Loading...
HomeMy WebLinkAboutADDITION - TRUSS LAYOUT.pdfXM1 (10) XM1 (10) 21-9-8 49-11-8 14-6-0 19-11-4 5-9-0 XM1DE XMG1 XM2 XM2 XMG1 XM1DE 2x10 RAFTERS -PER PLAN- 41-8-12 CHIMNEY (4'8" X 2'1/4") VERIFY LOCATION AND SIZE OF CHIMNEY 2" AIR GAP FROM MASONRY WALLS PER FIRE CODE. FISH30254661 ROOF TRUSS LAYOUT LAYOUT INFORMATION LOADING: 20-7-0-10 BUILDING CODE: IRC2018 SPACING: 24" TYP ROOF PITCH: 1/12 CEILING PITCH: 1/12 HEELS: 16" OVERHANGS: 2'8" -DROPPED ENDS FOR OUTLOOKERS WALLS: 2X4 DIM. : FRAMING TO FRAMING DIM. FORMAT: FEET-INCH-SIXTEENTHS DESIGNER NOTES 2" AIR GAP FOR GIRDERS AROUND EXISTING CHIMNEY. (VERIFY LOCATION AND SIZE OF CHIMNEY) ALL BEAMS, LEDGERS, RAFTERS, AND HAND FRAMING AREAS ARE BY OTHERS BUILD UP BEARING WALLS TO MEET TRUSSES NOTCHING WALL WHEN NEEDED SKYLIGHTS SHOWN ARE 22.5"X46.5" TO FIT BETWEEN TRUSSES SPACED 24" o.c. SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT 2-8-0 2-8-0 2-8-0 2-8-0 24" o.c. 2-0-0 2-8-0 1-4-0 24" o.c. 1-3-8 2-8-0 BUILD UP BEARING WALL TO MEET XM1DE BUILD UP BEARING WALL TO MEET XM1DE HAND FRAMED OUTLOOKERS HAND FRAMED OUTLOOKERS 5-4-0 5-4-0 7-4-0 7-4-0 15-10-0 19-4-0 3-8 FLAT1 FLAT2 XM3 XM3 4-8-0 9-8 V-WEB FOR 9.5" FLEX DUCT. EXISTING BEARING WALL EXISTING BEARING WALL 49-8-0 Hanger Schedule Key Model Qty A LUS24 8 A A A A A A A A 1 1 1 1 Job Number: Checked By: Designed By: Shawn Vanblarcom NOTES: 1.) REFER TO INDIVIDUAL TRUSS ...DRAWINGS FOR ADDITIONAL INFO. 2.) DIMENSIONS SHOWN ARE FROM ...FACE OF STUD OF BEARING WALLS. 3.) DIMENSIONAL VERIFICATION IS THE ...RESPONSIBILITY OF THE SITE ...CONTRACTOR AND/OR ARCHITECT. 4.) ALL INTERIOR HEADERS TO BE ...DROPPED EXCEPT AS NOTED. 5.) ALL TRUSSES MUST BE SPACED AT ...A MAXIMUM OF 24'' OC UNLESS ...OTHERWISE NOTED. 6.) *DO NOT CUT, DRILL, OR ALTER ...*ANY TRUSS WITHOUT WRITTEN ...*CONSENT FROM A REGISTERED ...*ENGINEER. THIS IS A TRUSS PLACEMENT DIAGRAM ONLY These trusses are designed as individual building components to be incorporated into the building design at the specification of the building designer. See individual design sheets for eash truss design identified on the placement drawing. The building designer is responsible for temporary and permanent bracing of the roof and floor system and for the overall structure. The design of the entire truss support structure including, but not limited to headers, beams, walls, and columns is the responsibility of the building designer. For general guidance regarding bracing, consult ''Bracing of wood trusses'' available from the Truss Plate Institute, 583 D'Onifiro Drive, Madison, WI 53179. CUSTOMER NAME: NEW JOB PROJECT: QTREC0803441 DATE: 08 / 31 / 23 FILENAME: 1-A.tdlLayout REVISION: DATE: BY: REVISION: DATE: BY: REVISION: DATE: BY: