Loading...
HomeMy WebLinkAboutMinutes PC 10-17-23 Zoccola: Should it be read that of all owners to amend provisions or create new rental provisions?I'm reading it as there are rentals provisions in place.This is intended for new subdivisions only.Adrienne Keeling: We will not force new subdivisions to have rental restrictions, it will be up to them or the developer to create them. IA Motion made by Buckler and seconded by Campagna to send PZ-2023-00166 OA to the City Council with a favorable recommendation.Approved 6-0,absent Coleman,Grabow,Kirsh. 7. Docket No.PZ-2023-00136 DP/ADLS: The Edge at West Carmel 8. Docket No.PZ-2023-00157 V:UDO Section 2.24: Min.Lot Area 5,000 sq. ft. per multi-family dwelling unit, 2,899 sq.ft. requested. 9. Docket No.PZ-2023-00158 V: UDO Section 5.28: 540 parking spaces required,394 requested. 10. Docket No.PZ-2023-00159 V: UDO Section 2.24: Max Lot Coverage 40%,50% requested. 11. Docket No.PZ-2023-00160 V:UDO Section 3.88(C):20'Max height allowed adjacent to residential; 27' and 38' requested. 12. Docket No.PZ-2023-00161 V: UDO Section 3.88(D): Buildings facades 90' or greater in width shall have offsets not less than 8' deep,1.5' requested. 13. Docket No.PZ-2023-00162 V: UDO Section 3.96(B): Min. Rear Yard Setback 52.5' adjacent to residential, 40' requested. The applicant seeks site plan and design approval as well as variances for a new development with an apartment complex(252 units),and one future commercial out-lot. The site is located at 11335 N.Michigan Road. It is zoned B-3Business and is located within the US 421 Overlay zone. Filed by Rick Lawrence with Nelson& Frankenberger,LLC,on behalf of REI Real Estate Services,LLC. Petitioner:Jon Dobosiewicz,Nelson&Frankenberger LLC • With me tonight are Mike Wells,Ryan Wells,Rick Lawrence,and other members of the development team • We attended two Residential Committee meetings,with the Committee voting 3-0 favorable recommendation • Two conditions of approval were modification of the proposed commitments to install a crosswalk at the intersection of Michigan Road and the entrance of this site,and to address all TAC review comments • Some of the changes made include building 1 has decreased from 3 to 2-stories,overall number of units have reduced from 252 to 238 units,and overall density has been reduced to 13.7 units per acre,and parking spaces have increased from 401 to 406. • We provided density comparisons of other apartment communities in this area • We provided large buffer details of the landscape trees along the property's perimeter • The Petitioners have addressed all the items the Residential Committee requested Department Report: Alexia Lopez • They have addressed all of our Planning comments.They still have to address the TAC remaining comments. • We believe this is an appropriate use for this piece of land • Staff recommends that the PC approves this item with the commitments submitted by the Petitioner and conditioned upon final Engineering and TAC approvals through ProjectDox Residential Committee Recap: Susan Westermeier • We discussed about the other apartment communities being built along Michigan Road • They agreed to install and manage all landscaping between the fence and property line • They have added a pier and a path at the detention pond • They had a neighborhood meeting on Sept.21 to discuss the neighbor's concerns and wants • Pedestrian crosswalks were added ICommittee Comments: Zoccola: With the fence being within 25-ft of the property line,you are cutting out the greenspace from this development. What is it going to look like to the future residents living here?Jon Dobosiewicz: The placement of the fence within this development was asked for by the surrounding neighbors. The intent of the fence being placed there is to provide a transition and buffer to the adjacent properties.We spent a large amount of time what would be planted on both sides of 5 Plan Commission Minutes 10-17-23 the fence. We will provide additional plantings internally. Westermeier: I wish this was being sent to the City Council. I don't think it meets the criteria for affordable housing and downsizing.I'm worried about all the apartments that are currently being built on the other side of Michigan Road. Buckler: I will state that all of my concerns were met by the Petitioners. Cam pagna: I have sat in the Petitioner's seat, and we have put this group through the ringer with our amount of requests,and they have met all of our requests. A Motion made by Buckler and seconded by Campagna to approve PZ-2023-00136 DP/ADLS,PZ-2023-00157 thru PZ-2023-00162 V with the commitments submitted by the Petitioner and conditioned upon final Engineering and TAC approvals through ProjectDox. Approved 5-1,Zoccola; absent Coleman,Grabow,Kirsh. Meeting adjourned at 7:38 p.m. ti X(7-Th Joe estak PC Secretary Christine Zoccol Vice President I I Plan Commission Minutes 10-17-23