HomeMy WebLinkAboutROOFTOP DECK TOWNHOME A3-06ELEVATION GEN. NOTES
TYP
TYP
TYP
TYP
TYP
142'-5 1/4"
T.O. ROOF
136'-7"
T.O. PARAPET
128'-11"
TRUSS BEARING
127'-4"
T.O. WINDOW
119'-10"
THIRD FLOOR
TYP,
142'-5 1/4"
T.O. ROOF
136'-1"
T.O. PARAPET
128'-11"
TRUSS BEARING
127'-4"
T.O. WINDOW
119'-10"
THIRD FLOOR
1. DO NOT SCALE DRAWINGS.
2. REFER TO FLOOR PLANS FOR ALL WALL ASSEMBLY DESIGNATIONS AND LOCATIONS
OF TYPICAL WALL SECTIONS.
3. MEP PENETRATIONS ARE NOT SHOWN. SEE MEP DRAWINGS FOR ACTUAL
LOCATIONS AND TYPES.
4. ALL MASONRY COURSING SHALL BE RUNNING BOND UNLESS NOTED OTHERWISE.
5. SEE KEYNOTES FOR MASONRY TYPES.
6. ALL COLORS TO BE SELECTED AND APPROVED BY ARCHITECT FROM
MANUFACTURER'S STANDARDS.
7, ALL NON-PREFINISHED EXTERIOR ITEMS SHALL BE PAINTED WITH ONE COAT OF
TINTED PRIMER AND ONE COAT OF FINISH PAINT.
8. PAINT ALL MECHANICAL PENETRATIONS TO MATCH ADJACENT SURFACE.
9. INSTALL PREFINISHED METAL DRIP EDGE ABOVE ALL HORIZONTAL TRIM BOARDS,
INCLUDING AT HEADS OF DOORS AND WINDOWS. DO NOT CAULK ABOVE.
10. AT PAINTED BRICK, HAND ROLL PRIMER WITH 3/4" NAP ROLLER. SPRAY ON TWO
COATS OF FINISHED PAINT, FLAT FINISH.
11. DOWNSPOUTS MAY NOT BE SHOWN. SEE ROOF PLANS FOR LOCATIONS.
12. CAULK ALL JOINTS. UNPAINTED CAULK SHALL BE PREFINISHED TO MATCH ADJACENT
MATERIALS.
13. ALL SIDING AND TRIM SHALL BE SMOOTH. NO TEXTURED SIDING OR TRIM ALLOWED.
>k INDICATES SAFETY GLAZING.
-L-V TI N I- '( NOTEc
II I i
P 5 - lO MODULAR SIZE BRICK.
116'-11 i I i I i i 116-11"
2 6.25" FIBER CEMENT COMPOSITE LAP SIDING, SMOOTH FINISH, PAINT.
T.O. WINDOW P s i❑ i i i T.O. WINDOW qv
CONC. PORCH AND STEPS. 1/4" RADIUS EDGES. BUFF FACES SMOOTH AFTER
I I I I I I I I I I I
I I I I❑❑ I I I� � I I I� ❑ � I� I ❑ I REMOVING FORMS.
I I I I I I I I ___ I I I I I I I I I
21 O4 FIBER CEMENT BOARD AND BATTEN, SMOOTH FINISH. 2.5" BATTENS.
_ - 109'-4 1/4" 109'-4 1/4" PAINT ALL SAME COLOR.
SECOND FLOOR SECOND FLOOR O5 2.5" X 4/4 HARDIETRIM AT PERIMETER OF OPENING, SMOOTH FINISH, PAINT TRIM
106'-10" 1 106'-10" COLOR. CAULK ALL EDGES
T.O. WINDOW/DOOR T.O. WINDOW/DOOR O6 8.25" FIBER CEMENT COMPOSITE LAP SIDING, SMOOTH FINISH, PAINT.
El
TYP. to- 4
05.5" X 4/4 HARDIETRIM SMOOTH FINISH. PAINT TRIM COLOR.
E Rm��
100'-0" 100'-0" O8 7.25" X 4/4 HARDIETRIM, SMOOTH FINISH, PAINT TRIM COLOR
€ FIRST FLOOR FIRST FLOOR
O9 6" TALL METAL ADDRESS NUMBERS STUD MOUNTED TO EXTERIOR CLADDING. FONT
. . . ... . . . . . till AND METAL FINISH TO BE SELECTED BY OWNER. SEE CIVIL DRAWINGS FOR CORRECT
ADDRESSES.
NP.19 4 15 3
VARIES 6 3 VARIES 10 3.5"X4/4 HARDIETRIM AT WALL CORNERS AND EDGES OF LAP SIDING, SMOOTH,
GRADE GRADE PAINT TRIM COLOR. CAULK ALL EDGES.
11 PRECAST MASONRY UNIT, 8"X24".
12 11.25" X 4/4 HARDIETRIM, SMOOTH, PAINT COLOR TRIM COLOR.
13 7.25" X 4/4 SMOOTH HARDIETRIM FASCIA. PAINT TRIM COLOR.
14 WOOD FRAMED PORCH/BALCONY WRAPPED IN HARDIETRIM, SMOOTH FINISH. PAINT
COLOR "C".
41 i I v' 1 - ;1 ��� 15 BRICK ROWLOCK SILL.
C�1
E-`--1 1 L D I N LEFT ELE"ATKIN
142'-5 1/4"
T.O. ROOF
10 TYP.
7
7 136'-7"
T.O. PARAPET
128'-11"
TRUSS BEARING
127'-4"
T.O. WINDOW
119'-10"
THIRD FLOOR
116'-11"
T.O. WINDOW
' 40 109'-4 1/4"
SECOND FLOOR
106'-10"
T.O. WINDOW/DOOR
100'-0"
FIRST FLOOR IV
TYP.
VARIES
GRADE
109
TYP
ml tim- _ 11111m®
E3
m
BUILDING 23 - BACK ELE1ATI��N
11 = 11-011
E3
So
=k
rl
16
PREFINISHED ANODIZED ALUMINUM RAILING SYSTEM, 36 TALL, BLACK COLOR, 1
1 /2" SQUARE TUBE RAILS AND POSTS WITH 3/4" SQUARE VERTICAL PICKETS WITH
MAXIMUM 3 3/4" OPENINGS.
17
VINYL WINDOW, TYPICAL. COLOR "F".
18
19
PREFINISHED ALUM. GUTTER/SCUPPER, MATCH COLOR "C".
PREFINISHED ALUM. DOWNSPOUT, MATCH COLOR "C". TIE INTO PERIMETER DRAIN
20
WITH PVC BOOT. NOT ALL MAY BE SHOWN, SEE ROOF PLANS FOR LOCATIONS.
DIMENSIONAL ARCHITECTURAL SHINGLES, COLOR
21
METAL WRAPPED CANOPY WITH TIE -RODS AND BRACKETS, COLOR "H". MAXIMUM 48"
LONG PIECES WITH STRAPS OVER JOINTS, PAINT ALL NON-PREFINISHED ITEMS.
22
1 1/2" SQUARE PREFINISHED "BLACK" ANODIZED ALUMINUM HANDRAIL AT 36"
ABOVE NOSINGS FROM JUST BEYOND TOP RISER TO JUST BEYOND BOTTOM RISER.
CORE DRILL AND GROUT IN PLACE. ONE PER STAIR.
23
LIGHT FIXTURE. SEE ELECTRIC DRAWINGS.
24
CONTROL JOINT IN COLOR TO MATCH GROUT, FROM BOTTOM TO TOP OF MASONRY.
25
PREFINISHED METAL COPING, MATCH COLOR "C".
26
OVERHEAD DOOR. SEE DOOR SCHEDULE. PAINT COLOR "B".
27
PREFINISHED METAL FLASHING OVER TOP OF MASONRY, WITH DRIP EDGE,
142'-5 1/4"
28
MATCH COLOR "C"
12" PRECAST BAND, ONE FULL PIECE.
T.O. ROOF
29
4" TALL MASONRY BAND, OUT -SET 1".
136'-7°
30
BRICK/MASONRY BAND, OUT -SET 1". SAME BRICK AS FIELD BRICK.
T.O. PARAPET
136'-1" J,
31
VERTICAL CORRUGATED ALUMINUM SIDING PANEL, ATAS INTERNATIONAL, INC. - BWC374.
T.O. PARAPET
32
BRICK SOLDIER COURSE HEAD.
128'-11"
33
STANDING SEAM METAL ROOF, ATAS INTERNATIONAL, INC. - PREFINISHED COLOR "H".
TRUSS BEARING
34
PREFINISHED CHIMNEY CAP, MATCH COLOR "C".
127'-4"
35
ENTRY DOOR. PAINT COLOR "G".
T.O. WINDOW
36
ENTRY DOOR PAINTED COLOR "G". FRAME PREFINISHED "DARK BRONZE".
37
10 3/4" TALL X 16" WIDE CAST STONE PANEL WITH "EST. 2019" ENGRAVED ON
IT. FONT TO BE SELECTED BY OWNER.
119'-10"
38
ALIGN TOP OF DOOR WITH TOP OF WINDOWS. DOOR SILL WILL NOT BE FLUSH
THIRD FLOOR
WITH INTERIOR FLOOR.
39
TPO ROOF. SEE ROOF PLAN.
116'-11"
T.O. WINDOW
40
PREFINISHED METAL FLASHING OVER 11.25"X4/4 HARDIETRIM, SMOOTH, PAINT TRIM
COLOR.
41
6" OVERHANG WITH PREFINISHED METAL DRIP EDGE OVER 4/47.25" HARDIETRIM
FASCIA, PAINT TRIM COLOR.
109'-4 1/4°
42
FIBER CEMENT BOARD AND BATTEN. SMOOTH FINISH. 2.5" BATTEN STRIPS,
INCLUDING CORNERS. PAINT ALL SAME COLOR.
SECOND FLOOR
106'-10"
43
6" STONE HEAD.
T.O. WINDOW/DOOR
100'-0"
FIRST FLOOR
VARIES
GRADE
' ' 0 4= ► ='
ROTTMRnn j COLLIER
ARCHITECTS
155 EAST MARKET STREET
SECOND FLOOR, SUITE 200
INDIANAPOLIS, INDIANA 46204
T 317.721.2724
ROTTMANNCOLLIER.COM
PRELIMINARY
NOT FOR
CON 7JRUCTION
SCOPE DOCUMENT
THESE DOCUMENTS INDICATE THE GENERAL
SCOPE OF THE PROJECT IN TERMS OF
ARCHITECTURAL DESIGN CONCEPT, DIMENSIONS
OF THE BUILDING, MAJOR ARCHITECTURAL
ELEMENTS AND TYPE OF STRUCTURAL,
MECHANICAL AND ELECTRICAL SYSTEMS. THE
DRAWINGS DO NOT NECESSARILY INDICATE OR
DESCRIBE ALL WORK REQUIRED FOR FULL
PERFORMANCE AND COMPLETION OF THE
REQUIREMENTS OF THE CONTRACT. ON THE
BASIS OF THE GENERAL SCOPE INDICATED OR
DESCRIBED, TRADE CONTRACTOR SHALL
FURNISH ALL ITEMS REQUIRED FOR PROPER
EXECUTION AND COMPLETION OF THE WORK
01����_ ■ / \� TM
RamanPartne
L
W
0
Q
0
J
Q
0
J
J
Z
La2N
O Z
O
- 1
0
La
a
Q
®
W
W
W
p
Z O
J
z
��
W
0
z
Z)o
2-1
H
m
N V
N
I..L
W
Z
O
0
Q
Z
J
J
U-
0
0
0.
REVISIONS
2022-06-15 CARMEL ADLS
BUILDING 23
EXTERIOR
ELEVATIONS
PROJECT NO 21145-001
BUILD16��� � -RIGHT ELEVATION
l 11 = ,ll-n,11
BUILDIN FRONT ELEVATION
1/811 = 11-011
DATE 2022-06-15
SHEET
A3-6