Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 Addressing
Dave McCoy
11/3/23 8:30 AM
Comment
Will the new addition take on the 14540 River Rd address? Please have
someone contact me with the information..
Info Only
2 1 Carmel Utilities
Lisa Kempa
11/6/23 8:32 AM
Comment
Connection fees need to be paid.
Responsed by: Dustin Myers - 2/7/24 4:59 PM
If additional fees are required, please let us know what
those may be and how they are being calculated.
----------------------------------------------------------
Responsed by: Dustin Myers - 12/28/23 1:09 PM
There are no proposed water or sewer connections to
any public infrastructure. The existing water service &
sewer laterals are sufficiently sized to accommodate the
proposed expansion. If additional fees are required,
please let us know how they are being calculated.
UnResolved
3 1 Urban Forestry
Daren Mindham
11/7/23 9:22 AM
Changemark
misspelled word
inches
L-1.0.0 LANDSCAPE PLAN.pdf Responsed by: Dustin Myers - 12/29/23 11:49 AM
the misspelling has been corrected within the updated
plan.
Resolved
4 1 Urban Forestry
Daren Mindham
11/7/23 9:22 AM
Changemark
Parking lot Perimeter and other landscaping
Per the PUD 13.5.B there is a 5' wide perimeter planting area required on all
sides of the parking lot with 4 shade trees and 25 shrubs per 100 linear feet.
Please show and provide. I believe the only lot perimeter landscaping
required is street trees along River Rd which are existing. The building base
landscaping is required per 13.4.C via 13.4.A that requires 3 shade trees, 3
ornamental trees and 25 shrubs per 100 linear feet of building. I don't mind
if its 4 shade and 2 ornamental trees as you have currently noted. Please
ensure that all of these minimum required tree and shrub counts are shown
on the landscape plan.
L-1.0.0 LANDSCAPE PLAN.pdf Responsed by: Dustin Myers - 12/29/23 11:50 AM
Per the PUD 13.5.B a 5' wide perimeter planting area has
been provided on the new submittal, including 4 shade
trees and 25 shrubs per 100 linear feet shown.
('Lot Perimeter' label has been specified to 'Parking Lot
Perimeter' in new submittal).
All plants have been recounted and listed correctly in
the new submittal to meet the minimum required tree
and shrub counts shown on the landscape plan.
Resolved
5 1 Urban Forestry
Daren Mindham
11/7/23 9:22 AM
Changemark
CBFF
Using same name for two different plants. please correct.
L-1.0.0 LANDSCAPE PLAN.pdf Responsed by: Dustin Myers - 12/29/23 11:51 AM
Carpinus Betulus Fastigiata is no longer being used.
Resolved
REVIEW COMMENTS
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
6 1 Urban Forestry
Daren Mindham
11/7/23 9:22 AM
Changemark
Native trees
As this area is near the river, please use more native trees. Can you change
these to an oak species? river birch or hackberry would also be a good
choice.
L-1.0.0 LANDSCAPE PLAN.pdf Responsed by: Dustin Myers - 12/29/23 11:52 AM
These trees have been changed to be White Oaks, by
request.
Resolved
7 1 Urban Forestry
Daren Mindham
11/7/23 9:22 AM
Changemark
sizes
Please provide the required size notation for each plant per PUD 13.1.C.
shade 2.5" ornamental 1.5" shrubs 18"
L-1.0.0 LANDSCAPE PLAN.pdf Responsed by: Dustin Myers - 12/29/23 11:52 AM
Required size notation for each plant per PUD 13.1.C.
has been correctly provided.
Resolved
8 1 Urban Forestry
Daren Mindham
11/7/23 9:25 AM
Changemark
bar scale
In projectdox the measuring tool is best if there is a bar scale for measuring.
Please add a bar scale.
L-1.0.0 LANDSCAPE PLAN.pdf Responsed by: Dustin Myers - 12/29/23 11:53 AM
A bar scale has been provided on the updated plan
sheet.
Resolved
9 1 Urban Forestry
Daren Mindham
11/7/23 9:28 AM
Changemark
better spacing
site-wide: please do not place any trees within 6-8' of a sidewalk to limit
clearance issues and to provide better soil volume space for the root
systems.
L-1.0.0 LANDSCAPE PLAN.pdf Responsed by: Dustin Myers - 12/29/23 11:54 AM
Trees have been placed a minimum of 6' away from all
sidewalks on the updated plan.
Resolved
10 1 Fire
Carmel Fire
11/9/23 7:42 AM
Comment
507.5.4 Obstruction. Unobstructed access to fire hydrants shall be
maintained at all times. The fire department shall not be deterred or
hindered from gaining immediate access to fire protection equipment or fire
hydrants. The proposed fire hydrant shown on the utility page is located in
front of parking spaces that will result in a violation of Indiana Fire Code
section 507.5.4 when vehicles are present. The parking spaces shall be
marked no parking fire lane or relocated the hydrant to a island in the
parking lot that does not create a IFC violation.
Responsed by: Dustin Myers - 12/28/23 4:40 PM
The fire hydrant has been relocated to an island so that
access is always available.
Resolved
11 1 Fire
Carmel Fire
11/9/23 8:09 AM
Comment
Provide details for how the fire protection system will be designed for the
new addition.
Responsed by: Dustin Myers - 12/28/23 4:41 PM
Integrity Fire Protection will design and hydraulically
calculate a sprinkler system for the building addition,
per NFPA 13. These documents will be submitted to the
state for review/permit and to Carmel Fire Department,
prior to ordering or installing any material.
Resolved
12 1 Fire
Carmel Fire
11/9/23 8:10 AM
Comment
All Fire protection systems and fire alarm systems shall remain in-service and
maintained for the exiting buildings at all times.
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
13 1 Fire
Carmel Fire
11/9/23 8:11 AM
Comment
All required building exiting for existing structures shall be maintained
during construction.
Info Only
14 1 Vectren Energy
Chad Miller
11/13/23 1:54 PM
Changemark
CenterPoint Energy
The gas meter may need to be resized depending on the load the proposed
addition will add. Please call the new service center at 1-800-990-1930 with
the new load for the proposed addition to make sure the current meter is big
enough. CenterPoint will also need an AutoCAD file.
C-400.0 UTILITY PLAN.pdf Info Only
15 1 Sign Permits
Aliza Shalit
11/14/23 10:18 AM
Changemark
Canopy Sign
This sign will require a sign variance. One sign per street frontage allowed,
no frontage to the south.
A4.4.0 - HARVEST CHURCH COLOR
ELEVATIONS.pdf
Responsed by: Dustin Myers - 2/7/24 5:29 PM
A variance, for the existing and proposed signage, shall
be filed. It is understood that if the variance is not
granted, that the proposed signage will not be
permitted. The Church shall file this variance petition at
a later date as it was relayed to them that the signage
variance shall not hold up permitting of the proposed
building addition.
----------------------------------------------------------
Responsed by: Dustin Myers - 12/28/23 5:04 PM
The Church intends to file for a variance for the canopy
sign.
Info Only
16 1 Sign Permits
Aliza Shalit
11/14/23 10:18 AM
Changemark
Canopy Sign - Worship Center
This sign will require a variance. One sign per street frontage allowed, no
North street frontage available.
A4.4.0 - HARVEST CHURCH COLOR
ELEVATIONS.pdf
Responsed by: Dustin Myers - 2/7/24 5:30 PM
A variance, for the existing and proposed signage, shall
be filed. It is understood that if the variance is not
granted, that the proposed signage will not be
permitted. The Church shall file this variance petition at
a later date as it was relayed to them that the signage
variance shall not hold up permitting of the proposed
building addition.
----------------------------------------------------------
Responsed by: Dustin Myers - 12/28/23 5:04 PM
The Church intends to file for a variance for the canopy
sign.
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
17 1 Sign Permits
Aliza Shalit
11/14/23 10:18 AM
Changemark
Updated elevations
Please provide updated elevation which should include all existing signage
and murals.
A4.4.0 - HARVEST CHURCH COLOR
ELEVATIONS.pdf
Responsed by: Dustin Myers - 2/12/24 2:27 PM
The revised building elevations include all existing
signage and murals.
----------------------------------------------------------
Responsed by: Dustin Myers - 12/29/23 12:46 PM
Please see updated elevations.
Resolved
18 1 Sign Permits
Aliza Shalit
11/14/23 10:20 AM
Changemark
Sign
This sign does not seem to exist on the existing building. Multiple other
murals are existing. Please provide updated elevation with all existing
signage/murals included.
A4.1.0 - Elevations.pdf Reviewer Response: Aliza Shalit - 1/22/24 4:28 PM
Where are all the existing signs?
----------------------------------------------------------
Responsed by: Dustin Myers - 12/29/23 12:46 PM
Please see updated elevations.
Resolved
19 1 Sign Permits
Aliza Shalit
11/14/23 10:48 AM
Comment
All Signs require a separate Sign Permit application and review. Please apply
through our online permitting site.
Info Only
20 1 Planning & Zoning
Christina Jesse
11/14/23 11:07 AM
Changemark
Diamond pattern on east elevation
Add the diamond pattern on the precast concrete panels in the area
highlighted in green on the east elevation to reflect the design of the
existing building.
A4.4.0 - HARVEST CHURCH COLOR
ELEVATIONS.pdf
Reviewer Response: Christina Jesse - 1/16/24 3:07 PM
----------------------------------------------------------
Responsed by: Dustin Myers - 12/29/23 12:13 PM
It is the desire to not carry the diamond pattern through
to the expansion. The colors will be carried, just
not the diamond pattern. Please see updated elevations.
Resolved
21 1 Planning & Zoning
Christina Jesse
11/14/23 11:07 AM
Changemark
North elevation area of expansion
Please provide additional context on what area of expansion is able to be
seen on the north elevation as the site plan does not reflect new
construction in this area.
A4.4.0 - HARVEST CHURCH COLOR
ELEVATIONS.pdf
Responsed by: Dustin Myers - 12/1/23 2:58 PM
This shaded area is reflecting the new addition to the
south in the distance. There is no new addition to the
existing worship center to the west.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
22 1 Planning & Zoning
Christina Jesse
11/14/23 11:07 AM
Changemark
Additional brick on east elevation
Add brick inlay to the sections highlighted in red on the east elevation to
carry the masonry across the only front facade along River Road. If a primary
entry feature cannot be accommodated on the true front of the building,
additional architectural design features are required to enhance the front of
the building. The addition of windows would also be appropriate here.
A4.4.0 - HARVEST CHURCH COLOR
ELEVATIONS.pdf
Responsed by: Dustin Myers - 12/29/23 12:29 PM
Additional brick has been added along the east
elevation
Simulated windows were also added along the east
elevation.
Resolved
23 1 Planning & Zoning
Christina Jesse
11/14/23 11:07 AM
Changemark
Additional brick on south elevation
Add brick inlay to the section highlighted in red on the south elevation to
carry the masonry across the facade facing River Road.
A4.4.0 - HARVEST CHURCH COLOR
ELEVATIONS.pdf
Responsed by: Dustin Myers - 12/29/23 12:30 PM
Additional brick has been added.
Resolved
24 1 Planning & Zoning
Christina Jesse
11/14/23 11:07 AM
Changemark
Diamond pattern on west elevation
Add the diamond pattern on the precast concrete panels in the area
highlighted in green on the west elevation to reflect the design of the
existing building
A4.4.0 - HARVEST CHURCH COLOR
ELEVATIONS.pdf
Reviewer Response: Christina Jesse - 1/16/24 3:08 PM
----------------------------------------------------------
Responsed by: Dustin Myers - 12/29/23 12:31 PM
Per discussions, it is preferred to not install any
diamond pattern to the proposed addition, additional
brick has been added in lieu of the diamond pattern.
Resolved
25 1 Planning & Zoning
Christina Jesse
11/14/23 11:07 AM
Changemark
Additional brick on west elevation
Add brick inlay to the sections highlighted in red on the west elevation to
continue the design element of masonry across the facade. Plain precast
concrete panels look too plain here. Add brick here to enhance the entry
features and reflect the design of the existing building.
A4.4.0 - HARVEST CHURCH COLOR
ELEVATIONS.pdf
Responsed by: Dustin Myers - 12/29/23 12:33 PM
Additional brick has been added.
Resolved
26 1 Planning & Zoning
Christina Jesse
11/14/23 11:10 AM
Changemark
Signage elevations
Please upload a separate file showing the signage that exists today on the
building (including the square panel signs) and the proposed future signage.
A4.4.0 - HARVEST CHURCH COLOR
ELEVATIONS.pdf
Responsed by: Dustin Myers - 12/1/23 2:56 PM
photos of the existing building signs have been
uploaded. ‘plain mural panels’ will be removed and
replaced with the new building sign per the black &
white East elevation
Resolved
27 1 Planning & Zoning
Christina Jesse
11/14/23 11:11 AM
Changemark
Existing ground sign
Will the existing ground sign be removed? Please label whether this will
remain or be removed on the site plan.
C-300.0 SITE DIMENSION PLAN.pdf Responsed by: Dustin Myers - 12/28/23 4:44 PM
Sheet 300 has been updated to indicate that the
existing ground sign shall remain.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
28 1 Planning & Zoning
Christina Jesse
11/14/23 11:11 AM
Changemark
Proposed new ground sign
Will the existing ground sign be removed? Only one ground sign is allowed
per street frontage.
C-300.0 SITE DIMENSION PLAN.pdf Reviewer Response: Christina Jesse - 1/16/24 2:48 PM
Approval will be conditional upon the granting of a
variance for this additional signage. Please work with
Angie Conn on the variance petition and Aliza Shalit on
the sign permit.
----------------------------------------------------------
Responsed by: Dustin Myers - 12/28/23 4:45 PM
The existing sign shall be maintained, and the Church
shall apply for a variance to install an additional sign
near the proposed south entrance.
Info Only
29 1 Sign Permits
Aliza Shalit
11/14/23 11:24 AM
Changemark
Ground sign
If existing ground sign to the North will remain, this sign will require a a
variance for number of signs as well. Please confirm. Per UDO Sign
Standards, only one sign per street frontage is allowed (River Rd is the only
street frontage).
C-300.0 SITE DIMENSION PLAN.pdf Responsed by: Dustin Myers - 2/7/24 5:31 PM
A variance, for the existing and proposed signage, shall
be filed. It is understood that if the variance is not
granted, that the proposed signage will not be
permitted. The Church shall file this variance petition at
a later date as it was relayed to them that the signage
variance shall not hold up permitting of the proposed
building addition.
----------------------------------------------------------
Responsed by: Dustin Myers - 12/28/23 5:06 PM
The existing sign shall be maintained, and the Church
shall apply for a variance to install an additional sign
near the proposed south entrance.
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
30 1 Sign Permits
Aliza Shalit
11/14/23 11:24 AM
Changemark
Existing Ground Sign
Will this ground sign remain?
C-300.0 SITE DIMENSION PLAN.pdf Responsed by: Dustin Myers - 2/7/24 5:31 PM
A variance, for the existing and proposed signage, shall
be filed. It is understood that if the variance is not
granted, that the proposed signage will not be
permitted. The Church shall file this variance petition at
a later date as it was relayed to them that the signage
variance shall not hold up permitting of the proposed
building addition.
----------------------------------------------------------
Responsed by: Dustin Myers - 12/28/23 5:06 PM
The existing sign shall be maintained, and the Church
shall apply for a variance to install an additional sign
near the proposed south entrance.
Resolved
31 1 Sign Permits
Aliza Shalit
11/14/23 12:02 PM
Comment
Will murals be updated? If so, please include drawings with this review.
Responsed by: Dustin Myers - 2/12/24 2:28 PM
The updated building elevations include the existing
signage and murals, and which items shall be removed.
----------------------------------------------------------
Reviewer Response: Aliza Shalit - 1/22/24 4:37 PM
So all the murals shown on the newly uploaded photos
will be removed?
----------------------------------------------------------
Responsed by: Dustin Myers - 12/29/23 12:47 PM
It is intended to remove the existing murals.
Question
32 1 Planning & Zoning
Christina Jesse
11/14/23 12:14 PM
Changemark
Scale bar
Please include a scale bar to be compatible with ProjectDox.
A4.3.0 - Bldg Footprint.pdf Responsed by: Dustin Myers - 12/29/23 12:35 PM
bar scales have been added.
Resolved
33 1 Planning & Zoning
Christina Jesse
11/14/23 12:14 PM
Changemark
Windows
Please add proposed and existing windows to this plan.
A4.3.0 - Bldg Footprint.pdf Responsed by: Dustin Myers - 12/29/23 12:36 PM
the floor plans have been updated to show the
windows.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
34 1 Planning & Zoning
Christina Jesse
11/14/23 12:14 PM
Changemark
Egress and access
Please explore the opportunity of making a functional entry feature off of the
west facade by connecting this entrance to the main hallway.
A4.3.0 - Bldg Footprint.pdf Responsed by: Dustin Myers - 12/29/23 12:38 PM
a door has been added to the east elevation, along with
a canopy, to simulate an entry, however, this will be for
staff only as discussed.
Resolved
35 1 Planning & Zoning
Christina Jesse
11/14/23 12:14 PM
Changemark
Wall inquiry
Are the bubbled areas finished walls or partitions to divide the space when
desired?
A4.3.0 - Bldg Footprint.pdf Responsed by: Dustin Myers - 12/29/23 12:39 PM
the dashed lines represent where existing precast panel
construction will need to be removed during the
expansion.
Resolved
36 1 Planning & Zoning
Christina Jesse
11/14/23 12:14 PM
Changemark
Life safety plan
Please upload a life safety plan.
A4.3.0 - Bldg Footprint.pdf Responsed by: Dustin Myers - 12/29/23 12:45 PM
A life safety plan has been uploaded.
Resolved
37 1 Planning & Zoning
Christina Jesse
11/14/23 12:16 PM
Changemark
Scale bar
Please include a scale bar to be compatible with ProjectDox.
A4.1.0 - Elevations.pdf Responsed by: Dustin Myers - 12/29/23 12:45 PM
A bar scale has been provided on the updated plan
sheet.
Resolved
38 1 Planning & Zoning
Christina Jesse
11/14/23 12:16 PM
Changemark
Scale bar
Please include a scale bar to be compatible with ProjectDox.
A4.2.0 - Elevations.pdf Responsed by: Dustin Myers - 12/29/23 12:45 PM
A bar scale has been provided on the updated plan
sheet.
Resolved
39 1 Carmel_Clay Parks
Michael Klitzing
11/14/23 3:30 PM
Comment
Validating Harvest Church remains open to future public-private partnership
with Carmel Clay Parks & Recreation when we secure funds for development
of Thomas Marcuccilli Nature Park. Still interested in pursuing a trailhead and
restroom, paid by CCPR, on Harvest Church property. Exact layout and terms
would be negotiated at a later date, understanding it would need to be
mutually beneficial to both parties for an agreement to occur. Thanks!
Responsed by: Dustin Myers - 12/28/23 1:10 PM
The Church is interested in having discussions regarding
the future park and partnership with the City. Please
reach out to Mr. Marty Baker at 270-929-9137 or at
mbaker@harvestnorthindy.org.
Resolved
40 1 Planning & Zoning
Christina Jesse
11/14/23 4:04 PM
Changemark
Side setback
Please label the side setback distance from the nearest point of the proposed
addition to the nearest point of the southern property line.
C-300.0 SITE DIMENSION PLAN.pdf Responsed by: Dustin Myers - 12/28/23 4:52 PM
The setback dimension has been added.
Resolved
41 1 Planning & Zoning
Christina Jesse
11/14/23 4:05 PM
Changemark
Side setback
Please label the side setback distance from the nearest point of the existing
building to the nearest point of the northern property line.
C-300.0 SITE DIMENSION PLAN.pdf Responsed by: Dustin Myers - 12/28/23 4:53 PM
The setback dimension has been added.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
42 1 Planning & Zoning
Christina Jesse
11/14/23 4:05 PM
Changemark
Rear setback
Please label the rear setback distance from the nearest point of the existing
building to the nearest point of the western property line.
C-300.0 SITE DIMENSION PLAN.pdf Responsed by: Dustin Myers - 12/28/23 4:53 PM
The setback dimension has been added.
Resolved
43 1 Planning & Zoning
Christina Jesse
11/14/23 4:08 PM
Changemark
Light poles
Please verify if the proposed light poles match the design and height
installed on the north parcel in phase I.
C-1000.0 PHOTOMETRIC PLAN.pdf Responsed by: Dustin Myers - 12/28/23 4:54 PM
The proposed poles shall match the design and height
of the existing poles.
Resolved
44 1 Planning & Zoning
Christina Jesse
11/14/23 4:08 PM
Changemark
Footcandles at property line
Please revise photometric plan to not exceed the maximum allowable 0.5
foot-candles at the property line.
C-1000.0 PHOTOMETRIC PLAN.pdf Responsed by: Dustin Myers - 2/12/24 2:17 PM
A better version of the photometric plan has been
uploaded.
----------------------------------------------------------
Reviewer Response: Christina Jesse - 1/16/24 2:54 PM
Most recent photometric plan is not legible. Please
upload a version with a higher resolution. Thank you.
----------------------------------------------------------
Responsed by: Dustin Myers - 12/28/23 4:54 PM
The photometric plan has been updated to meet the
requirements.
Resolved
46 1 Planning & Zoning
Christina Jesse
11/14/23 4:14 PM
Changemark
Trash enclosure
Please verify if the new trash enclosure design will also be mirrored on the
existing parking lot to the north or if the existing trash enclosure is going to
be relocated to the proposed area.
C-400.0 UTILITY PLAN.pdf Responsed by: Dustin Myers - 2/7/24 5:27 PM
Yes, that is correct, it is intended to modify the existing
enclosure to mimic the materials of the proposed
enclosure.
----------------------------------------------------------
Reviewer Response: Christina Jesse - 1/16/24 2:33 PM
Please verify if the new design will be implemented on
the old dumpster location as well.
----------------------------------------------------------
Responsed by: Dustin Myers - 12/28/23 4:55 PM
It is proposed to install a new dumpster enclosure.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
47 1 Planning & Zoning
Christina Jesse
11/14/23 4:14 PM
Library Comment
Please show how rooftop equipment will be screened from view, if applicable
Responsed by: Dustin Myers - 12/29/23 12:49 PM
The rooftop equipment is being proposed to be placed
on the rooftop of the new worship center. The roof of
the new worship building will be below the top of the
pre-cast panels and this roof line also will be sloping
from east to west. The roof top equipment will be
placed accordingly to be out of view.
Resolved
48 1 Planning & Zoning
Christina Jesse
11/14/23 4:14 PM
Library Comment
Please provide architectural elevations of the proposed dumpster enclosure.
They must be architecturally compatible with the primary building.
Responsed by: Dustin Myers - 12/29/23 12:49 PM
Dumpster enclosure details have been uploaded.
Resolved
51 1 Engineering
Alex Jordan
11/15/23 9:18 AM
Library Comment
Please provide the sites zone district on the cover sheet
Responsed by: Dustin Myers - 12/28/23 1:49 PM
The title sheet has been updated to include the zoning
district.
Resolved
52 1 Engineering
Alex Jordan
11/15/23 9:18 AM
Library Comment
Please provide the setback distances on the cover sheet
Responsed by: Dustin Myers - 12/28/23 1:54 PM
The title sheet has been updated to include all setback
distances.
Resolved
53 1 Engineering
Alex Jordan
11/15/23 9:18 AM
Library Comment
Please provide the sites total disturbance on the cover sheet
Responsed by: Dustin Myers - 12/28/23 1:55 PM
The title sheet has been updated to include the total
disturbed area.
Resolved
54 1 Engineering
Alex Jordan
11/15/23 9:18 AM
Library Comment
Please provide a professional engineer's stamp on the plans
Responsed by: Dustin Myers - 12/28/23 1:56 PM
The stamp is included on the plan set.
Resolved
55 1 Engineering
Alex Jordan
11/15/23 9:18 AM
Library Comment
Please provide all technical information required by Section 102.02(xi)(m) of
the Storm Water Technical Standards
Responsed by: Dustin Myers - 12/28/23 2:43 PM
The drainage summary information has been added to
Sheet 500. Please note, some information isn't
applicable, as there isn't any onsite detention being
provided, as the site utilizes the detention/BMP facility
within the East basin of the Legacy development.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
56 1 Engineering
Alex Jordan
11/15/23 9:18 AM
Library Comment
Please provide the anticipated start construction date in a comment letter or
project summary
Responsed by: Dustin Myers - 12/28/23 2:44 PM
The anticipated start date has been added to the
summary table on the title sheet.
Resolved
57 1 Engineering
Alex Jordan
11/15/23 9:18 AM
Library Comment
Please provide the City's paving policy in the set
Responsed by: Dustin Myers - 12/28/23 2:44 PM
The paving policy can be found on sheet 900.
Resolved
58 1 Engineering
Alex Jordan
11/15/23 9:18 AM
Library Comment
Please provide the City's curbing policy in the set
Responsed by: Dustin Myers - 12/28/23 2:45 PM
The curbing policy can be found on sheet 900.
Resolved
59 1 Engineering
Alex Jordan
11/15/23 9:18 AM
Library Comment
Please verify that there are no direct discharge areas
Responsed by: Dustin Myers - 12/28/23 2:47 PM
There shall be some small grassed areas along the east
side of the proposed building that shall convey runoff
directly to the existing swale along the west side of
River Road. Additionally, the grass/landscape area east
of the parking lot, shall convey runoff to the existing
swale along the west side of River Road.
Resolved
60 1 Engineering
Alex Jordan
11/15/23 9:18 AM
Library Comment
Please verify that all elevations are North American Vertical Datum of 1988
(NAVD)
Responsed by: Dustin Myers - 12/28/23 2:49 PM
The benchmark information is identified in the plan set
and they utilize NAVD 88 datum
Resolved
61 1 Engineering
Alex Jordan
11/15/23 9:18 AM
Library Comment
Please verify that the horizontal datum of topgraphic map is Indiana State
Plane Coordinates, NAD83
Responsed by: Dustin Myers - 12/28/23 2:51 PM
The horizontal datum is in Indiana State Plane
coordinates.
Resolved
62 1 Engineering
Alex Jordan
11/15/23 9:18 AM
Library Comment
Please verify that the locations of existing utilities with top of curb and invert
elevations, pipe sizes, and direction are shown
Responsed by: Dustin Myers - 12/28/23 2:53 PM
This information is shown on Sheet 200.
Resolved
63 1 Engineering
Alex Jordan
11/15/23 9:18 AM
Library Comment
Please verify that all existing culverts, pipes, and bridges on existing drives or
under the roadway are shown indicating size, type, and invert elevations
Responsed by: Dustin Myers - 12/28/23 2:53 PM
This information is shown on Sheet 200.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
64 1 Engineering
Alex Jordan
11/15/23 9:18 AM
Library Comment
Please verify that the locations of all existing electrical power vaults,
transformers, power lines, gas lines, television cable , and telephone lines are
shown
Responsed by: Dustin Myers - 12/28/23 2:54 PM
This information is shown on Sheet 200.
Resolved
65 1 Planning & Zoning
Christina Jesse
11/15/23 9:37 AM
Changemark
Max occupancy
Please provide the maximum occupancy count for the addition as well as the
existing buildings.
A4.3.0 - Bldg Footprint.pdf Reviewer Response: Christina Jesse - 1/16/24 2:51 PM
----------------------------------------------------------
Responsed by: Dustin Myers - 12/29/23 10:15 AM
Existing building worship center = 920
classrooms = 190
lobby = 184
other = 13
Proposed max occupancy counts:
Worship center = 1100
lobby = 1000
classrooms = 154
offices = 50
the anticipated max occupancy, during & between
services, is 1,500
----------------------------------------------------------
Responsed by: Dustin Myers - 12/29/23 10:15 AM
Existing building worship center = 920
classrooms = 190
lobby = 184
other = 13
Resolved
66 1 Planning & Zoning
Christina Jesse
11/15/23 10:26 AM
Comment
Please confirm that 50 foot half right of way was dedicated for the entirety of
the parcel.
Responsed by: Dustin Myers - 12/28/23 4:59 PM
The 50' half RW was dedicated and recorded in
documents Instrument #2017-008770 & Instrument
#2017-029708
Resolved
67 1 Planning & Zoning
Christina Jesse
11/15/23 10:36 AM
Changemark
Bicycle parking
Please note the number of racks provided and highlight these locations on
the site plan - both existing and proposed.
C-300.0 SITE DIMENSION PLAN.pdf Responsed by: Dustin Myers - 12/29/23 10:44 AM
The proposed bicycle racks, and the existing racks, are
identified on the updated plans.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
68 1 Planning & Zoning
Christina Jesse
11/15/23 10:37 AM
Changemark
Parking analysis
Please revise to read requirement of 1 space per 250 sf of office use and
total required space count of 320
C-300.0 SITE DIMENSION PLAN.pdf Responsed by: Dustin Myers - 12/28/23 5:04 PM
The parking analysis table has been updated.
Resolved
69 1 Hamilton County
Surveyor
Samuel Clark
11/15/23 11:46 AM
Comment
SUBMIT PHYSICAL PLANS AND DRAINAGE CALCULATIONS AS WELL AS AN
OUTLET CONNECTION REQUEST TO OUR OFFICE FOR THE INDIRECT
CONNECTIONS TO THE TUNIS GARRARD REGULATED DRAIN
Info Only
70 1 Engineering
Alex Jordan
11/15/23 1:07 PM
Changemark
We require construction entrances to be only #2 stone, please remove the
#53 section
C-201.0 DEMOLITION AND PRE-
CONSTRUCTION SWPPP.pdf
Responsed by: Dustin Myers - 12/28/23 2:57 PM
The construction entrance detail has been updated.
Resolved
71 1 Engineering
Alex Jordan
11/15/23 1:14 PM
Changemark
Please provide inlet protection on the curb inlets on this sheet and the post-
construction SWPPP sheet
All inlet protection within the City's right-of-way must be completely below
the grate.
C-201.0 DEMOLITION AND PRE-
CONSTRUCTION SWPPP.pdf
Responsed by: Dustin Myers - 12/28/23 2:59 PM
The inlet protection has been added to existing River
Road inlets on both sheets.
Resolved
72 1 Engineering
Alex Jordan
11/15/23 1:21 PM
Changemark
Please show the underdrain in this cross-section
C-800.0 MISCELLANEOUS DETAILS.pdf Responsed by: Dustin Myers - 12/28/23 4:00 PM
The church has decided to utilize permeable pavers in
lieu of porous asphalt. The plans have been updated to
reflect the change.
Resolved
73 1 Engineering
Alex Jordan
11/15/23 1:27 PM
Changemark
Please show the ponding on this inlet in the clogged condition
C-501.0 FLOOD ROUTING PLAN.pdf Responsed by: Dustin Myers - 12/28/23 4:04 PM
The flood routing sheet has been updated.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
74 1 Engineering
Alex Jordan
11/15/23 1:34 PM
Changemark
Please clarify if this cross-section or the one provided on C 800 will be used
for the porous asphalt areas
C-600.0 DRAINAGE PLAN.pdf Responsed by: Dustin Myers - 2/7/24 5:05 PM
The detail on C600 is for the installation of the
underdrain within the permeable paver section (K1). The
underdrain, in certain locations as shown in the profile
view, will be below the total overall aggregate and paver
depth, therefore, requiring a trench with stone to be
installed, as needed, for the installation of the
underdrain. The details, on each sheet, are different in
their own way.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 1/23/24 8:27 AM
Thank you but it appears there is still a "permeable
paver underdrain detail" on C600 that does not match
the "permeable paver pavement section" on C800. One
shows a trench for the underdrain while the other does
not. Please clarify how this will be installed and remove
one of the details.
----------------------------------------------------------
Responsed by: Dustin Myers - 12/28/23 4:00 PM
The church has decided to utilize permeable pavers in
lieu of porous asphalt. The plans have been updated to
reflect the change.
Resolved
75 1 Engineering
Alex Jordan
11/15/23 1:52 PM
Changemark
The porous ashpalt and sumped structures will need to be placed within a
BMP easement
Please show this easement on this plan sheet and connect it to the City's
right-of-way with an access easement.
C-700.0 STORMWATER POLLUTION
PREVENTION PLAN.pdf
Responsed by: Dustin Myers - 12/28/23 4:22 PM
The easement has been added to the updated plans.
Resolved
77 1 Engineering
Alex Jordan
11/15/23 2:05 PM
Changemark
Please show the BMP and access easement over the BMPs on the site map
Harvest Church - Phase 2 O&M Manual
- 1.0.pdf
Responsed by: Dustin Myers - 12/28/23 4:39 PM
The easement has been added to the O&M manual
exhibits.
Resolved
78 1 Transportation
Systems
David Littlejohn
11/16/23 2:31 PM
Changemark
Bicycle parking total spaces provided
Section 5.29 of the City's UDO requires bicycle parking for assembly uses to
be provided at a rate of 2% of the maximum capacity of the building/facility
they serve. Revise the plans to include at least the minimum number of
bicycle parking spaces to comply with the City's bicycle parking
requirements.
C-300.0 SITE DIMENSION PLAN.pdf Responsed by: Dustin Myers - 12/29/23 10:20 AM
max occupancy, during & between services, is
anticipated to be 1,500, therefore, 30 bicycle parking
spaces have been implemented (20 proposed, 10
existing).
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
79 2 Planning & Zoning
Christina Jesse
1/16/24 2:56 PM
Comment
Please upload updated color elevations. Thank you!
Responsed by: Dustin Myers - 3/14/24 11:38 AM
Per the architect's email to you on March 4th, they
would like to bring you actual samples of the colors. Is
that acceptable?
----------------------------------------------------------
Reviewer Response: Christina Jesse - 2/27/24 10:15 AM
Please upload a new version as the most recent version
exterior colors appear yellow and red.
----------------------------------------------------------
Responsed by: Dustin Myers - 2/12/24 2:18 PM
Updated color elevations have been uploaded.
Resolved
80 2 Planning & Zoning
Christina Jesse
1/16/24 3:20 PM
Changemark
Front facade canopy
Enhance the design of the front canopy to reflect the design utilized on
other entrances with a flat roof and column support so this entrance can give
the appearance of a primary entry feature from River Road.
A4.2.0 - Elevations.pdf Responsed by: Dustin Myers - 3/14/24 11:38 AM
Please see attached revised elevations to reflect the east
entry in question to bring up to PUD requirements.
----------------------------------------------------------
Reviewer Response: Christina Jesse - 2/27/24 10:21 AM
The design of the front canopy needs to be revised as
previously requested as this is a requirement to adhere
to the PUD Architectural Requirements and address the
site's primary street. If this entrance cannot be
enhanced, we will need to return this project to the
Commercial Committee for approval.
----------------------------------------------------------
Responsed by: Dustin Myers - 2/12/24 2:20 PM
Harvest Church desires to match this entry to the
existing entry on the north side of the existing Admin
building which is how this is shown. This entry is
provided for staff due to the location this entry access.
It is not the desire to have focus on the entry for public
- that only the north main worship center entry and the
new south main worship center entry be utilized for the
public.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
81 2 Planning & Zoning
Christina Jesse
1/16/24 3:20 PM
Changemark
Adjoining point
Are the two buildings proposed to be adjoined with an open-air breezeway
in this updated design?
A4.2.0 - Elevations.pdf Responsed by: Dustin Myers - 2/12/24 2:22 PM
There will be an overhead canopy that matches the
existing canopies. It will not be a breezeway.
Resolved
82 2 Planning & Zoning
Christina Jesse
1/16/24 3:20 PM
Changemark
West elevation missing material
Please label the material used above the lobby windows.
A4.2.0 - Elevations.pdf Responsed by: Dustin Myers - 2/12/24 2:22 PM
This area to be segmented concrete spandrel panels in
cream color.
Resolved
83 2 Planning & Zoning
Christina Jesse
1/16/24 3:20 PM
Changemark
All elevations missing material
Please label the material used for the wainscoting on all elevations. Thank
you.
A4.2.0 - Elevations.pdf Responsed by: Dustin Myers - 3/14/24 11:39 AM
The wainscoting is part of the full precast concrete
panel and to be painted the light tan color and is noted
accordingly now on notes in the upper right corner of
each sheet (Material note A and H). All existing
diamond patterns will also be painted one light tan
color.
----------------------------------------------------------
Reviewer Response: Christina Jesse - 2/27/24 10:15 AM
Please add this label to each of the elevation prints.
Thank you.
----------------------------------------------------------
Responsed by: Dustin Myers - 2/12/24 2:23 PM
The wainscoting is part of the precast concrete panel
and it is desired that the wainscot portion of the panel
be painted a light creme color to match the existing
wainscot on the existing worship center building.
Resolved
84 2 Planning & Zoning
Christina Jesse
1/16/24 3:27 PM
Changemark
North elevation missing material
Please label the material used above the lobby/open area windows.
A4.1.0 - Elevations.pdf Responsed by: Dustin Myers - 2/12/24 2:24 PM
The areas will be segmented concrete spandrel panels in
creme color & ribbed metal panels.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
85 2 Planning & Zoning
Christina Jesse
1/16/24 3:27 PM
Changemark
Remove diamond pattern
If the diamond pattern does not wish to be included in the new design,
please enhance this area with a new material or style as this now looks
obscure on its own.
A4.1.0 - Elevations.pdf Responsed by: Dustin Myers - 3/14/24 11:39 AM
All existing diamond patterns will also be painted one
light tan color.
----------------------------------------------------------
Reviewer Response: Christina Jesse - 2/27/24 10:32 AM
Please show this on a new version of the color
elevations. Thank you.
----------------------------------------------------------
Responsed by: Dustin Myers - 2/12/24 2:25 PM
Our plan is to have the existing diamond pattern panels
be painted all one color to de-emphasize the diamond
pattern. The proposed color is a creme color just
slightly darker than the creme color of the wainscot.
Resolved
86 2 Planning & Zoning
Christina Jesse
1/16/24 3:27 PM
Changemark
Front facade canopy
Enhance the design of the front canopy to reflect the design utilized on
other entrances with a flat roof and column support so this entrance can give
the appearance of a primary entry feature from River Road.
A4.1.0 - Elevations.pdf Responsed by: Dustin Myers - 3/14/24 11:40 AM
Please see attached revised elevations to reflect the east
entry in question to bring up to PUD requirements.
----------------------------------------------------------
Reviewer Response: Christina Jesse - 2/27/24 10:23 AM
The design of the front canopy needs to be revised as
previously requested as this is a requirement to adhere
to the PUD Architectural Requirements and address the
site's primary street. If this entrance cannot be
enhanced, we will need to return this project to the
Commercial Committee for approval.
----------------------------------------------------------
Responsed by: Dustin Myers - 2/12/24 2:26 PM
Harvest Church desires to match this entry to the
existing entry on the north side of the existing Admin
building which is how this is shown. This entry is
provided for staff due to the location this entry access.
It is not the desire to have focus on the entry for public
- that only the north main worship center entry and the
new south main worship center entry be utilized for the
public.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
87 2 Planning & Zoning
Christina Jesse
1/16/24 3:27 PM
Changemark
All elevations missing material
Please label the material used for the wainscoting on all elevations. Thank
you.
A4.1.0 - Elevations.pdf Responsed by: Dustin Myers - 3/14/24 11:40 AM
The wainscoting is part of the full pre cast concrete
panel and to be painted the light tan color and is noted
accordingly now on notes in the upper right corner of
each sheet (Material note A and H). All existing
diamond patterns will also be painted one light tan
color.
----------------------------------------------------------
Reviewer Response: Christina Jesse - 2/27/24 10:20 AM
Please add this label to each of the elevation prints.
Thank you.
----------------------------------------------------------
Responsed by: Dustin Myers - 2/12/24 2:26 PM
The wainscoting is part of the precast concrete panel
and it is desired that the wainscot portion of the panel
be painted a light creme color to match the existing
wainscot on the existing worship center building.
Resolved
88 2 Planning & Zoning
Christina Jesse
1/16/24 3:30 PM
Changemark
Landscaping around transformer
Please consider adding some shrubs or tall grasses to screen the view of the
transformer from River Road.
L-1.0.0 LANDSCAPE PLAN.pdf Responsed by: Dustin Myers - 2/7/24 5:27 PM
Additional plantings have been added to help screen
the existing transformer.
Resolved
89 2 Engineering
Alex Jordan
1/23/24 10:22 AM
Changemark
Please clarify which cross-section will be used and place it in the O&M
Harvest Church - Phase 2 O&M Manual
- 1.0.pdf
Responsed by: Dustin Myers - 2/7/24 5:06 PM
The detail on C600 is for the installation of the
underdrain within the permeable paver section (K1). The
underdrain, in certain locations as shown in the profile
view, will be below the total overall aggregate and paver
depth, therefore, requiring a trench with stone to be
installed, as needed, for the installation of the
underdrain. The details, on each sheet, are different in
their own way.
Resolved
90 2 Engineering
Alex Jordan
1/23/24 10:30 AM
Comment
Please provide a detail for the type of paver that will be used. This will need
to be included in the plans and the O&M manual.
Responsed by: Dustin Myers - 2/12/24 5:31 PM
Details for the permeable pavers have been added to
the plans and O&M Manual.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00254 ADLS Amend - Harvest Church Addition
Workflow Started: 10/27/2023 9:22:10 AM
Report Generated: 03/29/2024 12:29 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
91 2 Engineering
Alex Jordan
1/23/24 10:30 AM
Comment
Please provide an erosion control engineers estimate with the next submittal
in order to expedited the final submittal list.
Info Only
92 3 Engineering
Alex Jordan
2/14/24 2:51 PM
Comment
We have no further comments on the plans. Before we can issue a
stormwater management permit, the following items will need to be
submitted: 1. A signed and recorded O&M manual 2. A non-expiring erosion
control performance bond for 100% of the approved estimate 3. A
completed BMP easement agreement with exhibit and legal description 4. A
right-of-way permit application and $5,000 license and permit bond (this can
be applied for here: https://cw.carmel.in.gov/PublicAccess/login)
Info Only