Loading...
HomeMy WebLinkAbout02-PLANTING-L200IIIIIIIIIFLORA PLACE (PUBLIC) SUNBRANCH LANE (PRIVATE) SUNBRANCH LANE (PRIVATE) REDBUD STREET (PUBLIC) GREENVINE DRIVE (PRIVATE) REDBUD STREET (PUBLIC) GREENVINE DRIVE (PRIVATE) GREENERY DRIVE (PUBLIC) GREENERY DRIVE (PUBLIC)GREENERY DRIVE (PUBLIC)GREENERY WAY (PRIVATE)GREENERY DRIVE (PUBLIC)GREENERY STREET (PRIVATE)FLORA PLACE (PUBLIC)SUNBRANCH DRIVE (PRIVATE)REDBUD DRIVE (PRIVATE)ELDERBERRY LANE (PUBLIC) GREENVINE DRIVE (PRIVATE)ELDERBERRY DRIVE (PRIVATE) GREENER Y D R I V E ( P U B L I C ) FLORA PLACE (PUBLIC) 3 2 4 5 1 15' Bufferyard 15' Bufferyard 15' Bufferyard 10' Bufferyard10' BufferyardSHEET L202 SHEET L204 SHEET L205 SHEET L203SHEET L201 %KNQ@ Carmel, Indiana OMXW @MC E@RS 1828 N. Central Ave., Ste. 100 Indianapolis, IN 46202 PREPARED FOR PROJECT NORTH ©2021 Anderson + Bohlander, LLC 1054 Virginia Ave, Suite 210 Indianapolis, Indiana 46203 www.andersonbohlander.com ADLS November 28, 2022 REVISIONS No.Date Issue DRAWN BY: CHECKED BY: SHEET TITLE SHEET NUMBER CAR/DMM JDA SCALE :1" = 50'-0"25'-0"50'-0"100'-0"L200 PLANTING PLAN - OVERALL LEGEND Ornamental tree, typical Shrubs, typical Perennials, Ornamental Grasses, & Groundcover, typical Evergreen Shrubs, typical Canopy tree, typical Turf Grass Evergreen tree, typical NOTES - PLANTING PLAN 1.Contractor shall import and distribute soil for all planting areas to average depth of 12" to achieve the grades as shown on the plans. 2.Sod limit line is approximate. Sod to limits of grading and construction related disturbance. Contractor responsible for restoration of any unauthorized disruption outside of designated construction area. 3.Contractor responsible for erosion control in all seeded and/or sodded areas. All disturbed areas are to be protected within 24 hours. Do not disturb more area than can be completed and protected within 24 hours. 4.Temporary fencing shall be installed around the lawn areas if the project is opened to the public before the lawn is established. 5.All existing trees within the project limits determined to be interfering with construction activity to be pruned by a certified arborist as directed by the Landscape Architect. 6.The General Contractor shall be responsible for replacing any existing trees that the Landscape Architect determines to have been damaged during construction, at no additional cost. 7.All bed lines are to be spade cut to a minimum depth of 3 inches unless otherwise shown on the plans. Curved bedlines are to be smooth and not segmented. Refer to Planting Bed Edge Condition, Detail 02, Sheet L206. 8.Contractor to restore 3" of shredded hardwood mulch to all areas of construction disturbance within existing landscape beds. Contractor to remove and dispose of all debris, stones and dirt clods 1" or larger. 9.Plants and other materials are quantified and summarized for the convenience of the Owner and jurisdictional agencies only. Confirm and install sufficient quantities to complete the work as drawn and specified. No additional payments will be made for materials required to complete the work as drawn and specified. 10.Refer to specifications for additional conditions, standards and notes. 11.Contractor responsible for initial planting of annuals in all planter pot locations. Plants to be seasonally appropriate to time of planting. Submit plant selection for review by Landscape Architect. 12.See Sheet L206 for Plant List. NOTES - TREE PRESERVATION Full Tree Preservation Area 3.86 Acres 21.88% Improved Tree Planting Area 0.12 Acres 0.68% Limited Tree Preservation Area 0.20 Acres 1.15% AREA PERCENTAGE OF SITEPRESERVATION TYPESYMBOL Open Space Area 7.31 Acres 41.47%