Loading...
HomeMy WebLinkAboutL-401 Grading Plan - Phase IIIXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXX XX X XX X XXX XXX XXX XX X XX X XX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X XXX XX X XX X XXX XXX XXX XX X XX X XX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X XXX XX X XX X XXX XXX XXX XX X XX X XX XXXXXXXXXXXXXXFFE =862.401.50%1.05%1.50%FFE =862.401.50%1.50%1.50%FFE =862.401.90%2.65%2.65%FFE =862.401.90%1.50%3.18%FFE =862.40FFE =862.401.90%1.90%1.90%1.90%1.90%4.00%FFE =862.00FFE =862.001.17%1.00%1.64% 2.00% 1.64% 1.42%1.00%7.80%1.39%7.80% 1.50% 1.25%1.25%1.90% 1.25% 2.90%1.90%1.75%3.50%1.90%1.90%1.90%861.13 TP/ME861.96 TC861.46 BC/ME861.23 TP/ME862.11 TP862.38 TP862.27 TP862.40 TC862.07 BC862.38 TP862.40 TC862.07 BC862.44 TC862.11 BC861.85 TC861.35 BC/ME861.85 TC861.35 BC/ME861.85 TC861.35 BC/ME860.78 RIM860.98 RIM862.38 TP862.64 TC862.31 BC862.53 TC862.20 BC862.38 TP862.53 TC862.20 BC862.03 TC861.53 BC862.40 TC862.07 BC861.02 TP861.02 TP862.38 TP861.97 TC861.64 BC860.98 RIM861.53 TR862.17 TC861.84 BC862.35 TC862.02 BC862.35 TC862.02 BC862.26 TP861.47 TP861.18 RIM859.66 RIM861.70 RIM862.53 TC862.20 BC862.38 TP862.38 TP862.38 TP862.38 TP857.34 RIM860.58 RIM858.75 RIM862.38 TP862.38 TP862.09 TP861.83 TP861.32 TP859.98 BS860.70 TP861.40 TP862.04 TC861.71 BC862.23 TC861.90 BC861.11 TC860.78 BC861.33 TP861.38 TP864863862861 862863 861862862.10 RIM861.98 TP861.98 TP862.48 TC861.98 BC861.40 TP861.88 TP861.88 TP861.60 TC861.10 BC861.22 TP861.94 TC861.61 BC862.22 TC861.89 BC861.39 TP2% MAXCROSS SLOPE862.38 TP862.03 TC861.53 BC/ME862.13 TP862.02 TP861.97 TC861.41 BC/ME862.35 TC862.02 BC861.97 TC861.47 BC/ME862.38 TP862.12 TP862.38 TP861.95 TP861.94 TC861.61 BC861.85 TC861.52 BC860.93 BR861.82 TP861.97 TC860.96 BC862.38 TP862.23 TP862.22 TP861.75 TP861.12 TP861.82 TP861.93 TP862.38 TP861.71 TP862.38 TP861.83 TP861.48 TS861.48 TS859.98 BS862.38 TP861.95 TP861.89 TP861.81 TP861.69 TC/TW861.36 BC/BW862.54 TC862.21 BC862.39 TC862.06 BC861.46 TP861.02 TC860.69 BC861.00 TP861.00 TP862.50 TW860.50 BW862.50 TW860.50 BW860.92 TP860.83 TP861.15 EG859.61 EG858.43 EG858.08 EG857.83 EG857.69 EG858.11 EG858.03 EG862.14 TR861.64 BR862.40 TC862.07 BC862.03 TC861.53 BC857.13 RIM861 862 861 862 863860859858 858862 859860 862.49 TC862.16 BC862.40 TC862.07 BC861.95 TC861.45 BC/ME862.14 TC861.64 BC/ME862.03 TC861.53 BC/ME862.20 TP864861861862863860859 858863864865866 862.00 TC861.50 BC/ME862.10 TC861.60 BC/ME860.01 ME862.10 TC861.60 BC/ME860.86 TP861.05 TP860.92 TP860.72 TP861.28 TC/TW860.95 BC/BW861.31 TC860.98 BC861.13 TC861.87 BC861.29 TC860.96 BC864860 861.77 TP862.09 TP861.99 TP861.88 TP861.82 TP861.69 TP861.76 TC861.43 BC861.82 TP861.53 TC/TW861.20 BC/BW861.41 TP860.95 TC/TW860.62 BC/BW861.13 TC860.80 BC861.35 TC861.02 BC861.45 TP861.07 TP861.00 TP861.98 TP858.00 RIM860.50 RIM861.58 TP861.77 TP1.00%1.00%860.48 RIM860.48 RIM860.48 RIM860.81 TP862.33 TC862.00 BC861.12 TP860.99 TP860.48 RIM860.48 RIM861.33 TP862.38 TP861.47 TP860.95 TP859.21 ME859.90 TP860.35 TP860.02 TP860.75 HP861.77 TC861.44 BC861.50 TC861.17 BC861.60 TC861.27 BC861.64 TC861.14 BC/ME862.00 TC861.67 BC862.10 TC861.77 BC861.78 TP861.93 TPSCALE010'20'40'A1L-401GRADING PLAN - PHASE IIIOwnerMechanical / Electrical / Plumbing EngineerCivil EngineerArchitect / Landscape Architect101 South Pennsylvania StreetIndianapolis, Indiana 46204317-633-4040RATIO30 S. Meridian Street, #1100Indianapolis, Indiana 46204Kite Realty GroupRepublic AirwaysHeadquarters12201 N. Meridian St.Carmel, Indiana 46032Structural Engineer1717 E 116th Street, Suite 200Carmel, Indiana 46032317-580-0402McComas/O'donnell Naccarato22014.0009229 Delegates Row, Suite 150Indianapolis, Indiana 46240317-781-6200Circle Design Group250 East 96th Street, Suite 580Indianapolis, Indiana 46240Kimley Horn8909 Purdue Road, Suite 300Indianapolis, Indiana 46268Republic Airways Holdings815 East 65th Street, #200Indianapolis, Indiana 46220Pure DevelopmentGRADING PLAN -PHASE IIINOTE:REFER TO A1/L-402FOR CONTINUATION.PHASE 1 LIMITSSCOPE LIMITSGENERAL NOTES | GRADING PLANS:A5L-7031.WORK SHOWN ON THE DRAWINGS SHALL BE BASE BID UNLESS SPECIFICALLY NOTED TO BE BY ALTERNATE BID.2.COORDINATE ALL WORK WITH OTHER DESIGN DISCIPLINES.3.CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL DIMENSIONS AND FIELD CONDITIONS PRIOR TOSTARTING WORK. CONTRACTOR IS RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF CONTRACTOR FINDS ANYDISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND ACTUAL FIELD DIMENSIONS OR CONDITIONS,CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT IMMEDIATELY.4.PARTICIPATE IN THE PRE-INSTALLATION CONFERENCE FOR THE GRADING AND DRAINAGE SCOPE OF THEWORK, ACCORDING TO THE PROJECT SPECIFICATIONS, PRIOR TO COMMENCEMENT.5.EXISTING AND PROPOSED UTILITIES THAT ARE SHOWN ARE FOR REFERENCE ONLY. REFER TO THE SITESURVEY FOR EXISTING UTILITIES AND VERIFY ALL IN THE FIELD. REFER TO AND COORDINATE WITH DRAWINGSPREPARED BY OTHER DESIGN DISCIPLINES FOR ALL PROPOSED UTILITIES.6.TYPICAL MAXIMUM SIDEWALK CROSS SLOPES ARE 2% (1/4" PER 1'-0"). TYPICAL MAXIMUM SIDEWALK RUNNINGSLOPES ARE 5% (1'-0" PER 20'-0").7.WHERE NEW PAVED SURFACES ADJOIN EXISTING PAVED SURFACES, MEET EXISTING GRADE.8.DRAINAGE DESIGN SHOWN IS CONCEPTUAL. PLEASE SEE CIVIL DRAWINGS FOR MORE COMPLETE ANDDETAILED STORMWATER DRAINAGE DESIGN.9.PROPOSED SPOT ELEVATIONS ARE FINAL PAVEMENT OR FINAL GRADE ELEVATIONS. REFER TO APPROPRIATEDETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH PAVEMENT OR GRADE ELEVATIONS INDICATED.10.CURB RAMPS SHALL COMPLY WITH CURB RAMP DRAWING INDEX & GENERAL NOTES (REF: ).11.SPOT ELEVATIONS ARE DENOTED AS FOLLOWS:SPOT ELEVATION - EXISTING:SPOT ELEVATION - PROPOSED:12.SPOT ELEVATION ABBREVIATIONS ARE DEFINED AS FOLLOWS:BC = BOTTOM OF CURBBR = BOTTOM OF RAMPBS = BOTTOM OF STAIRBW = BOTTOM OF WALLFG = FINISH GRADERIM = TOP OF CASTINGTC = TOP OF CURBTEP = TOP OF EQUIPMENT PADTP = TOP OF PAVINGTR = TOP OF RAMPTS = TOP OF STAIRTSC = TOP OF STONE CURBTW = TOP OF WALL000.00 TP000.00 TPR.O.W.R.O.W.PROPOSEDGARAGEPROPOSEDHEADQUARTERSF.F.E. = 862.40F.F.E. = 862.00EXISTINGTRAINING CENTERF.F.E. = 862.40FUTURE R.O.W.FUTURE R.O.W.FUTURE R.O.W.FUTURE R.O.W. FUTURE R.O.W.FUTURE R.O.W.PROPERTY LINE2COPYRIGHT NOTICE: THIS ARCHITECTURALAND ENGINEERING DRAWING IS GIVEN INCONFIDENCE AND SHALL BE USED ONLYPURSUANT TO THE AGREEMENT WITH RATIO.NO OTHER USE, DISSEMINATION ORDUPLICATION MAY BE MADE WITHOUT PRIORWRITTEN CONSENT OF RATIO. ALL COMMONLAW RIGHTS OF COPYRIGHT AND OTHERWISEARE HEREBY SPECIFICALLY RESERVED.SHEET TITLESHEET NUMBERSHEET ISSUENPROJECT NO.SEAL | DATEL-4011ADLS SUBMISSION10/17/232CITY COMMENTS12/08/232