HomeMy WebLinkAbout06110079 Correspondence
-f"....
Page 1 of2
Lillard, Sarah N
From: Duncan, Gary R
Sent: Thursday, November 16, 2006 2:56 PM
To: Duffy, John M; Lillard, Sarah N
Subject: RE: Water Fee Issue @ 2 West Clay Buildings
5fi
I
I
~*;L
Thanks so much John.
Gary
-----Original Message-----
From: Duffy, John M
Sent: Wednesday, November 15, 2006 13:07
To: Lillard, Sarah N
Cc: Duncan, Gary R
A Subject: RE: Water Fee Issue @ 2 West Clay Buildings
Ysarah
It appears that the sq. footage changed slightly from what was origianlly presented. Saying that I do not think it is
signifigant enough to warrant holding up their permit. More than likely the extra sq. footage will not mean
addtional water consumption so I am OK with the lesser fee. Sorry for the confusion.
John & Gary,
Between myself and the contractors, we had been in touch with John regarding the water
connection fees that would be due for the Klain building at the Village of West Clay and the
Founders building at the Village of West Clay. I have John's email from 10/12/06 giving the fee
amount, based on the square footage and use information the builder had provided regarding
the Klain building. I then forwarded this number to the builder, so that he would be able to bring
in the check for the water when he came in to submit for the permit. Also, a representative for
the project of the Founders building contacted Utilities, and John let me know by phone on
10/11/06 what the fee for that building would be. I again passed that information to the builder;
so that they would be able to prepare a check for their submittal.
I
Dick then brought over his calculation sheets for these buildings sometime later. I did not look
at the amounts on those sheets at that time, as I assumed they would match what John had
provided to me. However, I noticed today when I went to process the transactions, as both
applications have now been submitted, that the amounts listed on the sheets provided by Dick
do not match what was given to me by John. The fee amounts provided by Dick are more than
what I had from John, and therefore the checks I now have from each builder are less than what
is listed on Dick's sheets.
I am not sure what to do. Gary, I have included you on this, as Dick is out of the office. Could
11/16/2006
:iJ
Page 2 of2
either/both of you please advise me on how to proceed? I am listing below the amounts
calculated for each building.
Klain Buildinq: 17,027 Sq.Ft.}
Per John -- $4,602.00; Per Dick -- $5,004.00
Thank you for your assistance,
Sarah
11/16/2006
!-.- ,~
Form ED-l Revised 10-20-82
Name of Project: Y()Wc. ~cN '7.:iVI.A -e::, <-Y"Li7
Location: _~_~_~~=~~--g;~~~~~~~_===================
Name of Applicant: '~lU!.Q0_~_~-0..M.....(;:;~=h"________
Address: \~f}.1.l.J~.~Jl:~.,l_~_~1:.+-g~iS_?m-~%~Phone: __________________
Date Figured: U~Cl~____ By: ~~__ Applicable Ordinance(s) ~~L2(~2---------
CONNECTION
SEWER
TOTALS
(a) Total User Units:
(b) User Multiplier:
(!7f2..Lt}O
(d)
Connection Charge per
1 E.D.U.
Total Connectlo;-charge
(e x d) ____~,~_____
(c) Total E.D.U.'s (a x b)
(e)
WATER
(f)
(g)
(h)
Total User Units: ~~~Q_eI~___
User Multiplier: Q~~~~J1QQ2~r~(i)
Total E.D.U.'s (f x g) :'.b~ (j)
Connection Charge per
1 E.D.U. 13.\0=
----------
Total Connection Charge
(h x i)
. '00
4.82/
-,----------
---------------------------------------~---~-------------------------------------
AVAILABILITY
SEWER
(k) Number of Acres
(1) Cost per Acre
(m) Availability Charges(k x 1) ,J.Ij-,
WATER
(n) Number of Acres
(0) Cost per Acre
(q)
Meter Installation Fee
tJ.f't .
------------
__~.:_'h____
~ Ll 62./ ~
-----~----------
(p) Availability Charges(n x 0)
Total Charges
----(e-+-j-+ m + p + q)
Date Paid:
By: _____________ Received by:
* Remarks: ~_.&J_~~~~.QQ.~9~--~.:L-~-~~.:?~----------
_________~f:. p~~( C_~!. s,~~-c..~-lli~~-~~-+-ZQ.Q-Q.,-------
--------------------------------------------------------------------------------
(Over for further remarks)
7...
1
November 8, 2006
EL
JAMES BRAINARD, MAYOR
Board of Public Works and Safety
One Civic Square
Cannel, IN 46032
RE: Water AvallablUty RequestIVUlage of West Clay, SectIon 3001A Block F Townbomes and Commercial
BuUdlngs
Dear Board Members:
I recommend the Board approve Water Availability for this townhome and commen:iaJ development as follows:
VOWC. SECTION 3001A BLOCK F TOWNHOMES AND COMMERCIAL BUILDING
Water: 31.5 BOUs per Water Ordinance A66/A77. Not to exceed an average daily flow of9,450.0 gallons per
day.
This development is in the service area of the Clay Township Regional Waste Oistrict for sanitary sewers.
Construction or development oftbis project must begin within twelve (12) months or said approval expires and the
developer or builder must reapply to the Board.
EDU Calculation
The Schneider Corporation estimated EOUs as follows:
Founders Building -7,350 ft2 @ 0.5 EOU/looO ft2 = 3.68 EOU
KIain Building -7,630 ft2 @ 0.5 EOU/looO ft2 = 3.82 EOU
(24) 3-BR Townhomes Units @ 1.0 BOU each = 24.00 EOD
Total EOU 31.50 EOU
Water Connection Fees
31.5 EOUs@$I,310.00 Water Connection Fee/EOU = $41,265.00
Water AvallablUty Fees
Not Applicable
Sincerely,
?JJ.'Z ?/1~ -.6
Michael T. McBride, P.E.
City Engineer
MTM/rbh
Enclosure
cc: lohn DullY, Carmel Utilities
Brandon Burlce, The Schneider Corporation
Kevin Krulik, Brenwick Development
S:\AVAIL06\VOWC3001ABLKFTOWNHOMESCOMMBLDG
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAx 317.571.2439
EMAIL engineering@carmel.in.gov
Page 1 of 1
Lillard, Sarah N
From: Lillard, Sarah N
Sent: Wednesday, October 11,20063:38 PM
To: 'beesley@blaze-inc.com'
Cc: Dolan, Veronica A
Subject: Founders Building
Michael,
I did want to let you know that I got a phone call from John Duffy of Carmel Utilities this
morning. Your water connection permit will cost: $4,425.18. You can either come in and pay
that prior to your submittal meeting, or you can bring the check when you come in for the
submittal meeting. When you pay for this permit, we will need to know the name of the
excavating company that will be excavating for the lateral connection to the utility lines. That
company must hold a current bond with the City of Carmel Engineer's office. If you have any
questions about this, please let me know. (This permit is issued out of the Building & Code
Services office-not the Carmel Utilities office, even though it is for them.)
Thank you,
Sarah
SMI<h-LiIlM~
Building & Code Services
City of Carmel
Ph. (317) 571-2475
Fax (317) 571-2499
slillard@carmel.in.gov
10/11/2006
.
Page 1 of2
Lillard, Sarah N
Sent:
To:
Ryan Hartman [Ryan.Hartman@CTRWD.ORG]
Tuesday, October 10, 2006 9:36 AM
Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; grh@co.hamilton.in.us; rct@co.hamilton.in.us;
jbt@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John'
M
Cc: radams@lauth.net
Subject: RE: Pre-Submittal for North Meridian Medical Pavilion B building
From:
Sarah,
Spoke to Mr. Adams with Lauth Construction LLC and currently they are filling out an application and sending
plans over for review. Thanks!
Ryan C. Hartman, E.I.T
District Engineer
Clay TOM1Ship Regional Waste District
10701 N. College Ave., Suite A
Indianapolis, IN 46280-1098
Direct: 317-844-9200
Fax: 317-844-9203
Cell: 317-714-7219
~an.hartman@ctrwd.orq
From: Lillard, Sarah N [mailto:SLillard@carmel.in.gov]
Sent: Monday, October 09, 2006 4: 13 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; grh@co.hamilton.in.us; rct@co,hamilton.in.us; Ryan Hartman;
jbt@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John M
Cc: radams@lauth.net
Subject: Pre-Submittal for North Meridian Medical Pavilion B building
The Dept. of Community Service, Building & Code Enforcement division, has
received a submittal for the purpose of obtaining a building permit for foundation.
PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE. IF YOU HAVE
OUTSTANDING ISSUES. After that time, we may proceed with the meeting and
submittal.
Project:
NORTH MERIDIAN MEDICAL PAVILION B Bldg.
12188-B Meridian St. N.
Meeting Date:
PENDING
Time:
PENDING
10/1 0/2006
Page 1 0[2
Lillard, Sarah N
From: Hoyt, Gary A
Sent: Tuesday, October 10,2006 11 :07 AM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica
A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org';
'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy,
John M
Cc: 'beesiey@blaze-inc.com'
Subject: RE: Pre-Submittal for The Founders Bldg @ Village of West Clay
The fire department needs conformation if the building is sprinklered. If so a
drawing will need to be provided showing the location of the fire department
connection. We are also requesting a Knox box and Knox locking FDC caps for
the sprinkler siamese if applicable.
Thank you,
Gary Hoyt
Carmel Fire Department
From: Lillard, Sarah N
Sent: Monday, October 09,20061:19 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; 'grh@co,hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org';
'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John M
Cc: 'beesley@blaze-inc.com'
Subject: Pre-Submittal for The Founders Bldg @ Village of West Clay
The Dept. of Community Service, Building & Code Enforcement division, has
received a submittal for the purpose of obtaining a building permit for foundation.
PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF YOU HAVE
OUTSTANDING ISSUES. After that time, we may proceed with the meeting and
submittal.
Project:
The FOUNDERS BUILDING
@ the Village of West Clay
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
?????
Representative:
10/1 0/2006
,.,.,'
<Sf. I , N :lJ-t
BLAZE
Construction, Inc.
Construction Managers
General Contractors
October 12,2006
TO: Scott Brewer
City F oresterlEnvironmental Plauncr
One Civic Square
Carmel, IN. 46032
From: Mike J3eesley
Direct - 317.590.4427
E-mail-~ley@BLAZE-inc.com
Project: Founder's Building
2169 Glebe Street
Carmel, IN. 46032
. Attached, please find one copy of the overall site plan from schnieder Engineering
and one copy of the building site plan for your review for the proposed Founder's
Building,
. Your thoughts and comments would be appreciated as we are facilitating
construction permits.
. Thanlc you.
jt!:! . /7, 0 ~
-$t!.o--+f
/(Lv In
X -t.....lkL""( c,j J K~J't' An ,,/ ~rb d.--f -gf'm.!./ic.k.
Th'1. tJ-r.e. P<"t.pt:J>A.;'" i !..t::-nd~",,~ ;:tIa.r>.s, liP- ~.
.b< ' -__..1. '/ .LI ~-I'-I I" f.dilr
i"1~Ir'1l Clp'kc,'r"';,$ cxrof'l"/> ( (H" / I
~ :~h~$ /Z 1t!Y./~"~' ;tf/~Se' 112, fi~ ./'
I) ,.,.,-c, C 11/1 (Ot 0'4 / L /' cffl4' rf
/' / tV "... T~~<:/ ,/?<!!<!' d'
Kl'7tU.J;" f'~V /112C/~ .A ~ &:'6"v~ /~'~er;
f e4/> f-~ ~V..... adA1~ ~ L,
~n1&.Y~.c /~di?7~~ /l~d a ~P-e..
~:J ,//;>t/-' /It~ :Or'''~
10411 N. College Avenue. IudiaDaPO!is, Iudhma 46280 . Phone: (317) 586-1008 . FIlS: (317) 573-5774
I 'd S660'ON
NOlmmNO~ 3ZVl8 WV61:11 900Z 'LI'PO
Page 1 of2
Lillard, Sarah N
From: Lillard, Sarah N
Tuesday, October 10, 2006 11 :02 AM
Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary
R; Redden, Nick; Duffy, John M
Cc: 'beesley@blaze-inc.com'
Subject: RE: Pre-Submittal for The Founders Bldg @ Village of West Clay
Sent:
To:
Michael,
The following requests for copies of certain parts of the approved plan come from members of
our Planning and Zoning office. One copy of each stamped plan is required for submittal for the
building permit. I have also listed another item you should check in to, after the first two items.
1. Please submit four (4) copies of the approved site plan to Scott Brewer, DOCS, One Civic Square, Carmel, IN,
46032. You will be notified when your copies are ready for pickup. Contact: Scott Brewer, City Forester/Environmental
Planner. One Civic Square; Carmel. IN 46032. Phone: (317) 571-2478. FAX (317) 571-2426
2. Please submit three (3) copies of the architectural elevation drawings for the structure to Matt Griffin, DOCS,
One Civic Square, Carmel, IN, 46032. You will be notified when your copies are ready for pickup. Contact: Matt
Griffin, Planning Administrator. One Civic 5quare; Carmel. IN 46032. Phone: (317) 571-2417. FAX (317) 571-2426.
Please comactJohn Duffy of Carmel Utilities regarding the water connection/availability. If a
permit for the water needs to be issued, that will need to be obtained prior to submittal for the
building permit, or at the time of the submittal meeting.
Thank you,
Sarah
-----Original Message-----
From: Lillard, Sarah N
Sent: Monday, October 09,20061:19 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.ln.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R;
Redden, Nick; Duffy, John M
Cc: 'beesley@blaze-inc.com'
Subject: Pre-Submittal for The Founders Bldg @ Village of West Clay
The Dept. of Community Service, Building & Code Enforcement division, has
received a submittal for the purpose of obtaining a building permit for
foundation. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF YOU
HAVE OUTSTANDING ISSUES. After that time, we may proceed with the
meeting and submittal.
1 0/1 0/2006
Page 1 of2
Lillard, Sarah N
From: Ryan Hartman [Ryan.Hartman@CTRWD.ORG]
Sent: Monday, October 09,20066:19 PM
To: Lillard, Sarah N
Subject: RE: Pre-Submittal for The Founders Bldg @ Village of West Clay
Sarah,
I have no issues with The Founders Bldg. except that the original submittal was a plan set which included the
buildings of The Klain Building and Townnhomes. Currently the designer and I are resolving issues we still have
with the Townhomes therefore the plans have not been approved.
Ryan C. Hartman, E.!. T
District Engineer
Clay Township Regional Waste District
10701 N. College Ave., Suite A
Indianapolis, IN 46280-1098
Direct: 317-844-9200
Fax: 317-844-9203
Cell: 317-714-7219
~yan.hartman@ctrwd.org
From: Lillard, Sarah N [mailto:SLillard@carmel.in.gov]
Sent: Monday, October 09,20061:19 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; grh@co.hamilton.in.us; rct@co.hamilton.in.us; Ryan Hartman;
jbt@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John M
Cc: beesley@blaze-inc.com
Subject: Pre-Submittal for The Founders Bldg @ Village of West Clay
The Dept. of Community Service, Building & Code Enforcement division, has
received a submittal for the purpose of obtaining a building permit for foundation.
PLEASE "REPL,.'CTO_ALL" AS SOON AS POSSIBLE. IF YOU HAVE
OUTSTANDING ISSUES. After that time, we may proceed with the meeting and
submittal.
Project:
The FOUNDERS BUILDING
@ the Village of West Clay
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
?????
10/1 0/2006
Page 1 of2
Lillard, Sarah N
From: Hoyt, Gary A
Sent: Monday, October 09,2006 1 :53 PM
To: Lillard, Sarah N
Subject: RE: Pre-Submittal for The Founders Bldg @ Village of West Clay
Sarah,
I have received a variance application from these people requesting a variance
from the state regarding windows in a rated corridor on an exterior wall located
on the property line. Is this something they told you about? There variance will
not come before the Fire and Building Safety Commission until November 2006.
Gary
From: Lillard, Sarah N
Sent: Monday, October 09,20061:19 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org';
'jbt@co.hamllton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John M
Cc: 'beesley@blaze-inc.com'
Subject: Pre-Submittal for The Founders Bldg @ Village of West Clay
The Dept. of Community Service, Building & Code Enforcement division, has
received a submittal for the purpose of obtaining a building permit for foundation.
PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE. IF YOU HAVE
OUTSTANDING ISSUES. After that time, we may proceed with the meeting and
submittal.
Project:
The FOUNDERS BUILDING
@ the Village of West Clay
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
?????
Representative:
Michael Beesley
Blaze Construction, Inc.
beesley@blaze-inc.com
10/9/2006
Lillard. Sarah N
From:
Sent:
To:
Subject:
Greg Hoyes [grh@co.hamilton.in.us]
Monday, October 09,20062:03 PM
Lillard, Sarah N
Re: Pre-Submittal for The Founders Bldg @ Village of West Clay
Sarah
The Hamilton County Surveyors Office has no outstanding issues with the Founders Building.
As with the Klain Building, I still need to review the latest submittal on the overall,
but nothing involved with that will affect this building. If you have any questions,
please let me know.
Greg Hayes
HeBO Plan Reviewer
>>> "Lillard, Sarah N'l <SLillard@carmel.in.gov> 1:19 PM Monday, October
09, 2006 >>>
The Dept. of Community Service, Building & Code Enforcement division, has received a
submittal for the purpose of obtaining a building permit for foundation. PLEASE "REPLY TO
ALL" AS SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After that time, we may proceed
with the meeting and submittal.
Project:
The FOUNDERS BUILDING
@ the Village of West Clay
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
?????
Representative:
Michael Beesley
Blaze Construction, Inc.
beesley@blaze-inc.com
Ph. (317) 590-4427
Again, if there are concerns that might affect the issuance of this permit, please REPLY
TO ALL on this e-mail.
1
Page 1 of 1
Lillard, Sarah N
From: Lillard, Sarah N
Sent: Monday, October 09,2006 1 :19 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary
R; Redden, Nick; Duffy, John M
Cc: 'beesley@blaze-inc.com'
Subject: Pre-Submittal for The Founders Bldg @ Village of West Clay
The Dept. of Community Service, Building & Code Enforcement division, has
received a submittal for the purpose of obtaining a building permit for foundation.
PLEASE "REPLY :rQ-^!"!"" AS SOON AS POSSIBLE, IF YOU HAVE
OUTSTANDING ISSUES. After that time, we may proceed with the meeting and
submittal.
Project:
The FOUNDERS BUILDING
@ the Village of West Clay
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
?????
Representative:
Michael Beesley
Blaze Construction, Inc.
beesley@blaze-inc.com
Ph. (317) 590-4427
Again, if there are concerns that might affect the issuance of this permit,
please REPLY TO ALL on this e-mail.
10/9/2006
10/0g/2006 13:07
31732gS411
RTMCONSULTANTSINC
PAGE 02
Variance Number: (A..igned by Department)
liD.. ~ ,ri
c. Ii
. ..
" . :r.
, I
VARIANCE APPLICA nON
Indiana Deportment of Homeland Security
.Code Services Division
402 West Washington Stteet, W246
(ndian.polis, IN 46204
Date Reoeived (Filled in by Deportment):
PLEASE REFER TO THE INSTRUCTIONS
ATTACH ADDI110NAL PAGES AS NEEDED TO COMPLETE nus APPLICATION
'L APPLICANT INl'ORMA TION (l'etsan who would be iit viol"lon ifvan.noe is not received; usually this is the OWller) -..-
Nal'1\e: George p, Sweet Title: President
Oraaniution Name: Brenwlck Development Corporation Telephone Number: (J 17) 574.J400
, Addre,", 12821 g. New Market St., Suile ZOO
City, C.rmel I State: IN I Zip Cod" 46032
2. PERSON SUBMITnNG APPLICATION ON BEHALF OF THE APPLICANT (if not submitted by.the appllcaut)
Name: Christina M. CQl1ester I P.B. Ttue FifO l'rotectic;m ~sineer
Or,ganization NatTIe:: RTM Consultants, Inc. Telephone Number: (JI7) 329-7700
I AddrelS6: 6640 Parkdale Place. Suite J
-- I State IN I Zip Codt 462.54
City: Indianapolis
3. DESIGN PROFESSION,u, OFBIlCORD (ifapplicabk)
Neme: william A. 8rowne, Jr. I Licen.. Number: AJt.IOSOOI78
Organizalion Name: Ratio Architect.!l Telephone Number: (317) 6J3-4040
Addr"" 107 S. Penn,ylvoni. Street, Suire 100
City: [ndianapOlis: I State: Indiana. T Zip Code: 46204
4. PROJECT IDENTU'IC"nON
Name of Project: Founder's Buildln.e I Project Number: Unfiled
Site Add~!IS: 2169 Glebe Su-eet I Ceunly: Hamilton
City: Carmel I State; Indittntl I Zip Code: 46032
Projoct Type: IillNew o Addition o Alteration o Change of Use o Exis:tlng
5. REQUIRED APDITIONAL INFORMATION
The follow;ng required. information has been included witb thlll application (eheck as applicable):
0 A check made: pa~blo Ie the Indian. Department of Homeland S$Cl,lrity for the appropriate amount (see instruction$)
0 Three (3) sets ot'plans or d{awings and supporting data tha.t de$Cribe the: area. .IIffect~ by the requested vartanee &lid any prQpo~
tltem..tlvc:s.
0 Written dOtumentatiQn $howing that the local fire departmont is Il.watl! orthe nalUre of the variance. This is required iflllC rcqu08tcd
variance il'lvolv~.a fire safety role. I
D Wrilttm documentJtion showina: dlllllhe local building official is aware of the nature of the variance. This is required {fthe requC:9led
vwiaDce invQlve, a project for which pluu and specifications have been. or mUSt be, filed for a design release. or ifit involvC$ a one (1) or
two (2) fimily dwelling.
6. VIOLATION INFORM"tION
Has the Code Services Divlsion Issued'" Correction Order: IZI No DYe, (If Yo" attach a cOpy of the Correction Order)
Has IS Violation been issued: [81 No DYes (If Yes, attach a copy of the Violation and answer the following;)
Violation issued by: o lAool,lluilding Department o County Building Department o Slate Bulldlna: Commissioner
I D Local Fire Department o State Plre Manhal
Page 1 of2
10/09/2006 13:07
3173298411
RTMCONSULTANTSINC
PAGE 03
7.lJESClUPTION OF mE v AJUANCE
Name or Code QI" Standard and Edttlon Involyell I SpedOc Code Section
2003 Indiana Building Code Table 704.8
Nature of NOD~COrrlpllallce (lncfudlnl descrJpdoD Df 'p:lces or .quJpmt:nt la'Volved at nel:t:l5ary)
Windows will be installed in one hour exterior wall located on the property line. The two.story B.Occupancy building is type V
construction.
8. DEMONSTRA nON THAT PUBLIC HEALTH SAFETY AND WELFARli: WlLL BE l'll.orRCTElJ
Selec:t on_ of the. toJlowba& statem.ents:
[J Nonpcompliance with the rule will nor b~ "dversc to the public health, safety or welfare; or
[X] Applicant wUl undmakc altemative action$ in li~ of cotnpliance with rhe role to ensure thtt ~antin8 ofthe variance will not be adverse to
public health, safety or welfue
rllds demonstrating th.t the .tatement ,dtded above Ii true:
The new building and expansion will be protected by . complete .utomat;c sprinkler 'yStem desiened for the hazard present. Buil~ings
on adjacent properties arc also protected by automatic sprinklen;. NFPA 80A - Recommended Practice for Protection of Buildings from
ex.teril)r Fire Exposure States;
-'A.5.6.3 Where the exposing buHdlng is properly protected by automatic sprinkle~, II. fIre in that building i, a.3sumed to be
controlled, and exposure, therefore~ is also assumed to be controlled.
A..5.6.4 Wl)ere t1Je exposed building is properly protected by automatic sprinklers, i,enition within the exposed building is
possible where separation distances are less than those recommended or where means of prottJC:tlon are not provided on expose-d
openin&:s, Willis, or projections with leS5ef sepll('D.t\On distances. Such an ignition, however, is assumed to be controlled by
sprinklers In the exposed structur.....
Closely spaced sprinkle" (6 foot on center) will be provi~ed within 2 feet of the gl..ed openlnas.
9. DEMONSTRA nON OF UNDUE HARDSmr OR H.SrORICALLY SIGNJllICANT STRUCTURE
Sllect at lust OU8 or the fonowtDII .tatemcD1,:
[X] Impo~itiQn Qfthe rule would result in an undue hardship because ofphysiee.llimitatiofllS ()fthe c.onstruetion !:lite ot it;; utility sctvietil
[J ImpositIon oftbe ode WQuld result in an \l1ldue ba.rdsh~p br:cau;e Qfmajor operational problr:rm in the use ofthc: building or strutturc:
(J lmVO'itiou Qfthe Nle would resuh in an undue hiitdlsbip because of excessIve costs Qradditional or altered construotion elements
(J Irnpo,jtiQn oUbe Nle would prevent l.b preservation of a historically significant pert oUht! building or structure
Facts demonltratlnc that the Items nletUid above are true:
The site is limited by property line restrictions. Fire protection provide. equivalent protection.
10. STATEMENT OF ACCURACY
I hereby Slate and aflinn that the ltl.fonnatiQn contained. in this application is accUR.tc::
ferson su.bmltdn: the appUc:aUon 0,. ApplltaQI DdI.n Professional of Record
Signature; Sipature:
Printed Name: _Oln,riul! CoJle,t.et, FE Printed Name William A. Browne,1r,__
ll. SrATEMENT OF AWARENESS
Illr tbe annUcatiod. Is belD" lubmltted on the annlleanu behalf. die aDDllcant lJIu,st $'D'R the (onowlno ltatement\
I hereby state: and affirm that 1 am DWUC ofthill ~uest for variance and that this Jppljcation is being IIIJ.bmitted on my beh.lf.
Siao.turo; Printed Name: GeorgI: P. SWI:Ct
Page 2 of2
10/09/2006 13:07
3173298411
RTMCONSULTANTSINC
PAGE 04
',I
;'p
'6:
. :
i
.
,
. ,1
"'~ Ii
i
.
-+- ~ia
f=' J
~
,
,
,
-'
J'
-1--
"
.
--,
"
,
{
t
::] i .~
"Lr-:::
=
"
:1
I
------->
...'r
. .~. _'!:.!:.._ .,.__ n._
EB
PfI
iii:.',
RATIOAtcl'lIl$eUl.lnc.
100Scll~d.rBllildin;
107 Souttl "enl\:lyN.nI. SIrftt
Indianapgllt,lnGltl\t"G~
311 a1:l40~O
31763J 41$3 FI"
"...CJIICT: ~OUNOI!!R'S8UILDINQ '~'.~,"A_______,._..__.
~~
OWO.lItEF,A-201
CAn: 1QI02JOC 1$e.tU' tla".l'.o'
AOOiNDUI.t:.-- C.C.tI.=----
U.l: _ P'FI':_"'I
PROJ.IrKl.~ ,~, m.cIOTNO.
RATIO
Dl".WNIY; ...ffcB.
C"'liC60RY.:.....-__...
A.201
10/09/2006 13:07
3173298411
RTMCONSULTANTSINC
PAGE 05
,
:
>
>
,
,
,
,
."
i
11
"
j !
,
~'l' .-
:[
l
,
,
,
1
1
u':=ji't' ,...
>
,
,
;
lIl'.tt
.
'"'
, ~U1 i
- -..-.--i- - .,.--.....-.... - 4'
, I
;=,J
~ j
"
'I
i
1
i
I
ow;
""1' "4-
#'.'1'
'f_'
E9
.~
R,ATl()Aftl'ta9(ll$,lnc,
100 S;hrad... Bukl1ng
'107 SoW. PtnnlSylwmle sn.t
~d~nl~,rnd~na4B~
J11 GJJ 4040
~1?S1:l.15:&Fn
1"AOJEc;T: FOUNOflf9 eU1LD1NGl
VI~ OFWI:.sTClAY
DWG.~;A.0201 "_ ...'..______.._
DAn;:: 10J02JOI!i 9CALli:......1!l.':..~....1::9:..,DRAWHII'Y: __'B_,
AOOIONDvtt!:..- 0.(:.0.:.....-- Cl<li~;o .y~._~..... ....
4..t.l.: _ "A.: - I A-201 I
~,NO.:~~ """ITHO. __.
RATIO
10/09/2005 13:07
--~-------_....
3173298411
RTMCONSULTANTSINC
PAGE 01
October 9, 2006
RTM
CONSULTANTS, INC.
Jim Blanchard
Building Inspector
One Civic Square
Carmel, IN 46032
BUILDING COOES
.
FIRE .ROTECTlON
.
AOA
.
JCAHO/CMS/HFAP
Notification of Variance Request
Re: Founder's Building
Dear Mr. Blanchard:
Included with this fax Is a copy of a varianCe application for the above listed projects. Please sign below
verifying the receipt of this epplicatlon. This acknowledgment does not Indicate that you are in favor of or
opposed to the variance, it only indicates that you have received e copy of the variance request which will be
sUbmitted to the Fire Prevenlion and Building Safety Commission for their consideration at the Nov. 08, 2006
hearing.
If you have any questions, plesse contact us.
Very Truly Yours,
RTM Consultants, Inc.
q~~~
~ rvl Christina M Colllester. P .E.
cr ( Fire Protection Engineer
enclosure
-.-.----.--.---------
----
Plaase sign below verifying the receipt of this variance request and fax it bac
the numl'ler listed below at your earliest opportunity.
.'"..~ 'Lrj, Jt)M/~~
Date~
RIM CONSULTANTS, INC. . 0640 PAAKOAl! PLACE, sum: J . INOIANAPOUS. IN A6254-4698