Loading...
HomeMy WebLinkAboutErosion Control DetailsREVISION BLOCK C4.0 Sheet No. : Project Number: Bordenet Civil Engineering & Land Surveying, LLC Ph. 317-536-6181 8902 Alibeck Ct. Indianapolis, IN 46256 2023-268 C4.0 GENERAL NOTES FINAL CONSTRUCTION PLANS Site Engineer: Regulatory Agency: Owner: Plan Date: September 17th, 2023 Weston Pointe Big Red Liquors Site Plans 4350 Weston Pointe Drive Carmel, Indiana Big Red Liquors & TWG Development Dustin Detzler Ph. 317-523-299 1301 East Washington St.,Ste. 100 Indianapolis, IN 46202 Bordenet Civil Engineering & Land Surveying, LLC D. Scott Bordenet Ph. 317-840-6532 8902 Alibeck Ct. Indianapolis, IN 46256 Dept. of Community Services Ph. 317-571-2417 Carmel City Hall One Civic Square Carmel, IN 46032 SILT FENCE BARRIER DETAILS (SF) STABLE CONSTRUCTION ENTRANCE DETAILS (SC)PERMANENT SEEDING DETAILS (PS) INLET PROTECTION IN PAVEMENT (IP) Ô Ô SOILS MAP ”””””” ” ’ CONCRETE WASHOUT (CW) EROSION CONTROL PLAN GENERAL NOTES EROSION CONTROL DETAILS PERIMETER CONTROL: Place Siltworm directly on top of grade, and overlap ends a minimum of 6". Site preparation is minimal, and there is no staking or trenching requirement for grades under 12%. Arrange the Siltworm perimeter control in a manner that is applied perpendicular to sheet flow. Ensure ground contact. MAINTENANCE: Siltworm shall be inspected after each runoff event and shall be removed and replaced if signs of undercutting or downstream spacing rills are observed. Sediment shall be removed from behind the siltworm when it has accumulated to 1/2 of the original height of the structure. REMOVAL: Siltworm should be removed from slopes after stabilization is complete. This may be accomplished by cutting the Siltworm open and spreading the fill material on the site. Siltworm applied in ditch shall be completely removed. SILT WORM PERIMETER CONTROL SPECIFICATIONS (CL) 89'x53' 4,664± SFT. BUILDING FFE 906.90 YbvA UkbB2