Loading...
HomeMy WebLinkAboutErosion Control Estimate 6555 Carrollton Avenue  Indianapolis, IN 46220  317-251-1738  Fax-251-1923 Page 1 of 2 October 19, 2023 Mr. Alex Jordan City of Carmel Engineering Department One Civic Square Carmel, IN 46032 RE: Tom Wood Audi Service Addition Docket No. PZ-2023-00117 ADLS Amend Engineer’s Estimate for On-site Erosion Control Dear Mr. Jordan: In accordance with your review, we are providing an engineer’s construction cost estimate for items associated with on-site erosion control measures: 1. Erosion Control Work for 4.61-Acre (0.83-acre disturbed) Site - $61,600.00 Total cost is $61,600.00 for on-site erosion control Performance Guarantees. The contractor will provide a Bond in the amount of $61,600.00 (100% of Total Cost). Attached is a breakdown of item costs used in the construction estimate. If you have any questions or are in need of any additional information, please give me a call. Thank you. Sincerely, ROGER WARD ENGINEERING, INC. Roger C. Ward, Jr. Professional Engineer c.c. John Thomas Page 2 of 2 Tom Wood Audi Service Addition - Engineer’s Estimate Erosion Control Work for 4.61-Acre Site:  Construction Entrance and Staging Area $5,500.00  Mulch Socks, Silt Fence $5,000.00  Storm Sewer Inlet Protection $2,500.00  Concrete Washout $1,800.00  Storm Water Inspection and Monitoring $1,800.00  Aqua-Swirl XC-7 $45,000.00 Total: $61,600.00