1 1 Addressing
Dave McCoy
8/21/23 1:36 PM
Comment
MIdwest Eye Institute address will be 11220 Illinois St, Carmel, IN 46032 and
"Future Building" to the west will be 11275 Slade Ave, Carmel, IN 46032.
Please contact me with questions.
Info Only
2 1 Urban Forestry
Daren Mindham
8/22/23 4:01 PM
Changemark
PUD Sec 7.6.B
Please show a 5' minimum planting strip with landscaping along all sides of
the parking lot. I recommend removing the on-street parking for a planting
strip.
L101 LANDSCAPE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:18 AM
On street parking and internal drive has been removed.
Resolved
3 1 Urban Forestry
Daren Mindham
8/22/23 4:01 PM
Changemark
screening
Please add more 4 more PF for screening along the east side of this
structure.
L101 LANDSCAPE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:18 AM
Landscaping has been updated according to new site
plan.
Resolved
4 1 Urban Forestry
Daren Mindham
8/22/23 4:01 PM
Changemark
street trees
Street trees are supposed to be large growing shade trees. Please replace
these SR with a combination of at least two different tree species either in
groups or alternating. Please select from swamp white oak, chinkapin oak,
hybrid elm or honeylocust.
L101 LANDSCAPE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:18 AM
This has been updated.
Resolved
5 1 Urban Forestry
Daren Mindham
8/22/23 4:01 PM
Changemark
Illinois St perimeter bufferyard
Please show 30 trees per PUD 7.3.D. 19 street trees, 2 ornamentals and 1
shade trees (I don't see which one this is, please let me know) are shown.
Please provide 8 additional ornamental trees. I would recommend Japanese
tree lilacs east of the building and in the SE corner adjacent to the parking
lot.
L101 LANDSCAPE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:19 AM
Landscaping has been updated according to new site
plan.
Resolved
6 1 Urban Forestry
Daren Mindham
8/22/23 4:08 PM
Changemark
delete wording
Carmel requires all of the wire basket to be removed. Please revise this
wording.
L110 LANDSCAPE DETAILS.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:19 AM
Wording has been revised.
Resolved
7 1 Urban Forestry
Daren Mindham
8/22/23 4:08 PM
Changemark
delete wording 2
Carmel required the entire wire basket to be removed, please revise wording.
L110 LANDSCAPE DETAILS.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:19 AM
Wording has been revised.
Resolved
8 1 Urban Forestry
Daren Mindham
8/22/23 4:08 PM
Changemark
deleted wording 3
Carmel requires the entire wire basket to be removed, please revise wording.
L110 LANDSCAPE DETAILS.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:19 AM
Wording has been revised.
Resolved
REVIEW COMMENTS
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
9 1 Urban Forestry
Daren Mindham
8/22/23 4:13 PM
Changemark
screen transformer
Please screen transformer from Illinois St as possible.
L101 LANDSCAPE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:20 AM
Landscaping has been updated according to new site
plan.
Resolved
10 1 Planning & Zoning
Rachel Keesling
8/28/23 12:49 PM
Library Comment
Submit a copy of the Adjoining Property Owners List from Hamilton County.
Responsed by: Kylie Bright-Schuler - 10/13/23 10:20 AM
A copy has been submitted.
Resolved
11 1 Planning & Zoning
Rachel Keesling
8/28/23 12:49 PM
Library Comment
Provide the filled out and notarized affidavit of notice of public hearing page
of the application.
Reviewer Response: Rachel Keesling - 11/15/23 1:04 PM
Thank you!
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 11/8/23 8:32 AM
This has been provided. Apologies for the delay.
----------------------------------------------------------
Reviewer Response: Rachel Keesling - 10/19/23 12:05
PM
I did not see this page uploaded into the public notice
folder.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 10:21 AM
The requested form has been submitted.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
12 1 Planning & Zoning
Rachel Keesling
8/28/23 12:49 PM
Library Comment
Provide the filled out Notice of Public Hearing page of the application.
Reviewer Response: Rachel Keesling - 11/15/23 1:04 PM
Thank you
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 11/8/23 8:32 AM
This has been provided. Apologies for the delay.
----------------------------------------------------------
Reviewer Response: Rachel Keesling - 10/19/23 12:05
PM
I did not see this page uploaded into the public notice
folder.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 10:21 AM
The requested form has been submitted.
Resolved
13 1 Planning & Zoning
Rachel Keesling
8/28/23 12:49 PM
Library Comment
Submit Proof of Publication from the newspaper.
Responsed by: Kylie Bright-Schuler - 10/13/23 11:22 AM
Proof of publication has been submitted.
Resolved
14 1 Planning & Zoning
Rachel Keesling
8/28/23 12:49 PM
Library Comment
Submit Certificate of Mailing for proof of mailing.
Responsed by: Kylie Bright-Schuler - 10/13/23 10:22 AM
The requested form has been submitted.
Resolved
15 1 Planning & Zoning
Rachel Keesling
8/28/23 12:49 PM
Library Comment
Submit a copy of the Sign Affidavit.
Responsed by: Kylie Bright-Schuler - 10/13/23 10:22 AM
The requested form has been submitted.
Resolved
16 1 Planning & Zoning
Rachel Keesling
8/28/23 1:06 PM
Library Comment
Please provide a roof plan to show where HVAC equipment will be placed.
Responsed by: Kylie Bright-Schuler - 10/13/23 10:22 AM
A roof plan has been provided.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
17 1 Planning & Zoning
Rachel Keesling
8/28/23 1:06 PM
Library Comment
Please provide architectural elevations of the proposed dumpster enclosure.
They must be architecturally compatible with the primary building.
Reviewer Response: Rachel Keesling - 11/15/23 1:05 PM
Thank you!
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 11/13/23 4:10 PM
Proposed dumpster enclosure has been provided.
----------------------------------------------------------
Reviewer Response: Rachel Keesling - 10/19/23 12:03
PM
Please upload these into project dox. I believe they were
recently provided via info packet for the Plan
Commission meeting.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 10:22 AM
Architectural elevations have been provided.
Resolved
18 1 Planning & Zoning
Rachel Keesling
8/28/23 1:08 PM
Library Comment
Please label the required half right-of-way per the Carmel Thoroughfare Plan.
Responsed by: Kylie Bright-Schuler - 10/13/23 10:28 AM
The half ROW has been labeled.
Resolved
19 1 Planning & Zoning
Rachel Keesling
8/28/23 1:08 PM
Library Comment
Please submit an exhibit of the proposed black lined site plan overlaid upon
a current aerial photo of the immediate area.
Responsed by: Kylie Bright-Schuler - 10/13/23 10:28 AM
An exhibit has been provided.
Resolved
20 1 Planning & Zoning
Rachel Keesling
8/28/23 1:11 PM
Changemark
Docket Number
Please update the docket number on the title page - PZ-2023-00189
DP/ADLS.
C001 TITLE SHEET.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:29 AM
The docket number has been updated.
Resolved
21 1 Planning & Zoning
Rachel Keesling
8/28/23 1:39 PM
Changemark
Add sidewalk
Please add a sidewalk to the north end of this project limits, so that both
sides of the main street through the site have sidewalks.
C201 SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:29 AM
The site plan has been updated.
Resolved
22 1 Planning & Zoning
Rachel Keesling
8/28/23 1:39 PM
Changemark
Remove parallel parking
Please remove the parallel parking along this interior drive and replace with
landscaping.
C201 SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:29 AM
The parallel parking has been updated.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
23 1 Planning & Zoning
Rachel Keesling
8/28/23 1:39 PM
Changemark
Pedestrian connection through site
Please work to map out where the sidewalk connection to the front door will
be located. It would be nice to see it line up with the proposed walk to the
MEI building as it is generally centrally located through this half of the site.
C201 SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:36 AM
The site plan has been updated.
Resolved
24 1 Planning & Zoning
Rachel Keesling
8/28/23 1:39 PM
Changemark
Drive up/drop off area?
If this is a proposed drive up/drop off area for the phase 3 building, we are
not in favor of this at this location. It is too close to the intersection and
could cause back up into the through street. Please relocate.
C201 SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:36 AM
Phase 3 is not shown for this submittal as the site has
not been fully designed.
Info Only
25 1 Planning & Zoning
Rachel Keesling
8/28/23 1:39 PM
Changemark
Lot coverage percent
Please add the lot coverage percent to this chart.
C201 SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:36 AM
Lot coverage has been added to the site plan.
Resolved
26 1 Planning & Zoning
Rachel Keesling
8/28/23 1:39 PM
Changemark
Required parking count per phase
Please add the amount of required parking for this office use and the
proposed office use in phase 3 per the PUD. (1 per 300 sq. ft.)
C201 SITE PLAN.pdf Reviewer Response: Rachel Keesling - 11/15/23 1:08 PM
Thank you for adding these details!
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 11/8/23 8:33 AM
Phase 3 parking has been updated in the table.
----------------------------------------------------------
Reviewer Response: Rachel Keesling - 10/19/23 12:03
PM
Parking counts have been revised, but the required
amount is not listed. Please add that too.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 10:37 AM
Parking counts have been updated.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
27 1 Planning & Zoning
Rachel Keesling
8/28/23 1:39 PM
Changemark
Bike parking
Please add the required number and proposed number of bike parking
spaces to this chart.
C201 SITE PLAN.pdf Reviewer Response: Rachel Keesling - 11/15/23 1:08 PM
Thank you
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 11/8/23 8:34 AM
Phase 3 bike parking has been updated in the table.
----------------------------------------------------------
Reviewer Response: Rachel Keesling - 10/19/23 12:03
PM
Please add the required number of bike parking spaces
to the list as well.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 10:38 AM
Bike parking has been added to the site plan.
Resolved
28 1 Planning & Zoning
Rachel Keesling
8/28/23 1:39 PM
Changemark
Add crosswalk?
Is it possible to add a crosswalk at this location too?
C201 SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:38 AM
The site plan has been updated.
Resolved
29 1 Planning & Zoning
Rachel Keesling
8/28/23 1:39 PM
Changemark
Gathering space?
Could this area become a gathering space or amenity area? Perhaps with
benches or a small water fountain? Tables? It seems big enough that it could
be utilized for more than just landscaping.
C201 SITE PLAN.pdf Reviewer Response: Rachel Keesling - 11/15/23 1:09 PM
Comment is no longer relevant for this part of the site.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 11/8/23 8:34 AM
New elevations and site plan have been uploaded.
----------------------------------------------------------
Reviewer Response: Rachel Keesling - 10/19/23 12:04
PM
Please upload new site plans and elevations of this
amenity area.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 10:38 AM
The site plan has been updated.
Resolved
30 1 Planning & Zoning
Rachel Keesling
8/28/23 1:39 PM
Changemark
Planting area to be reduced
It appears this planting island could be reduced in size in order to give more
room to the north end of the site so that a sidewalk can be installed.
C201 SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:38 AM
The site plan has been updated.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
31 1 Planning & Zoning
Rachel Keesling
8/28/23 1:39 PM
Changemark
Sidewalk access to dumpster
Please provide better pedestrian access to the dumpster area.
C201 SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:38 AM
The site plan has been updated.
Resolved
32 1 Planning & Zoning
Rachel Keesling
8/28/23 1:53 PM
Changemark
Remove layers
Please remove layers from these plans such as underground detention,
utilities, etc. that clutter the photometric numbers and make them hard to
read.
E101 SITE LIGHTING PHOTOMETRIC
PLAN.pdf
Responsed by: Kylie Bright-Schuler - 10/13/23 10:38 AM
The photometric plan has been updated.
Resolved
33 1 Planning & Zoning
Rachel Keesling
8/28/23 1:53 PM
Changemark
Photometrics to property line
Please make sure there is a clear line/call out of the photometric levels at the
property line. 0.3 is the maximum footcandle amount allowed.
E101 SITE LIGHTING PHOTOMETRIC
PLAN.pdf
Responsed by: Kylie Bright-Schuler - 10/13/23 10:38 AM
The photometric plan has been updated.
Resolved
34 1 Planning & Zoning
Rachel Keesling
8/28/23 3:01 PM
Changemark
Material?
What material is this area of the building? Please provide more details.
A001 ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/15/23 1:09 PM
Thank you for the explanation.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 11/14/23 1:49 PM
Metal wall material is a continuation of the curtain wall
system intended to serve as a transition to the adjacent
masonry.
----------------------------------------------------------
Reviewer Response: Rachel Keesling - 10/19/23 3:13 PM
Is this considered a siding material? Or part of the
curtain wall/window system?
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 10:40 AM
This is a horizontal metal plank that will coordinate with
the screen wall material above at the roof level.
Resolved
35 1 Planning & Zoning
Rachel Keesling
8/28/23 3:01 PM
Changemark
Sign Band dimensions
Please provide detailed elevations with dimensions for any proposed
signage.
A001 ELEVATIONS.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:40 AM
Signage design and dimensions will be part of a
separate submittal.
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
36 1 Planning & Zoning
Rachel Keesling
8/28/23 3:01 PM
Changemark
Tower trim cap/cornice detail
Please make sure each of the stone towers are finished with the same size of
cap/level of detail.
A001 ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 10/19/23 3:14 PM
Thank you.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 10:42 AM
Wall cap will be consistent at towers.
Resolved
37 1 Planning & Zoning
Rachel Keesling
8/28/23 3:01 PM
Changemark
Metal panel design
What kind of reveals/joints will there be in this metal panel system? How will
they line up with adjacent windows and building accents?
A001 ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 10/19/23 3:14 PM
Thank you.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 10:42 AM
This will be a horizontal panel system with alignment at
the top of windows.
Resolved
38 1 Planning & Zoning
Rachel Keesling
8/28/23 3:01 PM
Changemark
Canopy support designs
Please enhance the design of the canopy supports to have more detailing. It
doesn't have to match the first building exactly, but it could use a little more
attention to detail. I included an image from the PUD character imagery as
potential inspiration to the left of the original MOB building's image.
A001 ELEVATIONS.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:42 AM
Columns of the canopy have additional detail added
with stone accents.
Resolved
39 1 Planning & Zoning
Rachel Keesling
8/28/23 3:01 PM
Changemark
Canopy width
What is the difference between the canopy width shown for the first building
versus this one? Was it a deliberate decision to be different? Please provide
additional info.
A001 ELEVATIONS.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:42 AM
Canopy has been adjusted to provide a partially covered
drop-off.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
40 1 Planning & Zoning
Rachel Keesling
8/28/23 3:01 PM
Changemark
Base material?
What is this material?
A001 ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/15/23 1:10 PM
Thank you for the explanation.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 11/14/23 1:49 PM
Metal wall material is a continuation of the curtain wall
system intended to serve as a transition to the adjacent
masonry.
----------------------------------------------------------
Reviewer Response: Rachel Keesling - 10/19/23 3:14 PM
Is this considered a siding material? Or part of the
curtain wall/window system?
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 10:42 AM
Base material at windows will be metal panel containing
reveals to align with the window framing above.
Resolved
41 1 Planning & Zoning
Rachel Keesling
8/28/23 3:01 PM
Changemark
Brick color
Will the brick color of this building be the exact same as the first MOB? Have
you thought of using something different to provide more visual interest and
variation?
A001 ELEVATIONS.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:42 AM
A secondary/accent brick color has been included along
with changing the base brick color to be complimentary
with the first MOB.
Resolved
42 1 Planning & Zoning
Rachel Keesling
8/28/23 3:01 PM
Changemark
Location for additional detailing
Please consider adding additional decorative brick patterns or enhancements
to provide more visual interest to the facades. I've included an image from
the PUD character imagery as an example.
A001 ELEVATIONS.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:42 AM
Additional brick details have been incorporated with a
secondary brick accent color, insets at the columns, and
additional brick patterning above punched openings
and at the window bays.
Resolved
43 1 Planning & Zoning
Rachel Keesling
8/28/23 3:01 PM
Changemark
Material change
What is the reason that this part of the second floor could not be all
windows like the rest of the 2nd floor on this elevation?
A002 ELEVATIONS.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:42 AM
Space beyond these areas either do not require
windows or specific locations at which openings can
occur. The elevations reflect those needs of the interior
spaces.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
44 1 TriCo Regional
Sewer Utility
Ryan Hartman
8/29/23 1:58 PM
Comment
Sent Kylie/Structurepoint w/ minor comments on 8/22 and will wait for
revised plans as well as MEP plans for final review.
Responsed by: Kylie Bright-Schuler - 10/13/23 10:43 AM
Updated plans have been sent to Ryan.
Resolved
45 1 Engineering
Alex Jordan
9/1/23 9:21 AM
Library Comment
Please provide a professional engineer's stamp on the plans
Responsed by: Kylie Bright-Schuler - 12/6/23 9:09 AM
A professional engineer's stamp has been added to the
plans.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 11/16/23 9:17 AM
I will leave this comment as unresolved until the final
submittal list is ready to be issued.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 11/8/23 8:21 AM
Stamped drawings will be provided upon completion of
the final review.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 10:44 AM
Stamped drawings will be provided upon completion of
the final review.
Resolved
46 1 Engineering
Alex Jordan
9/1/23 9:21 AM
Library Comment
Please provide all technical information required by Section 102.02(xi)(m) of
the Storm Water Technical Standards
Responsed by: Kylie Bright-Schuler - 10/13/23 10:45 AM
Technical information is provided in the drainage report.
Resolved
47 1 Engineering
Alex Jordan
9/1/23 9:21 AM
Library Comment
Please provide the anticipated start construction date in a comment letter or
project summary
Responsed by: Kylie Bright-Schuler - 10/13/23 1:51 PM
Anticipated construction start date is November 2023.
Resolved
48 1 Engineering
Alex Jordan
9/1/23 9:21 AM
Library Comment
Please provide the City's paving policy in the set
Responsed by: Kylie Bright-Schuler - 10/13/23 10:47 AM
This has been provided in the plan set.
Resolved
49 1 Engineering
Alex Jordan
9/1/23 9:21 AM
Library Comment
Please provide the City's curbing policy in the set
Responsed by: Kylie Bright-Schuler - 10/13/23 10:47 AM
This has been provided in the plan set.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
50 1 Engineering
Alex Jordan
9/1/23 9:48 AM
Library Comment
Please provide all adjacent landowners and the location of any section
corners on the plan
Responsed by: Kylie Bright-Schuler - 10/13/23 10:47 AM
This has been provided in the plan set.
Resolved
51 1 Engineering
Alex Jordan
9/1/23 9:48 AM
Library Comment
Please verify that there are no direct discharge areas
Responsed by: Kylie Bright-Schuler - 10/13/23 10:47 AM
This has been verified. Please refer to the updated
drainage basin map.
Resolved
52 1 Engineering
Alex Jordan
9/1/23 9:48 AM
Library Comment
Please ensure any new drives crossing existing sidewalks or asphalt paths
have been made compliant with ADA specifications
Responsed by: Kylie Bright-Schuler - 10/13/23 10:48 AM
Sidewalks and paths are ADA compliant.
Resolved
53 1 Engineering
Alex Jordan
9/1/23 9:48 AM
Library Comment
Please verify that all elevations are North American Vertical Datum of 1988
(NAVD)
Responsed by: Kylie Bright-Schuler - 10/13/23 10:48 AM
Refer to C100. All elevations are based on NAV 88
Resolved
54 1 Engineering
Alex Jordan
9/1/23 9:48 AM
Library Comment
Please verify that the horizontal datum of topgraphic map is Indiana State
Plane Coordinates, NAD83
Responsed by: Kylie Bright-Schuler - 10/13/23 10:48 AM
Topographic data is based on IN State Plane East (NAD
83)
Resolved
55 1 Engineering
Alex Jordan
9/1/23 9:48 AM
Library Comment
Please verify that the locations of existing utilities with top of curb and invert
elevations, pipe sizes, and direction are shown
Responsed by: Kylie Bright-Schuler - 10/13/23 10:48 AM
Theses are shown on C100, 300, 302, 400, 500, and 501.
Resolved
56 1 Engineering
Alex Jordan
9/1/23 9:48 AM
Library Comment
Please verify that all existing culverts, pipes, and bridges on existing drives or
under the roadway are shown indicating size, type, and invert elevations
Responsed by: Kylie Bright-Schuler - 10/13/23 10:49 AM
Theses are shown on C100, 300, 302, 400, 500, and 501.
Resolved
57 1 Engineering
Alex Jordan
9/1/23 9:48 AM
Library Comment
Please verify that the locations of all existing electrical power vaults,
transformers, power lines, gas lines, television cable , and telephone lines are
shown
Responsed by: Kylie Bright-Schuler - 10/13/23 10:49 AM
Theses are shown on C100, 300, 302, 400, 500, and 501.
Resolved
58 1 Engineering
Alex Jordan
9/1/23 9:48 AM
Library Comment
Please provide the minimum flood protection grade (MFPG) and minimum
lowest adjacent grade (MLAG) elevations and definitions of each
Responsed by: Kylie Bright-Schuler - 10/13/23 10:49 AM
Definitions have been added to the Grading Plan.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
59 1 Vectren Energy
Chad Miller
9/5/23 11:35 AM
Changemark
CenterPoint Energy
The proposed building will require a gas main extension and will need
coordination with the Carmel Medical Office Building at The Bridges to the
north as they want gas also. Please have the owner or developer contact the
new service center at 1-800-990-1990 to have a work order created for the
new service. CenterPoint will need load information on the proposed
building to size the gas meter and an AutoCAD file.
C400 UTILITY PLAN.pdf Info Only
60 1 Engineering
Alex Jordan
9/6/23 2:48 PM
Changemark
Please clearly call out the BMPs and the BMP easements on this map
O&M Manual.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:49 AM
Linework has been updated.
Resolved
61 1 Engineering
Alex Jordan
9/6/23 2:49 PM
Changemark
Please include the water quality unit in the structure data table
C310 STRUCTURE DATA TABLE.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:22 AM
The water quality unit has been specified in the
structure data table.
Resolved
62 1 Engineering
Alex Jordan
9/7/23 8:58 AM
Changemark
Please clearly call out the BMPs on this sheet
Please also show the BMP easements on this sheet
C501 EROSION CONTROL PLAN.pdf Responsed by: Kylie Bright-Schuler - 11/8/23 8:22 AM
Callouts have been provided.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/27/23 8:34 AM
It does not appear that call outs were provided for the
water quality unit and the isolator rows on this sheet.
Please revise.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 10:59 AM
The easement linework has been updated.
Resolved
63 1 Engineering
Alex Jordan
9/7/23 8:58 AM
Changemark
The inlets on the west side of this street will need to be protected if they are
installed prior to construction starting on this project
C501 EROSION CONTROL PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:59 AM
Inlet protection has been provided.
Resolved
64 1 Engineering
Alex Jordan
9/7/23 9:04 AM
Changemark
The minimum length of the construction entrance will need to be 150'
C520 EROSION CONTROL DETAILS.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 10:59 AM
Detail updated and gravel entrance on ECP extended to
meet 150' requirement.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
65 1 Fire
Carmel Fire
9/7/23 12:29 PM
Comment
Provide an additional Fire hydrant for firefighting purposes on the west side
of the building. This appliance is to be located adjacent to the access drive
and not obstructed by any object, including parked vehicles in parking
spaces.
Responsed by: Kylie Bright-Schuler - 11/8/23 9:19 AM
A hydrant location has been coordinated with Carmel
Fire.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 2:35 PM
There are existing hydrants south, southeast, and
southwest of the proposed building. Because there is no
water line internal to the site, would it be acceptable to
add an additional hydrant in the northeast corner off of
the Illinois St. main?
Resolved
66 1 Transportation
Systems
David Littlejohn
9/11/23 2:44 PM
Changemark
Bike rack detail
Provide a detail showing the proposed bike racks to ensure that they will
comply with the City's bicycle parking standards. Refer to section 5.29 of the
City's UDO for more information/details on the City's bicycle parking
requirements/standards.
C201 SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:01 AM
U style Bike Rack detail (Same as one from MOB) is on
sheet C600.
Resolved
67 1 Transportation
Systems
David Littlejohn
9/11/23 3:32 PM
Changemark
Sidewalk connection from building to Illinois St path
Revise the plans to include a sidewalk connection directly from the front of
the building to the path along Illinois St.
C201 SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:01 AM
The site plan has been updated.
Resolved
68 1 Transportation
Systems
David Littlejohn
9/11/23 3:36 PM
Changemark
Sidewalk along south side of street
Section 11.2 of the Bridges PUD requires sidewalks along both sides of all
interior streets. Revise the plans to include a sidewalk along the south side of
the east/west street along the north side of the project.
C201 SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:01 AM
The site plan has been updated.
Resolved
69 1 Hamilton County
Surveyor
Samuel Clark
9/11/23 3:55 PM
Comment
PLEASE SUBMIT AN OUTLET CONNECTION PERMIT FOR THE INDIRECT
CONNECTION TO THE WILLIAMS CREEK REGULATED DRAIN
Resolved
70 1 Transportation
Systems
David Littlejohn
9/11/23 3:59 PM
Changemark
Wheel stops for parking perpendicular to sidewalks
Section 5.28 of the City's UDO requires wheel stops for parking spaces that
are perpendicular to pedestrian sidewalks to prevent the bumper of a vehicle
from projecting over the surface of the pedestrian facility. Please revise the
plans to include wheel stops at this parking aisle and all other locations
where parking is perpendicular to adjacent sidewalks and bollards are not
proposed.
C201 SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:02 AM
The site plan has been updated.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
71 1 Sign Permits
Aliza Shalit
9/11/23 4:39 PM
Changemark
Sign Package
A Sign Package is required for multi tenant buildings. Please provide plans
for tenant signage that include locations, sign spandrel panel height and
width, lighting and mounting requirements.
A001 ELEVATIONS.pdf Reviewer Response: Aliza Shalit - 10/27/23 12:49 PM
If submitted separately, an ADLS Amend-Sign
application will be required
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 11:02 AM
Signage design and dimensions will be part of a
separate submittal.
Info Only
72 1 Sign Permits
Aliza Shalit
9/11/23 4:39 PM
Changemark
Sign Spandrel panel
Full Sign spandrel panel is as outlined. Maximum sign size is determined as
70% of height x 85% of width of sign spandrel panel (max 300sf).
A001 ELEVATIONS.pdf Reviewer Response: Aliza Shalit - 10/27/23 1:03 PM
If submitted separately, an ADLS Amend-Sign
application will be required
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 11:02 AM
Signage design and dimensions will be part of a
separate submittal.
Info Only
73 1 Sign Permits
Aliza Shalit
9/11/23 4:39 PM
Changemark
Number of signs
Two signs per street frontage are allowed up to 6 total. If there is a choice of
locations, please include them as possibilities on the sign package. Only
those locations outlined by the sign package will be allowed to have a sign.
Per the PUD a company may only have ONE sign on any given frontage.
A001 ELEVATIONS.pdf Responsed by: Kylie Bright-Schuler - 11/8/23 8:34 AM
Acknowledged.
----------------------------------------------------------
Reviewer Response: Aliza Shalit - 10/27/23 1:03 PM
If signage will be part of a separate submittal, please do
not include specific signs on these drawings as
approvals should not have items not reviewed for
compliance. If they remain, approval of DP ADLS as is
will not mean signage is approved.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 11:02 AM
Signage design and dimensions will be part of a
separate submittal.
Info Only
74 1 Sign Permits
Aliza Shalit
9/11/23 4:40 PM
Comment
All signs require a separate sign permit application and review process.
Please apply online when ready.
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
75 1 CrossRoad
Engineers
Willie Hall
9/12/23 9:45 AM
Changemark
102.02.v.a.
the Existing Project Site Layout shall include the names of adjoining
properties shall be labeled on the map.
C100 EXISTING TOPOGRAPHY
PLAN.pdf
Responsed by: Kylie Bright-Schuler - 10/13/23 11:03 AM
Information has been added to the sheet.
Resolved
76 1 CrossRoad
Engineers
Willie Hall
9/12/23 9:45 AM
Changemark
102.02.v.b
the Existing Project Site Layout shall include the location, name, and normal
water level of all wetlands, lakes, ponds, and water courses on or adjacent to
the project site.
C100 EXISTING TOPOGRAPHY
PLAN.pdf
Responsed by: Kylie Bright-Schuler - 10/13/23 11:03 AM
Information has been added to the sheet.
Resolved
77 1 CrossRoad
Engineers
Willie Hall
9/12/23 9:45 AM
Changemark
102.02.v.c & f
The Existing Project Site Layout shall include the location of all existing
structures on the project site. The Existing Project Site Layout shall include
the location of storm, sanitary, combined sewer, and septic tank systems and
outfalls with all top of casting elevation, invert elevations, pipe sizes, and
pipe material indicated. Existing structure and pipe information shall be as-
built information and not design information if the structures are already
installed.
C100 EXISTING TOPOGRAPHY
PLAN.pdf
Responsed by: Kylie Bright-Schuler - 11/8/23 8:12 AM
That information appeared to be frozen on the
referenced sheet. It should be shown now for your
reference.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/19/23 3:43 PM
Please include, at a minimum the existing structures on
the south side of the site to which the detention will
ultimately outlet.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 11:04 AM
Construction is ongoing and therefore as-builts have
not been completed for the proposed storm layout.
Resolved
78 1 CrossRoad
Engineers
Willie Hall
9/12/23 9:49 AM
Changemark
102.02.vii
the Plan and Profile Sheet(s) shall include the hydraulic grade line indicated
on the profiles to demonstrate that the hydraulic grade line remains below
the rim elevation for the design condition.
C410 STORM SEWER PLAN &
PROFILES.pdf
Responsed by: Kylie Bright-Schuler - 11/8/23 8:09 AM
The HGLs have been updated accordingly.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/20/23 2:31 PM
Please review the HGL upstream of 153 as it appears
significantly higher than downstream. Sheet C414 and
STR UGD OUT do not contain HGLs.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 2:49 PM
HGL elevations are shown on the plan and profiles.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
79 1 CrossRoad
Engineers
Willie Hall
9/12/23 9:49 AM
Changemark
501.01
there should be no less than 2.5 feet of cover along any part of the pipe
from final pavement elevation or final ground surface elevation to the top of
the pipe.
C410 STORM SEWER PLAN &
PROFILES.pdf
Responsed by: Kylie Bright-Schuler - 10/13/23 11:04 AM
2.5' cover has been provided.
Resolved
80 1 CrossRoad
Engineers
Willie Hall
9/12/23 10:23 AM
Changemark
102.02.xi.d
Please include limits of disturbance on all sheets containing a plan view.
C300 GRADING PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:04 AM
Limits of construction have been added to the sheet set.
Resolved
81 1 CrossRoad
Engineers
Willie Hall
9/12/23 10:23 AM
Changemark
102.02.xi.g
Please include existing and proposed detention critical storm elevations on
the grading plan.
C300 GRADING PLAN.pdf Responsed by: Kylie Bright-Schuler - 11/8/23 8:14 AM
Critical storm elevations have been added to the
Grading Plan.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/20/23 3:18 PM
Please include critical storm elevations of the detention
basin.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 11:04 AM
Drainage summary has been included in the grading
plan.
Resolved
82 1 CrossRoad
Engineers
Willie Hall
9/12/23 10:23 AM
Changemark
Bridges Apartments OCS
The indicated rim elevation for the OCS for the Bridges Apartments pond
does not match the OCS detail provided in said project plans.
C300 GRADING PLAN.pdf Responsed by: Kylie Bright-Schuler - 11/8/23 8:16 AM
This has been handled per a conversation with the
designer of the Steadman plans.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/20/23 2:39 PM
If that is the case, the outlet control structure was
installed incorrectly and will need to be remedied.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 11:05 AM
The existing topography has been updated per what
was constructed in the field.
Resolved
83 1 CrossRoad
Engineers
Willie Hall
9/12/23 10:23 AM
Changemark
102.02.xi.h
the grading and drainage plan shall indicate as to the system being public or
private.
C300 GRADING PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:05 AM
This has been updated in the general notes block.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
84 1 CrossRoad
Engineers
Willie Hall
9/12/23 10:28 AM
Changemark
102.02.xi.m
the grading and drainage plan shall include a drainage summary, which
summarizes the basic conditions of the drainage design, including site
acreage, off-site/upstream acreage, allowable release rates, post-developed
10-year, and 100-year flows leaving the site, volume of detention required,
volume of detention provided, and any release rate.
C300 GRADING PLAN.pdf Responsed by: Kylie Bright-Schuler - 11/8/23 8:16 AM
Drainage summary has been updated.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/23/23 9:48 AM
Please update based on Cycle #2 comments.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 11:06 AM
A summary has been included.
Resolved
85 1 CrossRoad
Engineers
Willie Hall
9/12/23 10:31 AM
Changemark
102.02.xi.k
Please include emergency flow routing from the MOB and Apartment
projects since some of those overflow paths were routed onto this site.
C320 FLOOD ROUTING PLAN.pdf Responsed by: Kylie Bright-Schuler - 11/8/23 8:17 AM
The drainage summary has been updated.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/20/23 3:23 PM
Please note MFPGs and MLAGs for both proposed
buildings on this sheet based on the clogged scenario
flooding elevations.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 11:06 AM
Emergency routing from has been provided.
Resolved
86 1 CrossRoad
Engineers
Willie Hall
9/12/23 10:34 AM
Changemark
102.02.xi.l
Please reference correct sheet.
C600 SITE DETAILS.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:07 AM
Sheet C605 referenced for backfill requirements.
Resolved
87 1 CrossRoad
Engineers
Willie Hall
9/12/23 10:35 AM
Changemark
MFPG
Please include MPFG and MLAG building elevations on all relevant sheets.
C300 GRADING PLAN.pdf Responsed by: Kylie Bright-Schuler - 11/8/23 8:17 AM
MFPGs and MLAGs are included on the updated sheets.
Please refer to the latest sheets.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/20/23 3:20 PM
MFPGs and MLAGs not found.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 11:07 AM
Elevations have been included.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
88 1 CrossRoad
Engineers
Willie Hall
9/12/23 11:34 AM
Changemark
102.02.xi.j
Please include critical detention information on this sheet.
C400 UTILITY PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:07 AM
Elevations have been included.
Resolved
89 1 CrossRoad
Engineers
Willie Hall
9/12/23 11:43 AM
Comment
Drainage Report 102.03.i.b Proposed Drainage Basin It is proposed to only
detain 4.3 of the total 5.4 acres of development. Please show that the
Bridges apartments and MOB storm infrastructure and detention facilities
will not require modification with the originally unaccounted for additional
runoff from this project. The overall curve number is based on the 5.4 acres,
but used in the detention calculations that only considers the 4.3 acres. If the
detention is going to be designed to only accommodate 4.3 acres, the
detention CN should be calculated based on said basin. Any direct discharge
to the Illinois St R/W will need to be counted toward the overall release rate
and remain under the allowable.
Responsed by: Kylie Bright-Schuler - 10/13/23 11:09 AM
Updated basins have been provided in the drainage
report.
Resolved
90 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:06 PM
Comment
Drainage Report 102.03.ii Please include in the summary table the following:
-required & provided detention volume -90% drawdown time
Responsed by: Kylie Bright-Schuler - 11/8/23 8:18 AM
The drainage summary has been updated.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/20/23 3:53 PM
Requested information not provided in the summary
table.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 11:09 AM
Please refer to the Drainage report for updated
calculations.
Resolved
91 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:08 PM
Comment
Drainage Report 102.03.iii Please provide detention stage/storage outputs.
Responsed by: Kylie Bright-Schuler - 10/13/23 11:09 AM
Please refer to the Drainage report for updated
calculations.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
92 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:23 PM
Changemark
302.06.10
a minimum of fifteen (15) feet horizontally from the top of bank of the
facility, or the 100-year pool if no defined top of bank is present, shall be
dedicated as permanent stormwater easement if the above-noted boundary
of the common area does not extend that far.
C400 UTILITY PLAN.pdf Responsed by: Kylie Bright-Schuler - 11/8/23 8:18 AM
The easement footprint has been updated.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/23/23 9:37 AM
Please update the easement footprint to match the new
detention footprint.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 11:10 AM
Easement information has been added to the plans.
Resolved
93 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:24 PM
Comment
Drainage Report 302.06.11 Detention basins shall be designed with an
additional ten (10) percent of available capacity to allow for sediment
accumulation resulting from development and to permit the pond to
function for reasonable periods between cleanings. Basins should be
designed to collect sediment and debris in specific locations.
Responsed by: Kylie Bright-Schuler - 10/13/23 11:12 AM
We are providing 1.7 ac-ft of storage, 10% additional to
the 1.54 ac-ft volume required.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
94 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:26 PM
Comment
Drainage Report 102.03.i.b & 302.06.12 Please provide waiver request from
subject sections of the STSM for detaining full R/W of Illinois St and 111th St
similar to PZ-2022-00237 DP/ADLS Carmel Medical Office at the Bridges.
Reviewer Response: Willie Hall - 11/22/23 1:26 PM
Comment resolved with the understanding that
Engineering is supportive of the requests.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 11/13/23 4:07 PM
A formal waiver request has been submitted.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/20/23 3:57 PM
A formal waiver request will need to be submitted to the
Engineering Department. Please include in next
submittal.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/15/23 12:47 PM
A waiver is requested for detaining the full r/w of Illinois
and 111th Street. Due to the site constraints, detention
is not able to provided for the entire R/W of Illinois and
111st St. According to a master-planned drainage
report, the roadway systems and downstream sites have
the capacity to detain these streets. This development
will not have any adverse effects to the adjacent
roadways.
Resolved
95 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:35 PM
Changemark
102.02.xi.h
The plans shall indicate as to the system being public or private.
C400 UTILITY PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:14 AM
General notes have been updated.
Resolved
96 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:36 PM
Comment
Drainage Report 305.02 All storm sewers, inlets, catch basins, and street
gutters shall accommodate, subject to the allowable spread provisions, as a
minimum, peak runoff from a 10-year return frequency storm calculated
based on methodology described in Section 201.02.
Responsed by: Kylie Bright-Schuler - 10/13/23 11:14 AM
Street inlets have been removed.
Resolved
97 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:39 PM
Changemark
305.02
Minimum diameter for all subsurface underdrains shall be six (6) inches.
C601 SITE DETAILS.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:15 AM
The detail has been updated.
Resolved
98 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:42 PM
Changemark
Curb underdrain
Underdrain per city standards shall be required in roadway section if this
section is to be dedicated as City R/W.
C400 UTILITY PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:17 AM
Road has been removed.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
99 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:50 PM
Changemark
306.02.D
a minimum 20-foot width easement shall be required as access easement
from a public right-of-way to the facility, unless the pond is immediately next
to a public right-of-way.
C400 UTILITY PLAN.pdf Responsed by: Kylie Bright-Schuler - 11/8/23 8:18 AM
The easement footprint has been updated.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/20/23 3:59 PM
Please revise the detention easement to be 15' beyond
the edge of the detention basin.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 11:17 AM
20' easement has been provided.
Resolved
100 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:50 PM
Changemark
501.03
all manholes and inlets must be pre-stamped with an appropriate message
per Hamilton County Standard Detail Drawings.
C310 STRUCTURE DATA TABLE.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:18 AM
The standard details provide this information.
Resolved
101 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:51 PM
Changemark
501.03
all manholes and inlets must be pre-stamped with an appropriate message
per Hamilton County Standard Detail Drawings.
C601 SITE DETAILS.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:18 AM
The standard details provide this information.
Resolved
102 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:55 PM
Changemark
WQ Unit
Please indicate which structure is the WQU.
C310 STRUCTURE DATA TABLE.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:18 AM
A note has been added to the sheet.
Resolved
103 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:58 PM
Comment
Drainage Report Water Quality Calculations Please include Indianapolis SQU
selection guide. Please confirm 10-YR max online flow.
Reviewer Response: Willie Hall - 10/23/23 9:53 AM
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 10/13/23 11:21 AM
This information has been included in the drainage
report.
Resolved
104 1 CrossRoad
Engineers
Willie Hall
9/12/23 4:59 PM
Changemark
701.07
a 20-foot wide access easement from a public right-of-way to each BMP
shall be provided.
C400 UTILITY PLAN.pdf Responsed by: Kylie Bright-Schuler - 10/13/23 11:21 AM
An easement has been provided.
Resolved
105 2 Transportation
Systems
David Littlejohn
10/17/23 9:20 AM
Changemark
Sidewalk connection to Illinois St path
Revise the plans to continue the sidewalk to the path along Illinois St. and to
provide a full sidewalk connection along the south side of the interior street.
C201 SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 3/1/24 11:18 AM
The sidewalk has been adjusted and updated per our
conversation with Rachel.
----------------------------------------------------------
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
Reviewer Response: David Littlejohn - 2/22/24 2:52 PM
Please address this comment as Rachel Keesling noted
in her email from 2/21
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 1/23/24 2:43 PM
Pending conversation with Rachel and the rest of the
planning group as this comment contradicts pervious
conversations.
----------------------------------------------------------
Reviewer Response: David Littlejohn - 1/3/24 2:23 PM
On the grading plan it appears that there is enough
run/length between the sidewalk and the path to
provide an ADA accessible route along the street to
provide a direct pedestrian connection along south side
of the street. Please revise the plans to include a full
sidewalk connection along the south side of the interior
street at that corner.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 12/6/23 9:02 AM
Due to the adjacent grade of the path being 2' higher
than the referenced connection point, an ADA
accessible route cannot be provided. Additionally, it was
our understanding through discussions with the city
that the walk was to be at the location shown on the
plans to further engage the public with this amenity
space. A message was left for Rachel on the matter. If
there is further discussion please let us know!
----------------------------------------------------------
Reviewer Response: David Littlejohn - 11/29/23 1:41 PM
The revised proposal still requires a pedestrian using the
sidewalk along the street to jog to the south to connect
to the path which does not provide a direct pedestrian
connection along the street. Revise the plans to include
a full sidewalk connection along the south side of the
interior street at that corner.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 11/8/23 8:34 AM
Site plan has been updated accordingly.
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
106 2 Transportation
Systems
David Littlejohn
10/17/23 9:58 AM
Changemark
Sidewalk along internal street
The revision of the internal street removed the sidewalk that was included on
the original plan. Revise the plan for the internal drive to include a direct
pedestrian access route along the internal drive to the sidewalk/crosswalk
leading to the entrance of the building.
C201 SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 11/8/23 8:35 AM
Site plan has been updated accordingly.
Resolved
107 2 CrossRoad
Engineers
Willie Hall
10/23/23 9:45 AM
Changemark
Steadman drainage
Please include excerpt from the Bridges drainage report showing that the
0.24 acres are included in its detention calculations.
Drainage Report.pdf Responsed by: Kylie Bright-Schuler - 11/8/23 8:19 AM
The CN of the 0.24 basin that drains to the Steadman
Road is 92. According to the Steadman drainage report,
a CN of 97 was accounted for.
Resolved
108 2 CrossRoad
Engineers
Willie Hall
10/23/23 9:45 AM
Changemark
Direct Discharge
The south basin should either be routed into the detention facility or the
0.47 acres counted as direct discharge toward the overall site release rate.
Drainage Report.pdf Responsed by: Kylie Bright-Schuler - 11/8/23 8:21 AM
This area exists as a current condition on the site. Our
current limits of disturbance do not impact this area and
do to site constraints, we are not able to detain it.
Please refer to the formal variance request submitted
with this response.
Resolved
109 2 CrossRoad
Engineers
Willie Hall
10/23/23 9:57 AM
Changemark
Emergency Spillway
The emergency flow must be contained within the structure under the
bottom of slab top. Please revise.
Drainage Report.pdf Responsed by: Kylie Bright-Schuler - 11/8/23 8:21 AM
The structure has been revised to account for this.
Resolved
110 2 TriCo Regional
Sewer Utility
Ryan Hartman
10/26/23 9:27 AM
Comment
Please submit revised site and utility plan sheets upon next submittal. Also
TriCo is still in need of MEP plans as well as an executed application for
review.
Responsed by: Kylie Bright-Schuler - 11/8/23 8:35 AM
The requested information is being sent to Ryan.
Resolved
111 2 Fire
Carmel Fire
10/30/23 6:32 AM
Comment
Contact Capt. Chris Ellison at 317-571-2621 to discuss the fire hydrant
layout. Project is Not Approved by CFD until this issue is resolved.
Responsed by: Kylie Bright-Schuler - 11/8/23 9:19 AM
A hydrant location has been coordinated with Carmel
Fire.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
112 2 Engineering
Alex Jordan
10/30/23 1:48 PM
Changemark
This elevation is above the proposed MFPG from the grading plan
Please revise the grading in this area to lower the ponding elevation or revise
the FFE/MLAG/MFPG to work with this elevation. The MFPGMLAG must be 1'
above the local ponding elevations and the FFE must be 6" above these
elevations.
C320 FLOOD ROUTING PLAN.pdf Responsed by: Kylie Bright-Schuler - 12/6/23 9:06 AM
Site elevations have been revised so that the MFPG and
MLAG are above the local ponding elevations.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 11/16/23 9:17 AM
The MLAG provided for the building is lower than the
ponding in the clogged condition and will need to be
revised. The MFPG is only slightly above the ponding in
most areas and will also need to be revised.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 11/8/23 8:28 AM
Elevations and grading have been adjusted accordingly.
Resolved
113 2 Engineering
Alex Jordan
10/30/23 1:49 PM
Changemark
Please remove the minimum finished floor elevation in order to avoid any
confusion
Please only list the proposed finished floor and removed the minimum
provided here.
C300 GRADING PLAN.pdf Responsed by: Kylie Bright-Schuler - 11/8/23 8:36 AM
The proposed finish floor has been updated.
Resolved
114 3 Urban Forestry
Daren Mindham
11/15/23 10:14 AM
Changemark
sidewalk to curb width - 6' required
Sidewalk to curb widths are required to be 6'. I see only 3' along the
northern perimeter. With that, trees would not be permitted in such a narrow
soil volume area, especially a short ornamental tree like a redbud as that
would cause vision clearance issues with traffic. Please revise. The trees may
need to go elsewhere around the parking lot area.
L101 LANDSCAPE PLAN.pdf Responsed by: Kylie Bright-Schuler - 12/6/23 1:58 PM
The two trees located in this northern area have been
shifted.
Resolved
115 3 Urban Forestry
Daren Mindham
11/15/23 10:18 AM
Changemark
sidewalk to curb area to narrow for street trees
please move any trees within a less than 6' sidewalk to curb area to the
property side of the path. Those trees will need to be changed to evergreens
to meet the PUD then.
L101 LANDSCAPE PLAN.pdf Responsed by: Kylie Bright-Schuler - 12/6/23 9:10 AM
The referenced trees have been shifted accordingly.
Resolved
116 3 TriCo Regional
Sewer Utility
Ryan Hartman
11/30/23 10:31 AM
Comment
Utility plans has been updated. TriCo is still in need of MEP plans as well as
an executed application for review.
Responsed by: Kylie Bright-Schuler - 12/6/23 9:00 AM
MEP information will be sent when available to us. An
executed application was sent on 11/14.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00189 DP ADLS - Midwest Eye Institute at The Bridges
Workflow Started: 8/17/2023 9:51:30 AM
Report Generated: 03/06/2024 09:14 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
117 4 TriCo Regional
Sewer Utility
Ryan Hartman
12/22/23 8:46 AM
Comment
Please make sure the Type I CO gets moved closer to the building (3' max).
Also waiting on MEP plans to perform a final review.
Responsed by: Kylie Bright-Schuler - 3/1/24 11:18 AM
The cleanout has been shifted. MEP plans have been
provided.
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 1/4/24 11:56 AM
The cleanout has been shifted. MEP plans have been
provided.
Info Only
118 4 Transportation
Systems
David Littlejohn
1/3/24 2:35 PM
Changemark
Bike parking pad moved
It appears the bike parking pad and racks moved to the south from what was
shown on the V2 and V3 the site plan. Please revise the plans to show the
bike parking pad/racks to be in the same location that was shown on the
second and third versions of the site plan so that all of the racks can be
accessed from the adjacent sidewalk.
C200 OVERALL SITE PLAN.pdf Responsed by: Kylie Bright-Schuler - 3/1/24 11:18 AM
The bike parking pad has been adjusted and updated
per our conversation with Rachel.
----------------------------------------------------------
Reviewer Response: David Littlejohn - 2/22/24 2:53 PM
Please address this comment as Rachel Keesling noted
in her email from 2/21
----------------------------------------------------------
Responsed by: Kylie Bright-Schuler - 1/4/24 12:00 PM
The bike parking pad had to be shifted south out of the
ADA ramp location to have a flush condition. If moved
directly in front of the ramp it would create a tripping
hazard.
Resolved
119 4 Engineering
Alex Jordan
1/4/24 9:25 AM
Comment
Please have the plan updated to show the requested HDPE piping and
emailed to me. Before we can issue the stormwater management permit, the
following items will need to be provided: 1. A signed and recorded O&M
manual 2. An erosion control engineers estimate for all temporary and
permanent erosion control measures 3. A non-expiring erosion control
performance bond for 100% of the approved estimate 4. A right-of-way
improvement engineers estimate 5. A non-expiring right-of-way
improvement performance bond for 100% of the approved estimate 6. A
completed BMP easement agreement with exhibit and legal description
(template uploaded in correspondence folder)
Info Only
Shestak, Joe
From:Mindham, Daren
Sent:Tuesday, March 5, 2024 11:02 AM
To:Shestak, Joe
Subject:Please replace on laserfiche
Attachments:Midwest Eye Inst LP stamped approved.pdf
Follow Up Flag:Follow up
Flag Status:Completed
PZ-2023-00189 DP ADLS
Daren Mindham
Environmental Planner
1 Civic Sq
Carmel, IN 46032
317-571-2283
From: Keesling, Rachel M <rkeesling@carmel.in.gov>
Sent: Tuesday, March 5, 2024 9:56 AM
To: Mindham, Daren <dmindham@carmel.in.gov>
Subject: Midwest Eye approved landscape plan
Hi Daren,
Please go into the Midwest Eye Ins?tute project and restamp your landscape plan. They finally made David’s sidewalk
changes so it is a li?le different than the one you stamped.
Thanks,
Rachel
Rachel Keesling
PLANNING ADMINISTRATOR
O: 317-571-2417 | M: 317-750-5634 | rkeesling@carmel.in.gov
City of Carmel - Dept of Community Services
ONE CIVIC SQUARE, CARMEL, IN 46032
1
CODE QTY BOTANICAL / COMMON NAME COND.SIZE SPACING
ORNAMENTAL TREES
AG 5 Amelanchier x grandiflora `Robin Hill` / Robin Hill Apple Serviceberry B & B 1.5" Cal.As shown
CA 3 Cercis canadensis 'Ace of Hearts' / Ace of Hearts Eastern Redbud B & B 1.5" Cal.As Shown
SR 12 Syringa reticulata / Japanese Tree Lilac B & B 1.5" Cal.As Shown
SHADE TREES
CC 9 Celtis occidentalis `Chicagoland` / Chicagoland Hackberry B & B 2.5" Cal.As shown
GB 15 Ginkgo biloba 'Autumn Gold' TM / Autumn Gold Maidenhair Tree B & B 2.5" Cal.As Shown
LR 11 Liquidambar styraciflua `Rotundiloba` / Round-Lobed Sweet Gum B & B 2.5" Cal.As shown
PX 14 Platanus x acerifolia 'Morton Circle' TM / Exclamation! London Plane Tree B & B 2.5" Cal.As Shown
QB 6 Quercus bicolor / Swamp White Oak B & B 2.5" Cal.As Shown
QR 8 Quercus rubra / Red Oak B & B 2.5" Cal.As shown
EVERGREENS
PI 13 Picea abies / Norway Spruce B & B 8` HT.As Shown
TI 12 Thuja x 'Green Giant' / Green Giant Arborvitae B & B 8` HT.As Shown
SHRUBS
CR 18 Clethra alnifolia `Ruby Spice` / Ruby Spice Summersweet CONT.5 GAL 3` O.C.
CK 54 Cornus sericea `Kelseyi` / Kelsey`s Dwarf Red Twig Dogwood CONT.3 GAL 3` O.C.
HI 42 Hydrangea paniculata `Pee Wee` / Pee Wee Panicle Hydrangea CONT.3 GAL 3` O.C.
HA2 13 Hydrangea quercifolia `Alice` / Alice Oakleaf Hydrangea CONT.3 GAL 6` O.C.
IV2 54 Ilex verticillata Berry Poppins / Berry Poppins Winterberry Holly CONT.3 GAL 4` O.C.
IL 10 Ilex verticillata `Mr. Poppins` TM / Mr. Poppins Winterberry CONT.3 GAL.4` O.C.
IH 69 Itea virginica `Little Henry` / Little Henry Sweetspire CONT.3 GAL.3` O.C.
PS 27 Physocarpus opulifolius `Seward` TM / Summer Wine Ninebark CONT.5 GAL 6` O.C.
PF 71 Potentilla fruticosa / Bush Cinquefoil CONT.3 GAL 4` O.C.
SO 11 Sambucus racemosa `SMNSRD4` TM / Lemony Lace Elderberry CONT.5 GAL 72" O.C.
VD 66 Viburnum dentatum `Blue Muffin` / Blue Muffin Arrowwood Viburnum CONT.3 GAL.4` O.C.
WS 18 Weigela florida 'Bokraspiwi' / Spilled Wine® Weigela CONT.3 GAL
EVERGREEN SHRUBS
IC 39 Ilex glabra `Chamzin` TM / Nordic Inkberry Holly CONT.3 GAL 4` O.C.
JX 10 Juniperus x 'Grey Owl' / Grey Owl Juniper CONT.3 GAL 4` O.C.
TP 52 Thuja plicata Fluffy® / Fluffy Arborvitae CONT.3 GAL 4` O.C.
PERENNIALS / GRASSES
CAK 70 Calamagrostis x acutiflora `Karl Foerster` / Feather Reed Grass CONT.1 GAL 30" O.C.
PERENNIAL MASSING
EW 55 Echinacea purpurea `PAS702917` / PowWow® Wild Berry Coneflower CONT.1 Gal. or 4" Pot 18" O.C.
HEM 38 Hemerocallis x `Happy Returns` / Happy Returns Daylily CONT 4" Pot 24" O.C.
HEU 72 Heuchera x `Wild Rose` / Wild Rose Primo Coral Bells CONT 4" Pot 24" O.C.
SH2 42 Sporobolus heterolepis / Prairie Dropseed CONT.1 Gal. or 4" Pot 18" O.C.
PLANT SCHEDULE
TURF GRASS SEED MIX 34,240 sf
See notes for additional installation
requirements. Contractor to select
hybrids that exhibit drought tolerance
and winter hardiness.
CONCEPT PLANT SCHEDULE
ILLINOIS STREETW 111th Street
3 PI3 PI
4 TP 7 IH 3 TP
7 HI
3 TP
7 IH 4 TP
7 HI
4 TP
7 IH
3 TP
5 HI
4 TP
1 CC
1 LR
1 QR
2 PX
1 QR
1 PX
2 QR
1 PX
1 QR
2 PX
2 QR
2 PX
1 QR
1 PX
1 LR
7 VD
1 CC
3 VD
1 QB
1 CC
1 LR
1 GB
5 VD
5 PF
10 PF
1 GB
8 IV2
11 PF
1 LR
55 EW 6 IC 7 IC
5 TP
10 PS
5 CR
26 HEU
5 PS
2 AG
1 AG
4 TP
2 GB
16 HEM
5 JX
12 PS
8 TP
1 AG
1 AG
5 JX
5 IC
7 IH 5 IC
3 HI
5 SR
1 LR
1 GB
7 PF
2 GB
10 PF
1 GB
8 PF
2 GB
2 IL
1 CC
5 CAK
7 CK
5 CAK
9 VD
1 QB
2 LR
1 GB
8 IV2
23 IV2
2 CC
7 VD 5 CAK 7 CK 5 CAK
10 VD
5 PF
5 CAK 7 CK 5 CAK
7 VD
5 PF
1 LR 1 CC 1 QB
1 LR
1 LR
1 GB
1 CC 1 QB
1 GB
1 LR
4 VD
5 CAK
6 CK
5 CAK
5 VD 3 CK
5 CAK
5 PF
5 VD
7 CK
4 CAK
5 PF
4 CK
6 CK
3 VD
1 QB
1 QB
1 CC
1 GB
1 GB
3 HI
3 IC
7 IH
3 HI
2 SR
3 HA2
6 HI
5 IC
3 CR
5 HA2
28 HEU
4 IC
5 CR
4 IC
18 HEU
3 CA
5 HA2
5 CR
9 WS
11 IH 4 HI
11 CAK
4 IH
3 SR
2 SR
4 IH
4 HI
7 IH
5 TP
9 WS
8 IH
11 SO
7 PI
1 TI
2 TI
5 CAK7 CK
5 CAK
5 IV2
1 IL
4 IV2
1 IL
5 PX
5 TI
4 TI
5 TP
22 HEM
CONSTRUCTION DOCUMENTS
9025 River Road, Suite 200 | Indianapolis, Indiana 46240
TEL 317.547.5580 | FAX 317.543.0270
www.structurepoint.com
PLOT DATE: 3/1/2024 10:53 AMPLOT SCALE: 1:2.5849EDIT DATE: 3/1/2024EDITED BY: AMENCHACADRAWING FILE: P:\2023\00797\D. Drawings\Civil\Construction Documents\2023.00797.LA.L100.LP.dwgProject Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
12/15/2023
2023.00797
CARMEL
MIDWEST EYE
INSTITUTE
AT THE BRIDGES
11220 ILLINOIS ST.
CARMEL, INDIANA 46032
REVISION SCHEDULE
NO.DESCRIPTION DATE
Contact: Jeff Shively
Telephone: (317) 503-3374
Email: jshively@cornerstonecompaniesinc.com
REV 01 01/09/241
REV 02 02/05/242
REV 03 03/01/243
L101
LANDSCAPE PLAN
REQUIRED PROVIDED
3
3
3
3/5/2024 Daren Mindham
CONSTRUCTION DOCUMENTS
9025 River Road, Suite 200 | Indianapolis, Indiana 46240
TEL 317.547.5580 | FAX 317.543.0270
www.structurepoint.com
PLOT DATE: 3/1/2024 10:53 AMPLOT SCALE: 1:2.5849EDIT DATE: 3/1/2024EDITED BY: AMENCHACADRAWING FILE: P:\2023\00797\D. Drawings\Civil\Construction Documents\2023.00797.LA.L100.LP.dwgProject Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
12/15/2023
2023.00797
CARMEL
MIDWEST EYE
INSTITUTE
AT THE BRIDGES
11220 ILLINOIS ST.
CARMEL, INDIANA 46032
REVISION SCHEDULE
NO.DESCRIPTION DATE
Contact: Jeff Shively
Telephone: (317) 503-3374
Email: jshively@cornerstonecompaniesinc.com
REV 01 01/09/241
REV 02 02/05/242
REV 03 03/01/243
L110
LANDSCAPE
DETAILSNTS
TREE PLANTING - LEVEL AREA01
NTS
SHRUB AND PERENNIAL PLANTING02NTS
EDGE - SPADE05
SLOPE
EDGE
1'-6"GROUNDCOVER OR ANNUAL
(PER PLAN)
SHRUB (PER PLAN)
3" MULCH LAYER
(AS SPECIFIED)
UNDISTURBED SUBGRADE
BREAK THROUGH ANY EXISTING "HARD PAN" AND REMOVE AS
NECESSARY TO PROVIDE GOOD PERCOLATION & POSITIVE DRAINAGE 12"12"PLANTING SOIL TYPE 2
CULTIVATED SUBGRADE SOIL
12"
NTS
GROUNDCOVER AND ANNUAL PLANTING04
MULCH
2
1
4"3"
NOTE:
1.SPADE EDGE SHALL CREATE A CLEAN
SEPARATION BETWEEN AREAS; AND SHALL
CREATE SMOOTH & EVEN LINES (AS INDICATED
ON THE PLANS)
2.SPADE EDGE DETAIL SHALL BE USED AT ALL
LAWN EDGES & AT EDGES OF MULCHED AREAS
3.SHOVEL SOIL FROM SPADE EDGE INTO BED
PRIOR TO CULTIVATING SOIL
LAWN AREA PLANTING OR MULCHED AREA
EXISTING GRADE OR
GRADE OF PLANTING AREA
1'-0"6"MIN.SPADE EDGE
COMPACT EXCAVATED
FILL TO CREATE SAUCER
3" MULCH LAYER
(SEE GENERAL NOTES)
ROOTBALL (LOOSEN
BURLAP ON TOP 1/2)
NOTES:
1. SEE NOTES FOR DRAINAGE
REQUIREMENTS PROIR TO
PLANTING
2. DO NOT ALLOW AIR POCKETS TO
FORM WHEN BACKFILLING
3. IMMEDIATELY SOAK WITH WATER
4. DO NOT BREAK ROOTBALL
FINISHED GRADE
PLANTING SOIL TYPE 1
ADD EXCAVATED SOIL AS
NEEDED TO BRING TREE
TO FINISHED GRADE. TAMP
LIGHTLY BUT THOROUGHLY
PRIOR TO SETTING TREE
TO PREVENT SETTLING.
SCARIFY BASE OF PLANT
PIT WHEN EXCAVATING PIT.
BREAK THROUGH & LOOSEN
ALL "HARDPAN" (REMOVE AS
NECESSARY TO FACILITATE
DRAINAGE)
KEEP MULCH OFF TRUNK
OF TREE
1.EXCAVATE ROOTBALL PIT
2.SET TREE SUCH THAT TOP OF ROOTBALL IS 2-3"
HIGHER THAN FINISH GRADE.
3.REMOVE ALL TWINE, ROPE, AND BURLAP FROM
TOP 1/3 OF ROOTBALL & EXPOSE ROOT FLARE.
4.BACKFILL WITH SOIL MIX & "WATER IN"
5.COMPLETE BACKFILLING, CONSTRUCT SAUCER,
SPADE-EDGE & ADD MULCH
6.STAKE & GUY SECURELY (AS REQUIRED)
7.INSTALL WATERING DEVICE (AS REQUIRED)
PLANTING PROCEDURE
2-3"
NTS
TREE PLANTING - ON SLOPE03
3/5/2024 Daren Mindham
ILLINOIS STREET111TH STREET
0'60'
NSCALE:1"=60'
30'
PLOT DATE (11"x17"): 11/3/2023 8:11 AM
DRAWING FILE: P:\2023\00797\D. Drawings\Civil\Exhibits\2023-11-03 - Overall Site Plan\2023.00797.CE.SITE_EXHIBIT.2023-11-03.dwg
Site Exhibit
November 3, 2023 2023.00797
Carmel Midwest Eye Institute
at The Bridges