HomeMy WebLinkAboutErosion Control Estimate
6555 Carrollton Avenue Indianapolis, IN 46220 317-251-1738 Fax-251-1923
Page 1 of 2
October 19, 2023
Mr. Alex Jordan
City of Carmel Engineering Department
One Civic Square
Carmel, IN 46032
RE: Tom Wood Audi Service Addition
Docket No. PZ-2023-00117 ADLS Amend
Engineer’s Estimate for On-site Erosion Control
Dear Mr. Jordan:
In accordance with your review, we are providing an engineer’s construction cost
estimate for items associated with on-site erosion control measures:
1. Erosion Control Work for 4.61-Acre (0.83-acre disturbed) Site - $61,600.00
Total cost is $61,600.00 for on-site erosion control Performance Guarantees. The
contractor will provide a Bond in the amount of $61,600.00 (100% of Total Cost).
Attached is a breakdown of item costs used in the construction estimate.
If you have any questions or are in need of any additional information, please give me a
call. Thank you.
Sincerely,
ROGER WARD ENGINEERING, INC.
Roger C. Ward, Jr.
Professional Engineer
c.c. John Thomas
Page 2 of 2
Tom Wood Audi Service Addition - Engineer’s Estimate
Erosion Control Work for 4.61-Acre Site:
Construction Entrance and Staging Area $5,500.00
Mulch Socks, Silt Fence $5,000.00
Storm Sewer Inlet Protection $2,500.00
Concrete Washout $1,800.00
Storm Water Inspection and Monitoring $1,800.00
Aqua-Swirl XC-7 $45,000.00
Total: $61,600.00