HomeMy WebLinkAbout06110106 Sq. Ft.
k. All sidewalks and driveways
I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations
m. Drainage flow arrows
n. All drainage swales and subsurface facilities (retention / detention areas, etc.)
o. Sump pump -- Show sump pump pit(s) and discharge line locations
p. Geothermal heat pump discharge locations
*NOTE: If land is not within a platted subdivision, a legal description is required.
'--..1 ,__..
';>
,
I
FURTHER NOTES / NOTICES: I
';> CARMEL ZONING ORDINANCE Z-289, SECITON 29.04.02 (3): "The Director shall approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written application form and accompanying i
materials. The Improvement Location Permit shall be issued when the proposed structure, improvement, or use a~d
its location conform in all respects to this ordinance."
';> IN ADDITION TO THE ABOVE-LISTED SUBMmAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY I
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF I
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. I
';> ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, I~
THE SUBMmED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT I
OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES.
SUBMmAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMmAL, WILL '
EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW.
';> THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE UNOCCUPIABLE. UNFINISHED SPACE. IF AN AREA SO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCITON PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA AFTER THE ,
ISSUANCE OF THE PERMIT, THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT. :
ALL CONSTRUCTION IS SUBJECT TO FIELD INSPECTION, AND SHOULD NOT BEGIN PRIOR TO THE
ISSUANCE OF THE BUILDING PERMIT. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED,
INSULATED/COVERED, AND/OR OCCUPIED PRlOR TO THE APPROPRIATE INSPECITON. Beginning prior to obtaining
a building permit and/or proceeding with construction beyond the stage of a required inspection without approval '
constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08. .
BUILDING &1 CODE ENFORCEMENT; CITY OF CARMEL. One Civic 5'1'; Catmel, IN 46032. ph. (317) 571-2444.1
----~~ ~ --- - - - -
,
I, the undersigned, certify that all of the above listed information is shown completely and accurately on the i
attached plot or site plan(s), construction plans, and any other sUbmitt,ed documentation, submitted with the I
building permit application to the City of Carmel/Clay Township Department of Community Services. I further
certify that the joining of water supply piping shall be made with lead-free solders and fluxes. Failure to comply
will result in a replacement of the system. (Plumbing Code P-509-5) Under the penalties of Perjury (Indiana ,
Code 35-44-2-1), I also hereby affirm, under oath, that all of the information I have provided in the table below: is
true and accurate, to the best of my knowledge and belief, and that I have not knowingly or intentionally ,
provided or omitted any information that would tend to hide, obscure, or otherwise mislead the Dept. of
Community Services regarding the truth of the matters addressed therein.
BASEMENT 1 st Floor 2nd Floor 3ra Front Rear Total Sq. TOTAl.!
,
(Finished and Floor Porch Porch or Ft. of I
Unfinished) Sunroom Garages
2101- ZS01 r5" ')2- ilLS' L-"2- )09 f-'}') ) :;gp, ,
I
/?~
APPLICANTS SIGNATURE
~ UWR!
NAME PRINTED
II/. '/0(,
I 'DATE
S:Permits/FORMS/RESIDENTIAL PROCEDURES
20f2