Loading...
HomeMy WebLinkAboutDrainage Report Stormwater Calculations Harvest Church – Phase 2 City of Carmel Hamilton County, Indiana Prepared: October 18, 2023 By: CrossRoad Engineers, PC 115 N. 17th Ave. Beech Grove, IN 46107 Phone No.: (317) 780-1555 Email: info@crossroadengineers.com Table of Contents Section 1: Stormwater Calculations Summary  Pre-Development Conditions ......................................................................... 1  Post-Development Conditions ........................................................................ 1  Exhibits • Exhibit 1: Location Map ....................................................................... 2 • Exhibit 2: Pre-Development Watershed Map ....................................... 3 • Exhibit 3: Post-Development Watershed Map ..................................... 4 Section 2: Hydrologic Modeling Calculations  Runoff Curve Number Calculations • Post-Development Conditions .............................................................. 5 • Legacy PUD, Stormwater Development Checklist ............................... 6 • Pre & Post Flood Hydrographs ....................................................... 7-8 • Pre & Post Time of Concentration Worksheets .............................. 9-10 Section 1: Stormwater Calculations Summary Pre-Development Conditions The subject site is a portion of an overall ±17.78 acre parcel located on the west side of River Road approximately 1,300 feet south of the 146th Street & River Road intersection in the City of Carmel (see Exhibit 1: Location Map). This phase of development shall consist of ±6.84 acres within the aforementioned overall parcel. In addition, this land is all located within the Legacy Development. The Legacy development shall provide all necessary storm water detention and water quality for the Harvest Church property. The pre-development land use consists of two (2) existing structures, parking lot, and concrete walks that were developed in the first phase of construction. The area that will be improved within this phase primarily consists of grass. Existing runoff is mainly conveyed westerly to the Legacy development, where it eventually flows into the West Fork of the White River (see Exhibit 2: Pre-Development Watershed Map). The project site lies within Zone X, per Community Panel 18057 C 0231 G of the Flood Insurance Rate Map of Hamilton County, dated November 19, 2014. No wetland areas lie within the project limits per the National Wetlands Inventory Map. Post-Development Conditions The improvements include a ±32,000 square foot building expansion, that will connect the two (2) existing structures and create one larger building. Additionally, a parking lot and concrete walk areas shall be constructed for the proposed development (see Exhibit 3: Post-Development Watershed Map). Runoff shall be conveyed via sheet flow to the western side of the property where it will be collected and routed through a porous asphalt system. The runoff shall then be discharged into the existing detention/BMP facilities within the Legacy development, where it shall be treated for water quantity and quality. It is not anticipated to construct any onsite detention or water quality facilities as the proposed site was master planned within the Legacy development. The Legacy report identifies the subject site as Basin 700 with an anticipated curve number of 94. The comparison of the actual developed curve number to the Legacy design curve number shall be discussed later in this report. EXHIBIT #1 LOCATION MAP NORTHPHASE 2 AREA PHASE 1 AREA Tract A N32°37'45"E 270.95'L8L9L10N30°42'26"E 452.03'L1 L2L3 C1S21°48'03"W 191.51'L4 S21°14'47"W 288.92'PHASE 2 BASIN A=6.84 ac. CN=76 NORTHEXHIBIT 2: PRE DEVELOPMENT WATERSHED MAP N32°37'45"E 270.95'L8L9L10N30°42'26"E 452.03'L1 L2L3 C1S21°48'03"W 191.51'L4 S21°14'47"W 288.92'PHASE 2 BASIN A=6.84 ac. CN=89 NORTHEXHIBIT 3: POST DEVELOPMENT WATERSHED MAP Section 2: Hydrologic Modeling Calculations Detention and water quality requirements for the Harvest Bible project have been met with the implementation of the detention facilities within the Legacy development. In order to ensure the proposed development does not produce a runoff greater than what was anticipated in the previously approved Legacy stormwater calculations, it shall be demonstrated that the proposed curve number is less than or equal to the anticipated curve number. Runoff Curve Number Calculations Curve numbers were computed based on the applicable land use and Soil Hydrologic Group B soils for pre-development conditions. For post-development conditions, Soil Hydrologic Group C soils were used to compute curve numbers in accordance with the City of Carmel Stormwater Management Ordinance. Post-Development Conditions Table 1 Post-Development Runoff Curve Number Calculations Phase 2 Watershed Land Use Description Runoff Curve No. For Hydrologic Group – B Runoff Curve No. For Hydrologic Group – C Average Runoff Curve Number Roof - 98 98 Pavement - 98 98 Grass (Good Condition) - 74 74 Table 2 Post-Development Weighted Curve Number Calculations Phase 2 Watershed Land Use Description Land Use Curve Number Land Use Area Percentage of Total Area Weighted Curve Number Impervious 98 4.309 ac. 63.00% 61.74 Grass (Good Condition) 74 2.531 ac. 37.00% 27.38 Total 6.840 ac. 89.12 ≈ 89 Anticipated Legacy Basin 700 Curve Number: 94 – Commercial Calculated Harvest Bible Phase 1 Curve Number: 89 < 94 The weighted curve number is less than the anticipated curve number; therefore, detention and water quality capacities provided by the Legacy infrastructure are adequate. The following sheets are the Legacy PUD, Stormwater Development Checklist and supporting hydrograph information, confirming that the proposed improvements are in compliance with the Legacy detention and water quality design. HARVEST CHURCH HARVEST BIBLE CHAPEL OF NORTH INDIANAPOLIS, INC. 14550 RIVER ROAD, CARMEL, IN 46033 CROSSROAD ENGINEERS, P.C. 115 N. 17th AVE., BEECH GROVE, IN 46107 BAS 700 DD10 EAST 94 89 85%63%10 min.13.3 min. 91,514 132,684 41,170 65,872 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Tuesday, 10 / 17 / 2023 Hyd. No. 1 PRE PH2 100yr-24hr Hydrograph type = SCS Runoff Peak discharge = 32.60 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 91,514 cuft Drainage area = 6.840 ac Curve number = 76* Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 13.95 min Total precip.= 6.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.592 x 98) + (6.247 x 74)] / 6.840 1 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (min) PRE PH2 100yr-24hr Hyd. No. 1 -- 100 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Tuesday, 10 / 17 / 2023 Hyd. No. 2 POST PH2 100yr-24hr Hydrograph type = SCS Runoff Peak discharge = 48.61 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 132,684 cuft Drainage area = 6.840 ac Curve number = 89* Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 13.28 min Total precip.= 6.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.309 x 98) + (2.531 x 74)] / 6.840 2 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (min) POST PH2 100yr-24hr Hyd. No. 2 -- 100 Year Hyd No. 2 Project:Harvest Church Designer:DJM Date:10/17/2023 Scenario/Structure:Pre TC - Phase 2 Sheet Flow 1.Surface Description grass pvmt grass 2.Manning's Roughness Coeff., (n)0.170 0.011 0.170 3.Flow Length, (L) **total L<= 100 ft 100.00 ft.0.00 ft.0.00 ft. 4.Two-yr 24-hr Rainfall, (P2)2.64 in.2.64 in.2.64 in. 5.Land Slope, (s)0.0186 ft./ft.0.0090 ft./ft.0.0851 ft./ft. 6.Travel Time, (Tt)0.205 hr +0.000 hr +0.000 hr (Tt = [0.007(nL)^0.8]/[P2^0.5*s^0.4]) Shallow Concentrated Flow 7.Surface Description paved unpaved unpaved (paved or unpaved) 8.Flow Length, (L)0.00 ft.221.76 ft.0.00 ft. 9.Watercourse Slope, (s)0.0090 ft./ft.0.0186 ft./ft.0.0387 ft./ft. 10.Average Velocity, (V)1.929 ft./s 2.200 ft./s 3.174 ft./s Watershed or (Vp = 20.3282(s)^0.5)Subarea Tc or Tt = (Vup = 16.1345(s)^0.5)0.233 hr or 11.Travel Time, (Tt)0.000 hr +0.028 hr +0.000 hr 13.95 min (Tt = L/3600V) Channel Flow 12.Cross Sectional Flow Area, (a)133.48 ft.^2 132.12 ft.^2 174.24 ft.^2 13.Wetted Perimeter, Pw 35.51 ft.30.71 ft.43.74 ft. 14.Hydraulic Radius, (r)3.759 ft.4.302 ft.3.984 ft. ( r = a/Pw) 15.Channel Slope, (s)0.0175 ft./ft.0.0121 ft./ft.0.0084 ft./ft. 16.Manning's Roughness Coeff., (n)0.027 0.027 0.027 17.Velocity, (V)17.727 ft./s 16.136 ft./s 12.769 ft./s (V = [1.49*r^0.67*s^0.5]/n) 18.Flow Length, (L)0.00 ft.0.00 ft.0.00 ft. 19.Travel Time, (Tt)0.000 hr +0.000 hr +0.000 hr (Tt = L/3600V) TIME OF CONCENTRATION or TRAVEL TIME WORKSHEET Project:Harvest Church Designer:DJM Date:10/17/2023 Scenario/Structure:Post TC - Phase 2 Sheet Flow 1.Surface Description grass pvmt grass 2.Manning's Roughness Coeff., (n)0.170 0.011 0.170 3.Flow Length, (L) **total L<= 100 ft 70.22 ft.29.78 ft.0.00 ft. 4.Two-yr 24-hr Rainfall, (P2)2.64 in.2.64 in.2.64 in. 5.Land Slope, (s)0.0149 ft./ft.0.0098 ft./ft.0.0851 ft./ft. 6.Travel Time, (Tt)0.168 hr +0.011 hr +0.000 hr (Tt = [0.007(nL)^0.8]/[P2^0.5*s^0.4]) Shallow Concentrated Flow 7.Surface Description paved unpaved unpaved (paved or unpaved) 8.Flow Length, (L)302.16 ft.0.00 ft.0.00 ft. 9.Watercourse Slope, (s)0.0098 ft./ft.0.0265 ft./ft.0.0387 ft./ft. 10.Average Velocity, (V)2.012 ft./s 2.627 ft./s 3.174 ft./s Watershed or (Vp = 20.3282(s)^0.5)Subarea Tc or Tt = (Vup = 16.1345(s)^0.5)0.221 hr or 11.Travel Time, (Tt)0.042 hr +0.000 hr +0.000 hr 13.28 min (Tt = L/3600V) Channel Flow 12.Cross Sectional Flow Area, (a)0.79 ft.^2 132.12 ft.^2 174.24 ft.^2 13.Wetted Perimeter, Pw 3.14 ft.30.71 ft.43.74 ft. 14.Hydraulic Radius, (r)0.250 ft.4.302 ft.3.984 ft. ( r = a/Pw) 15.Channel Slope, (s)0.0048 ft./ft.0.0121 ft./ft.0.0084 ft./ft. 16.Manning's Roughness Coeff., (n)0.012 0.027 0.027 17.Velocity, (V)3.397 ft./s 16.136 ft./s 12.769 ft./s (V = [1.49*r^0.67*s^0.5]/n) 18.Flow Length, (L)0.00 ft.0.00 ft.0.00 ft. 19.Travel Time, (Tt)0.000 hr +0.000 hr +0.000 hr (Tt = L/3600V) TIME OF CONCENTRATION or TRAVEL TIME WORKSHEET