Loading...
HomeMy WebLinkAboutROOFTOP DECK TOWNHOME A3-06ELEVATION GEN. NOTES TYP TYP TYP TYP TYP 142'-5 1/4" T.O. ROOF 136'-7" T.O. PARAPET 128'-11" TRUSS BEARING 127'-4" T.O. WINDOW 119'-10" THIRD FLOOR TYP, 142'-5 1/4" T.O. ROOF 136'-1" T.O. PARAPET 128'-11" TRUSS BEARING 127'-4" T.O. WINDOW 119'-10" THIRD FLOOR 1. DO NOT SCALE DRAWINGS. 2. REFER TO FLOOR PLANS FOR ALL WALL ASSEMBLY DESIGNATIONS AND LOCATIONS OF TYPICAL WALL SECTIONS. 3. MEP PENETRATIONS ARE NOT SHOWN. SEE MEP DRAWINGS FOR ACTUAL LOCATIONS AND TYPES. 4. ALL MASONRY COURSING SHALL BE RUNNING BOND UNLESS NOTED OTHERWISE. 5. SEE KEYNOTES FOR MASONRY TYPES. 6. ALL COLORS TO BE SELECTED AND APPROVED BY ARCHITECT FROM MANUFACTURER'S STANDARDS. 7, ALL NON-PREFINISHED EXTERIOR ITEMS SHALL BE PAINTED WITH ONE COAT OF TINTED PRIMER AND ONE COAT OF FINISH PAINT. 8. PAINT ALL MECHANICAL PENETRATIONS TO MATCH ADJACENT SURFACE. 9. INSTALL PREFINISHED METAL DRIP EDGE ABOVE ALL HORIZONTAL TRIM BOARDS, INCLUDING AT HEADS OF DOORS AND WINDOWS. DO NOT CAULK ABOVE. 10. AT PAINTED BRICK, HAND ROLL PRIMER WITH 3/4" NAP ROLLER. SPRAY ON TWO COATS OF FINISHED PAINT, FLAT FINISH. 11. DOWNSPOUTS MAY NOT BE SHOWN. SEE ROOF PLANS FOR LOCATIONS. 12. CAULK ALL JOINTS. UNPAINTED CAULK SHALL BE PREFINISHED TO MATCH ADJACENT MATERIALS. 13. ALL SIDING AND TRIM SHALL BE SMOOTH. NO TEXTURED SIDING OR TRIM ALLOWED. >k INDICATES SAFETY GLAZING. -L-V TI N I- '( NOTEc II I i P 5 - lO MODULAR SIZE BRICK. 116'-11 i I i I i i 116-11" 2 6.25" FIBER CEMENT COMPOSITE LAP SIDING, SMOOTH FINISH, PAINT. T.O. WINDOW P s i❑ i i i T.O. WINDOW qv CONC. PORCH AND STEPS. 1/4" RADIUS EDGES. BUFF FACES SMOOTH AFTER I I I I I I I I I I I I I I I❑❑ I I I� � I I I� ❑ � I� I ❑ I REMOVING FORMS. I I I I I I I I ___ I I I I I I I I I 21 O4 FIBER CEMENT BOARD AND BATTEN, SMOOTH FINISH. 2.5" BATTENS. _ - 109'-4 1/4" 109'-4 1/4" PAINT ALL SAME COLOR. SECOND FLOOR SECOND FLOOR O5 2.5" X 4/4 HARDIETRIM AT PERIMETER OF OPENING, SMOOTH FINISH, PAINT TRIM 106'-10" 1 106'-10" COLOR. CAULK ALL EDGES T.O. WINDOW/DOOR T.O. WINDOW/DOOR O6 8.25" FIBER CEMENT COMPOSITE LAP SIDING, SMOOTH FINISH, PAINT. El TYP. to- 4 05.5" X 4/4 HARDIETRIM SMOOTH FINISH. PAINT TRIM COLOR. E Rm�� 100'-0" 100'-0" O8 7.25" X 4/4 HARDIETRIM, SMOOTH FINISH, PAINT TRIM COLOR € FIRST FLOOR FIRST FLOOR O9 6" TALL METAL ADDRESS NUMBERS STUD MOUNTED TO EXTERIOR CLADDING. FONT . . . ... . . . . . till AND METAL FINISH TO BE SELECTED BY OWNER. SEE CIVIL DRAWINGS FOR CORRECT ADDRESSES. NP.19 4 15 3 VARIES 6 3 VARIES 10 3.5"X4/4 HARDIETRIM AT WALL CORNERS AND EDGES OF LAP SIDING, SMOOTH, GRADE GRADE PAINT TRIM COLOR. CAULK ALL EDGES. 11 PRECAST MASONRY UNIT, 8"X24". 12 11.25" X 4/4 HARDIETRIM, SMOOTH, PAINT COLOR TRIM COLOR. 13 7.25" X 4/4 SMOOTH HARDIETRIM FASCIA. PAINT TRIM COLOR. 14 WOOD FRAMED PORCH/BALCONY WRAPPED IN HARDIETRIM, SMOOTH FINISH. PAINT COLOR "C". 41 i I v' 1 - ;1 ��� 15 BRICK ROWLOCK SILL. C�1 E-`--1 1 L D I N LEFT ELE"ATKIN 142'-5 1/4" T.O. ROOF 10 TYP. 7 7 136'-7" T.O. PARAPET 128'-11" TRUSS BEARING 127'-4" T.O. WINDOW 119'-10" THIRD FLOOR 116'-11" T.O. WINDOW ' 40 109'-4 1/4" SECOND FLOOR 106'-10" T.O. WINDOW/DOOR 100'-0" FIRST FLOOR IV TYP. VARIES GRADE 109 TYP ml tim- _ 11111m® E3 m BUILDING 23 - BACK ELE1ATI��N 11 = 11-011 E3 So =k rl 16 PREFINISHED ANODIZED ALUMINUM RAILING SYSTEM, 36 TALL, BLACK COLOR, 1 1 /2" SQUARE TUBE RAILS AND POSTS WITH 3/4" SQUARE VERTICAL PICKETS WITH MAXIMUM 3 3/4" OPENINGS. 17 VINYL WINDOW, TYPICAL. COLOR "F". 18 19 PREFINISHED ALUM. GUTTER/SCUPPER, MATCH COLOR "C". PREFINISHED ALUM. DOWNSPOUT, MATCH COLOR "C". TIE INTO PERIMETER DRAIN 20 WITH PVC BOOT. NOT ALL MAY BE SHOWN, SEE ROOF PLANS FOR LOCATIONS. DIMENSIONAL ARCHITECTURAL SHINGLES, COLOR 21 METAL WRAPPED CANOPY WITH TIE -RODS AND BRACKETS, COLOR "H". MAXIMUM 48" LONG PIECES WITH STRAPS OVER JOINTS, PAINT ALL NON-PREFINISHED ITEMS. 22 1 1/2" SQUARE PREFINISHED "BLACK" ANODIZED ALUMINUM HANDRAIL AT 36" ABOVE NOSINGS FROM JUST BEYOND TOP RISER TO JUST BEYOND BOTTOM RISER. CORE DRILL AND GROUT IN PLACE. ONE PER STAIR. 23 LIGHT FIXTURE. SEE ELECTRIC DRAWINGS. 24 CONTROL JOINT IN COLOR TO MATCH GROUT, FROM BOTTOM TO TOP OF MASONRY. 25 PREFINISHED METAL COPING, MATCH COLOR "C". 26 OVERHEAD DOOR. SEE DOOR SCHEDULE. PAINT COLOR "B". 27 PREFINISHED METAL FLASHING OVER TOP OF MASONRY, WITH DRIP EDGE, 142'-5 1/4" 28 MATCH COLOR "C" 12" PRECAST BAND, ONE FULL PIECE. T.O. ROOF 29 4" TALL MASONRY BAND, OUT -SET 1". 136'-7° 30 BRICK/MASONRY BAND, OUT -SET 1". SAME BRICK AS FIELD BRICK. T.O. PARAPET 136'-1" J, 31 VERTICAL CORRUGATED ALUMINUM SIDING PANEL, ATAS INTERNATIONAL, INC. - BWC374. T.O. PARAPET 32 BRICK SOLDIER COURSE HEAD. 128'-11" 33 STANDING SEAM METAL ROOF, ATAS INTERNATIONAL, INC. - PREFINISHED COLOR "H". TRUSS BEARING 34 PREFINISHED CHIMNEY CAP, MATCH COLOR "C". 127'-4" 35 ENTRY DOOR. PAINT COLOR "G". T.O. WINDOW 36 ENTRY DOOR PAINTED COLOR "G". FRAME PREFINISHED "DARK BRONZE". 37 10 3/4" TALL X 16" WIDE CAST STONE PANEL WITH "EST. 2019" ENGRAVED ON IT. FONT TO BE SELECTED BY OWNER. 119'-10" 38 ALIGN TOP OF DOOR WITH TOP OF WINDOWS. DOOR SILL WILL NOT BE FLUSH THIRD FLOOR WITH INTERIOR FLOOR. 39 TPO ROOF. SEE ROOF PLAN. 116'-11" T.O. WINDOW 40 PREFINISHED METAL FLASHING OVER 11.25"X4/4 HARDIETRIM, SMOOTH, PAINT TRIM COLOR. 41 6" OVERHANG WITH PREFINISHED METAL DRIP EDGE OVER 4/47.25" HARDIETRIM FASCIA, PAINT TRIM COLOR. 109'-4 1/4° 42 FIBER CEMENT BOARD AND BATTEN. SMOOTH FINISH. 2.5" BATTEN STRIPS, INCLUDING CORNERS. PAINT ALL SAME COLOR. SECOND FLOOR 106'-10" 43 6" STONE HEAD. T.O. WINDOW/DOOR 100'-0" FIRST FLOOR VARIES GRADE ' ' 0 4= ► =' ROTTMRnn j COLLIER ARCHITECTS 155 EAST MARKET STREET SECOND FLOOR, SUITE 200 INDIANAPOLIS, INDIANA 46204 T 317.721.2724 ROTTMANNCOLLIER.COM PRELIMINARY NOT FOR CON 7JRUCTION SCOPE DOCUMENT THESE DOCUMENTS INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPT, DIMENSIONS OF THE BUILDING, MAJOR ARCHITECTURAL ELEMENTS AND TYPE OF STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS. THE DRAWINGS DO NOT NECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED OR DESCRIBED, TRADE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR PROPER EXECUTION AND COMPLETION OF THE WORK 01����_ ■ / \� TM RamanPartne L W 0 Q 0 J Q 0 J J Z La2N O Z O - 1 0 La a Q ® W W W p Z O J z �� W 0 z Z)o 2-1 H m N V N I..L W Z O 0 Q Z J J U- 0 0 0. REVISIONS 2022-06-15 CARMEL ADLS BUILDING 23 EXTERIOR ELEVATIONS PROJECT NO 21145-001 BUILD16��� � -RIGHT ELEVATION l 11 = ,ll-n,11 BUILDIN FRONT ELEVATION 1/811 = 11-011 DATE 2022-06-15 SHEET A3-6