOld '(ww 099) soqoU!
.. n JO Iqgloq ~ 01 dn guruodo Aue qgnollfl ssed IOU
);:ueo OJoqds (ww ZO rJ JOI;lU1l!P-qOUl_p e lelfl qons SWOI
'::Ied [11)uowewo JO SJOISn[eq oAeq I1eqs sOJ.loIleg pue
"_~~UOJIl!'q 'saxoq 10 e~Jst?J e re "lBU!Wl;}l ,{"Ql 'iJJ~HlM. .
~lsre JO pu~ olflle spmng 'seom gupeos Alqwoss~ uJ, 'p
~'. .gu!uado Aue q8nOll.{1 ssed 01
.urw EE~) soqOUl I Z JO JOlowmp e qll'" OJoqds e llIDlOd
f?u rreqs uoqJTl11SUOJ Jaqlo 10 SH1U alt~,p"WJalU! rtnuoz
'':{oq 'SJolsnl~q 's JO H 'd 'E-r dnol[) U! sOlouednooo ur 'E
rl- '8u!uado Aue q8nonp SSl?d lOilURJ (WID
'E>) SOUOUl rZJO J010welP ~ ql!'" OJoqds e 1e41uons sl~
:, lew PI[OS JO oq JO sJOIsnl1?q OAeu Ileus spmng 'luOW
f"bo JO SWOISAS gu!qwn[d JO Jeolueuoow '[eo!llOOJO
';~sn PUe 01 SSoooe JOJ soo~J1nS gUl'l[e'" pOleAO[O l\f 'z
'guruodo Oul ugnollj1 ssed louueo JOjOlU1lIP UI
'" Z~r) SOUOU! 9 JO OJouds e le41 uons oZrs wnW'X1?W
o oq Ileus Ae"',!11)S 1? JO OplS uodo 041 Ie [IeJ WOlloq
~P""Jj 'JO"J olfl Aq pOWJoJ sguruodo mlngue'J) ou1. 'r
' :SUoJldaox",
: 'ssed IOU lI1?US JOlowmp Ul (ww toZ) SOUOU! 8
,pS1? 'sooeJ1ns gU!'!le'" luooefpe OuIOAOq1? (ww L90rJ SOUOUl
3 ~O SN\l3W
,
,
L___,
,
1
---,
1
1_-
VlJnVIJINIV'J ..lv
ZP 01 (ww 1>98) "'UOU[ VEJolqg,ou e WOJd '(WWP98) SOUOUl PE
JO jqg!Ou e 01 dn gUluodo Aue ugnoJqI ssed 10uueo Olouds (Will
zoO lOIOlU1l!P-uOUI-P ~ I~ul qons SWolled [~IUOW~wO JO SJOIsn
-l~q OA~q I1~qs spmng uodO 'SUOIIIllIW!fllu!uado z'Zrn:OOI
'ao!peJd uo/pnJlsuoo
IUaJlnO 41!M lualS!SUo:J S! 146!a4 pJen6 alqeMOl!e paonp
-aJ a4l 'pJen6 JaMO! e jO dOl a41 aq 01 /!eJpue4 a41 SMO!
-Ie sa/Ouedn::J::Jo le[luap[saJ u!ejJa::J JOj UO!lda::JX8 a4l
'I[npe 86e
-J8Ae 841 jO AI!AeJ6 jO Jalua::J 841 8Aoqe pJen6 841 jO dOl
a41 SInd S!4l 'sasodmd UO!paIOJd JOj 146!84 81enb8pe
sap!AoJd aJOW JO (WW L90~) s84::JU! 1:v le41 UM04S se4
a::JuafJadx3 ,( ~ '1: ~ 'n:oo ~ aJn6!:! aas) 8::JejJns 6u/'lleM
lU8::Je[pe ue 01 JO pe8JI 841 jO 86pa 6ulPe81 841 01 UMOp
pJen6 841 jO dOl 841 WOJj Al!e::J!jJ8A p8mse8w se 146!84
U/ (WW L90~) s84::JU/ 1:1> ue41 SS8/ aq IOU lsnw spJen<)_:_
,guIsou peOJI JI1?IS 041 JO 02po 2u!p1?0[ Oul WOJJ AlIeo
-lllOA poms1?Ow (ww ~96) soqoUl 8E U1?ulOJOW IOU pue (ww
P98) sOuoul 1>E U1?41 SSO/IOU Iq2,ou e OA1?q I11?qs /l1?Jpueq e S1?
SOAJOS Os[e [mJ dOl osou'" spJ1?n2 'Z'I or UOljOOS Ul o[qeol[dd1?
S1? 410q 'Z-~ dno.lO Ul SOlOu1?dnooo Ul Sllun 2u![JO"'p [enpIA
-lpUl Ulql'''' pm E-~ dnol[) Ul SOlou1?dnooo JOd :uolldaox",
'pmoql1?oS IUoo
-efpe JO OO1?pns 2u!'ll1?'" luooefp1? 'p1?OJ) 041 JO 02po 2UlpeOJ oql
OAOq]? AlI1?OlllOA pomS1?OW 'q2'q (WW L90 IJ SOUOU! ZP U1?lfl ssol
IOU JOW1?q OAl10010Jd 1? IDlOJ lI1?qs Spl1?na 'jqll!aH rzrTmoI
-
MEANS OF EGRESS
age level is the same as for the means of egress illumi-
nation in Section 1003.2.11.1. The reduction of
illumination recognizes the performance characteristics
over time of some types of power supplies, such as bat-
teries. The minimum levels are sufficient for the occu-
pants to egress from the building.
The maximum illumination uniformity ratio of 40
means that the variation in the illumination levels is not
to exceed 40. For example, a minimum of 0.06 foot-can-
die (0.6 lux) would establish a maximum illumination of
2.4 foot-candle (24 lux) in an adjacent area. This is to
establish a variation limit such that the means of egress
can be seen as a person walks from bright to darker ar-
eas along the egress path.
1003.2.12 Guards. Guards shail be located along open-sided
walking surfaces, mezzanines. industrial equipment platforms.
stairways, ramps and landings which are located more than 30
inches (762 mm) above the floor or grade below. Guards shall be
adequate in strength and attachment in accordance with Section
1607.7. Guards shall also be located along glazed sides of stair-
ways. ramps and landings that are located more than 30 inches
(762 mm) above the floor or grade below where the glazing pro-
vided does not meet the strength and attachment requirements in
Section 1607.7.
Exception: Guards are not required for the following loca-
tions:
1. On the loading side of loading docks or piers.
2. On the audience side of stages and raised platforms,
including steps leading up to the stage and raised
platforms.
.;
4" SPHERE
SHALL NOT
PASS THROUGH
MORE
THAN 30"
1 inch = 25.4 mm.
Figure 1003.2.12
OPEN-SIDED WALKING AREA
,
,
!.
f
lOO INTERNATIONAL BUilDING CODE@COMMENTARY
1003.2.12 - FIGURE 1003.2.12
3. On raised stage and platform floor areas such as run-
ways. ramps and side stages used for entertainment or
presentations.
4. At vertical openings in the performance area of stages
and platforms.
5. At elevated walking surfaces appurtenant to stages and
platforms for access to and utilization of special light-
ing or equipment.
6. Along vehicle service pits not accessible to the public.
7. In assembly seating where guards in accordance with
Section 1008.12 are permitted and provided.
.:. This section establishes the conditions that warrant
guards to be located on all types of open-sided walking
surfaces that are located more than 30 inches (762 mm)
above the floor or grade below, including but not limited
to those listed in the code. Additionally, this section reg-
ulates where glazing is installed on the "open side" of a
stairway and the glazing has not been designed to resist
the forces from a fall.
Where one or more sides of a walking surface is open
to the floor level or grade below, a guard system must
be provided to minimize the possibility of occupants ac-
cidentally falling to the surface below (see Figure
1003.2.12). A guard is required only where the differ-
ence in elevation between the higher walking surface
and the surface below is greater than 30 inches (762
mm). The loads for guard design are addressed in Sec-
tion 1607.
The exceptions identify some typical situations where
guards are not practical.
CONTiNUOUS
HANDRAIL
HANDRAIL EXTENDING
12" BEYOND THE STAIR
10-23