J- ....._ .-
Lillard, Sarah N
From:
Sent:
To:
Cc:
Subject:
Greg Hayes [grh@ca.hamillan.in.us]
Thursday, December 21,2006 1:46 PM
Lillard, Sarah N; Brent A. White; jrisser@sdcca.com
Hill, Dick B; Duncan, Gary R; McBride, Mike T; Jerry Liston
RE: TEMPLE CONGREGATION (2006-0102)
Sarah
Based on Carmel Engineering conditional release of the building permit for the temple,
HCSO will also support the building permit release, knowing the plans will be approved in
a short time period. If you have any questions, please let me know.
Brent and John
This conditional release for the building permit does not grant construction plans
approval and the detention basin outlet pipe CAN NOT be installed until the plans are
approved and a pre-con meeting has been held.with Jerry Liston from our office. If you
have any questions, please contact myself or Jerry.
Greg Hoyes
HCSO Plan Reviewer
>>> IIDuncanl Gary RII <gduncan@carmel.in.gov> 10:34 AM ThursdaYI
December 211 2006 >>>
Brent 1
Please understand that Engineering is supporting conditional release of the building
permit. We have not issued conditional approval of the construction drawings.
Gary
-----Original Message-----
From: Brent A. White [mailto:baw@deboyland.com]
Sent: Thursday, December 21, 2006 10:33
To: Duncan, Gary R
Cc: jrisser@sdcco.comi Hill, Dick Bi McBride, Mike Ti Greg Hoyesi Lillard, Sarah N
Subject: RE: TEMPLE CONGREGATION (2006-0102)
Gary,
Could you send me your comments regarding the Temple electronically so we may speed up the
process of getting the plans completely approved and finish the project from the design
portion?
Also, Greg Hoyes has given verbal approval of the plans. I am trying to get in touch with
him to see if he can send an email or confirmation of his approval to Sarah Lillard,
hopefully today or this afternoon, since he will be out all next week.
Thank you for the conditional approval of the plans.
Brent A. White, E.l., S.I.T.
MAP IT
-----Original Message-----
From: Duncanl Gary R [mailto:gduncan@carmel.in.gov]
Sent: Thursday, December 21, 2006 9:45 AM
To: Lillard, Sarah N
Cc: jrisser@sdcco.comi Brent A. Whitei Hilll Dick Bi McBride 1 Mike T
Subject: TEMPLE CONGRGATION (2006-0102)
1
~ ~
Sarah,
Engineering is willing to support the release of the building permit for the Temple. As
final construction plans have not been approved, engineering requests that the permit be
issued conditioned upon holding rough-in inspections until the plans are approved. I have
comments to issue related to the plans that I hope can be finished up before the end of
the year with approval the first week in January. With release of the building permit, I
am not expecting the petitioner to have issues with delaying the final approval of the
plans. The work in the right-of-way, which requires final plan approval, will not likely
be able to completed until the Spring anyway given the City's restrictions on paving
between December 15th and March 15th. Thanks so much, Gary
2
Lillard, Sarah N
From:
Sent:
To:
Cc:
Subject:
Duncan, Gary R
Thursday, December 21, 2006 9:45 AM
Lillard, Sarah N
jrisser@sdcco.com: 'Brent A. White'; Hill, Dick B; McBride, Mike T
TEMPLE CONGRGATION (2006-0102)
Sarah,
Engineering is willing to support the release of the building permit for the Temple. As
final construction plans have not been approved, engineering requests that the permit be
issued conditioned upon holding rough-in inspections until the plans are approved. I have
comments to issue related to the plans that I hope can be finished up before the end of
the year with approval the first week in January. With release of the building permit, I
am not expecting the petitioner to have issues with delaying the final approval of the
plans. The work in the right-of-way, which requires final plan approval, will not likely
be able to completed until the Spring anyway given the Cityrs restrictions on paving
between December 15th and March 15th. Thanks so much, Gary
1
BOSE
McKINNEY
& EVANS LLP
LJ COpy
ATTORNEYS AT LAW
Joseph D. Calderon
North Office
Direct Dial (317) 684.5331
Direct Fax (317)223-0331
E-Mail: JCalderon@boselaw.com
October 25, 2006
Mr. Jim Blanchard, Building Commissioner
City of Carmel
One Civic Square
Carmel, IN 46032
Dear Mr. Blanchard:
Please accept this letter from us as attorneys for Shaarey Tefilla Congregation, Inc. (the
"Synagogue") with respect to the landscaping plans for the Synagogue's new location at
approximately 3030 West 116'h Street. We are tendering this letter to you with the understanding
that the commitments concerning the phasing in of the approved landscaping as described in this
letter will be sufficient for you to issue the necessary and appropriate building pernlits to allow
the Synagogue to begin construction. Specifically, the Synagogue understands that Scott Brewer
has approved a phased installation of the landscaping, described as follows:
I. Phase I and Phase III: as shown on Sheet Number LPIOI, to be installed no later than
Spring 2007;
2. Phase II: as shown on Sheet Number LPlOl, to be installed not later than one (I) year
after occupancy of the Synagogue building, or the next available planting season.
Upon your receipt and acceptance of this letter, please issue the appropriate building
permits to our contractor, Smith Development & Construction Company. If you should have any
questions or comments, please do not hesitate to contact me.
Very truly yours,
/)~(\.UI
JOC/djm
Enclosure
cc: Scott Brewer, Urban Forester
Matt Griffin, DOCS
Sara Lillard, Building & Code Services
810148
Downtown' 2/00 firsllndi.llM Plaza' 135 North Penmylvanid Street. Indianapolis, Indiana 46204 . (317) 684-5000 . Fax (317) 684-5173
North Olfice . 600 East 96th Street . Suile 500 . Innii\rlclpolis. Indi;:lfl,l 46240 . (317) 684-5300 . Fax (317) 684-5316
Washington Oiiice . 100 North One Lafayette Centre . 1120 20th Street, NV\/. . Washington, D.C. 20036 . (202) 973-1229 . Fax (202) 973-1212
\VW\v.boscla\v.com
Lillard, Sarah N
From:
Sent:
To:
Cc:
Subject:
Duncan, Gary R
Thursday, December 14, 2006 7:11 AM
'Brent A. White'
Lillard, Sarah N; Redden, Nick
RE: Shaarey Tefilla Synagogue (2006-0001)
Brent,
Would you send us a current set of plans with the last response letter to the last comment
letter that we issued? I would like to get this buttoned up so the church can clear
engineering approval and get one step closer to pulling the ILP.
Thanks so much,
Gary
-----Original Message-----
From: Brent A. White [mailto:baw@deboyland.com]
Sent: Monday, December 11, 2006 12:01
To: Duncan, Gary R
Subject: RE: Shaarey Tefilla Synagogue (2006-0001)
Gary,
Per our notes and documentation, we have BPW approval for the site and I do not have any
record of an October comment letter for the site. The last letter from you was in regards
to obtaining the passing blister, which we were unable to do due to land owner's not
selling land.
Thank you,
Brent A. White, E.I., S.I.T.
MAP IT
-----Original Message----~
From: Duncan, Gary R [mailto:gduncan@carmel.in.gov1
Sent: Monday, December 11, 2006 8:57 AM
To: Brent A. White
Subject: RE: Shaarey Tefilla synagogue
Brent,
Have revised plans been submitted based on a comment letter issued back in October?
Thanks so much,
Gary
-----Original Message-----
From: Brent A. White [mailto:baw@deboyland.com]
Sent: Thursday, December 07, 2006 08:30
To: Duncan, Gary R
Subject: FW: Shaarey Tefilla Synagogue
Gary,
For the Temple Congregation Shaarey Tefilla, is the City Engineering Department ready to
sign off on approved plans?
1
Thank you,
Brent A. White, E.I., S.I.T.
MAP IT
-----Original Message~----
From: Greg Hayes [mailto:grh@co.hamilton.in.us]
Sent: Thursday, December 07, 2006 8:20 AM
To: Sarah N Lillard; Ryan Hartman; Brent A. White
Subject: RE: Shaarey Tefi11a Synagogue
Brent
Does Carmel Engineering need to stamp them approved?
Greg
>>> "Brent A. White" <baw@deboyland.com> 8:18 AM Thursday, December 07,
2006 >>>
Greg!
I can get you a current set of plans which are finalized except for the sanitary by mid-
morning if that will be sufficient so SDC may install the storm outlet run for the
detention basin and if possible the remainder of the on-site storm sewer system. Please
let me know if this is possible and acceptable with all entities.
Thank you,
Brent A. White, E.I., S.I.T.
MAP IT
-----Original Message----~
From: Greg Hayes [mailto:grh@co.hamilton.in.usJ
Sent: Thursday, December 07, 2006 8:14 AM
To: Sarah N Lillard; Ryan Hartman
Cc: Brent A. White
Subject: Re: Shaarey Tefi11a Synagogue
Ryan
I do not have a problem with your suggestion and we are ready to let me go as soon as we
have plans to approve. It sounds like the sanitary issues may be what is holding up the
final plans. If that is the case! maybe all the other sheets can be finalized and the
plans we stamp have a not for sanitary approval disclaimer on them. I am currently
waiting on plans from Brent and once we approve them! with all final procedural items
complete! we will release for construction. If you have any questions, please let me
know.
Greg Hayes
HCSO Plan Reviewer
>>> IlRyan Hartmantt <Ryan.Hartman@CTRWD.ORG> 5:04 PM Wednesday,
December
06, 2006 >>>
Sarah and Greg,
I am sure you both are well aware of the sanitary
experiencing with the Sharrey Tefilla Synagogue.
of what issues they are facing.
issues that we are currently
If you are not aware here is a synopsis
2
AS of today the Synagogue has two options one running East 20001+ with a private grinder
pump and several easements or running South 10001+ with a private grinder pump and an
easement through Bridlebourne and the University. Currently Bridlebourne has requested
that a donation of $75,000 -$100,000 be made for and easement which is not equitable and
the amount of easements required to run East is very time consuming and costly. Therefore
currently we are at a standstill with a meeting to be held on Monday morning. DeBoy has
requested that we give a conditional permit in order for the Temple to install the outlet
pipe for their Dry Detention area. Our hands are really tied on giving a conditional
permit until easements are in place because we still have no actual route to provide sewer
service, but we currently have no issues on the storm being installed unless you have
reservations. Is us not issuing a permit the basis for postponing the construction of the
outfall pipe and if so is this enough to allow the installation? If the Temple would push
forward and construct more than allowed we still have the power of not allowing final
connection due to our inspection procedure. Please let me know if this is acceptable or
what I can do to expedite the process in this rare case. Thank you for your understanding
and we do appreciate other utilities looking out for one another.
Ryan C. Hartman, E.I.T
District Engineer
Clay Township Regional Waste District
10701 N. College Ave., Suite A
Indianapolis, IN 46280-1098
Direct, 317-844-9200
Fax, 317-844-9203
Cell, 317-714-7219
ryan.hartman@ctrwd.org
3
-
.
Lillard, Sarah N
From:
Sent:
To:
Subject:
Ryan Hartman [Ryan.Hartman@CTRWD.ORG]
Thursday, December 07, 2006 8:31 AM
Brent A. White; Greg Hayes; Lillard, Sarah N
RE: Shaarey Tefilla Synagogue
CTRWD is fine
what is being
with this suggestion as long as Carmel/Hamilton Co. has no problems with
proposed.
Ryan C. Hartman, E.I.T
District Engineer
Clay Township Regional Waste District
10701 N. College Ave., Suite A
Indianapolis, IN 46280-1098
Direct, 317-844-9200
Fax, 317-844-9203
Cell, 317-714-7219
ryan.hartman@ctrwd.org
-----Original Message-----
From: Brent A. White [mailto:baw@deboyland.com]
Sent, Thursday, December 07, 2006 8,18 AM
To: Greg Hayes; Sarah N Lillard; Ryan Hartman
Subject, RE, Shaarey Tefilla Synagogue
Greg,
I can get you a current set of plans which are finalized except for the sanitary by mid-
morning if that will be sufficient so SDC may install the storm outlet run for the
detention basin and if possible the remainder of the on-site storm sewer system. Please
let me know if this is possible and acceptable with all entities.
Thank you,
Brent A. White, E.l., S.l.T.
MAP IT
-----Original Message-----
From: Greg Hoyes [mailto:grh@co.hamilton.in.usJ
Sent: Thursday, December 07, 2006 8:14 AM
To: Sarah N Lillard; Ryan Hartman
Cc: Brent A. White
Subject: Re: Shaarey Tefilla Synagogue
Ryan
I do not have a problem with your suggestion and we are ready to let me go as soon as we
have plans to approve. It sounds like the sanitary issues may be what is holding up the
final plans. If that is the case, maybe all the other sheets can be finalized and the
plans we stamp have a not for sanitary approval disclaimer on them. I am currently
waiting on plans from Brent and once we approve them, with all final procedural items
complete, we will release for construction. If you have any questions, please let ~e
know.
Greg Hoyes
HeSa Plan Reviewer
>>> tlRyan Hartmantl <Ryan.Hartman@CTRWD.ORG> 5:04 PM Wednesday, December
06, 2006 >>:;.
Sarah and Greg,
1
~
r
I am sure you both are well aware of the sanitary
experiencing with the Sharrey Tefilla Synagogue.
of what issues they are facing.
issues that we are currently
If you are not aware here is a synopsis
As of today the Synagogue has two options one running East 2000'+ with a private grinder
pump and several easements or running South 1000'+ with a private grinder pump and an
easement through Bridlebourne and the University. Currently Bridlebourne has requested
that a donation of $75,000 -$1001000 be made for and easement which is not equitable and
the amount of easements required to run East is very time consuming and costly. Therefore
currently we are at a standstill with a meeting to be held on Monday morning. DeBoy has
requested that we give a conditional permit in order for the Temple to install the outlet
pipe for their Dry Detention area. Our hands are really tied on giving a conditional
permit until easements are in place because we still have no actual route to provide sewer
service, but we currently have no issues on the storm being installed unless you have
reservations. Is us not issuing a permit the basis for postponing the construction of the
outfall pipe and if so is this enough to allow the installation? If the Temple would push
forward and construct more than allowed we still have the power of not allowing final
connection due to our inspection procedure. Please let me know if this is acceptable or
what I can do to expedite the process in this rare case. Thank you for your understanding
and we do appreciate other utilities looking out for one another.
Ryan C. Hartman, E.I.T
District Engineer
Clay Township Regional Waste District
10701 N. College Ave., Suite A
Indianapolis, IN 46280~l098
Direct: 317~844~9200
Fax: 317~844~9203
Cell: 317~714~7219
ryan.hartman@ctrwd.org
2
Page 1 of 1
Lillard, Sarah N
From: Ryan Hartman [Ryan.Hartman@CTRWD.ORG]
Sent: Wednesday, December 06, 2006 5:05 PM
To: Lillard, Sarah N; grh@co.hamilton.in.us
Cc: Brent A. White
Subject: Shaarey Tefilla Synagogue
Sarah and Greg,
I am sure you both are well aware of the sanitary issues that we are currently experiencing with the Sharrey
Tefilla Synagogue. If you are not aware here is a synopsis of what issues they are facing.
As of today the Synagogue has two options one running East 2000'+ with a private grinder pump and several
easements or running South 1000'+ with a private grinder pump and an easement through Bridlebourne and the
University. Currently Bridlebourne has requested that a donation of $75,000 -$100,000 be made for and
easement which is not equitable and the amount of easements required to run East is very time consuming and
costly. Therefore currently we are at a standstill with a meeting to be held on Monday morning. DeBoy has
requested that we give a conditional permit in order for the Temple to install the outlet pipe for their Dry Detention
area. Our hands are really tied on giving a conditional permit until easements are in place because we still have
no actual route to provide sewer service, but we currently have no issues on the storm being installed unless you
have reservations. Is us not issuing a permit the basis for postponing the construction of the outfall pipe and if so
is this enough to allow the installation? If the Temple would push forward and construct more than allowed we
still have the power of not allowing final connection due to our inspection procedure. Please let me know if this is
acceptable or what I can do to expedite the process in this rare case. Thank you for your understanding and we
do appreciate other utilities looking out for one another.
Ryan C. Hartman, E.I.T
District Engineer
Clay Township Regional Waste District
10701 N. College Ave.; Suite A
Indianapolis, IN 46280-I098
Direct: 317-844-9200
Fax: 317-844-9203
Cell: 317-714-7219
K~an.hartman@ctrwd.orq
1217/2006
Lillard, Sarah N
From:
Sent:
To:
Cc:
Subject:
Greg Hoyes [grh@co.hamilton.in.us]
Thursday, December 07, 2006 8:14 AM
Lillard, Sarah N; Ryan Hartman
Brent A. White
Re: Shaarey Tefilla Synagogue
Ryan
I do not have a problem with your suggestion and we are ready to let me go as soon as we
have plans to approve. It sounds like the sanitary issues may be what is holding up the
final plans. If that is the case, maybe all the other sheets can be finalized and the
plans we stamp have a not for sanitary approval disclaimer on them. I am currently
waiting on plans from Brent and once we approve them, with all final procedural items
complete, we will release for construction. If you have any questions, please let me
know.
Greg Hayes
HCSO Plan Reviewer
>>> l1Ryan Hartman" <Ryan.Hartman@CTRWD.ORG> 5:04 PM Wednesday, December
06} 2006 >>>
Sarah and Greg,
I am sure you both are well aware of the sanitary
experiencing with the Sharrey Tefilla Synagogue.
of what issues they are facing.
issues that we are currently
If you are not aware here is a synopsis
As of today the Synagogue has two options one running East 20001+ with a private grinder
pump and several easements or running South 1000'+ with a private grinder pump and an
easement through Bridlebourne and the University. Currently Bridlebourne has requested
that a donation of $75,000 -$100,000 be made for and easement which is not equitable and
the amount of easements required to run East is very time consuming and costly. Therefore
currently we are at a standstill with a meeting to be held on Monday morning. DeBoy has
requested that we give a conditional permit in order for the Temple to install the outlet
pipe for their Dry Detention area. Our hands are really tied on giving a conditional
permit until easements are in place because we still have no actual route to provide sewer
service, but we currently have no issues on the storm being installed unless you have
reservations. Is us not issuing a permit the basis for postponing the construction of the
outfall pipe and if so is this enough to allow the installation? If the Temple would push
forward and construct more than allowed we still have the power of not allowing final
connection due to our inspection procedure. Please let me know if this is acceptable or
what I can do to expedite the process in this rare case. Thank you for your understanding
and we do appreciate other utilities looking out for one another.
Ryan C. Hartman, E.I.T
District Engineer
Clay Township Regional Waste District
10701 N. College Ave., Suite A
Indianapolis, IN 46280-1098
Direct, 317-844-9200
1
Lillard, Sarah N
From:
Sent:
To:
Subject
Brent A. White [baw@deboyland.com]
Thursday, December 07,20068:18 AM
Greg Hoyes; Lillard, Sarah N; Ryan Hartman
RE: Shaarey Tefilla Synagogue
Greg,
I can get you a current set of plans which are finalized except for the sanitary by mid-
morning if that will be sufficient so SDC may install the storm outlet run for the
detention basin and if possible the remainder of the on-site storm sewer system. Please
let me know if this is possible and acceptable with all entities.
Thank you,
Brent A. White, E.I., S.l.T.
MAP IT
-----Original Message-----
From: Greg Hayes [mailto:grh@co.hamilton.in.us]
Sent: Thursday, December 07, 2006 8:14 AM
To: Sarah N Lillard; Ryan Hartman
Cc: Brent A. White
Subject: Re: Shaarey Tefilla Synagogue
Ryan
I do not have a problem with your suggestion and we are ready to let me go as soon as we
have plans to approve. It sounds like the sanitary issues may be what is holding up the
final plans. If that is the case, maybe all the other sheets can be finalized and the
plans we stamp have a not for sanitary approval disclaimer on them. I am currently
waiting on plans from Brent and once we approve them, with all final procedural items
complete, we will release for construction. If you have any questions, please let me
know.
Greg Hoyes
HCSO Plan Reviewer
>>> "Ryan Hartman" <Ryan.Hartman@CTRWD.ORG> 5:04 PM Wednesday, December
06, 2006 >>>
Sarah and Greg,
I am sure you both are well aware of the sanitary
experiencing with the Sharrey Tefilla Synagogue.
of what issues they are facing.
issues that we are currently
If you are not aware here is a synopsis
As of today the Synagogue has two options one running East 20001+ with a private grinder
pump and several easements or running South 10001+ with a private grinder pump and an
easement through Bridlebourne and the University. Currently Bridlebourne has requested
that a donation of $75/000 -$100,000 be made for and easement which is not equitable and
the amount of easements required to run East is very time consuming and costly. Therefore
currently we are at a standstill with a meeting to be held on Monday morning. DeBoy has
requested that we give a conditional permit in order for the Temple to install the outlet
pipe for their Dry Detention area. Our hands are really tied on giving a conditional
permit until easements are in place because we still have no actual route to provide sewer
service, but we currently have no issues on the storm being installed unless you have
reservations. Is us not issuing a permit the basis for postponing the construction of the
Lillard, Sarah N
From:
Sent:
To:
Subject:
Greg Hoyes [grh@co.hamilton.in.us]
Thursday, December 07,20068:20 AM
Lillard, Sarah N; Ryan Hartman; Brent A. White
RE: Shaarey Tefilla Synagogue
Brent
Does Carmel Engineering need to stamp them approved?
Greg
>>> \\Brent A. White" <baw@deboyland.com> 8:18 AM Thursday, December 07,
2006 >>>
Greg,
I can get you a current set of plans which are finalized except for the sanitary by mid-
morning if that will be sufficient so SDC may install the storm outlet run for the
detention basin and if possible the remainder of the on-site storm sewer system. Please
let me know if this is possible and acceptable with all entities.
Thank you,
Brent A. White, E.I., S.I.T.
MAP IT
-----Original Message-----
From: Greg Hoyes [mailto:grh@co.hamilton.in.us]
Sent: Thursday, December 07, 2006 8:14 AM
To: Sarah N Lillard; Ryan Hartman
Cc: Brent A. White
Subject, Re, Shaarey Tefilla Synagogue
Ryan
I do not have a problem with your suggestion and we are ready to let me go as soon as we
have plans to approve. It sounds like the sanitary issues may be what is holding up the
final plans. If that is the case, maybe all the other sheets can be finalized and the
plans we stamp have a not for sanitary approval disclaimer on them. I am currently
waiting on plans from Brent and once we approve them, with all final procedural items
complete, we will release for construction. If you have any questions, please let me
know.
Greg Hoyes
RCSO Plan Reviewer
>>> IIRyan Hartmanll <Ryan.Hartman@CTRWD.ORG> 5:04 PM Wednesday,
December
06, 2006 >>>
Sarah and Greg,
I am sure you both are well aware of the sanitary
experiencing with the Sharrey Tefilla Synagogue.
of what issues they are facing.
issues that we are currently
If you are not aware here is a synopsis
As of today the Synagogue has two options one running East 2000'+ with a private grinder
pump and several easements or running South 1000'+ with a private grinder pump and an
1
Page 1 0[2
Lillard, Sarah N
From: Lillard, Sarah N
Wednesday, November 22,20064:27 PM
Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary
R; Redden, Nick; Duffy, John M
Cc: 'jrisser@sdcco.com'
Subject: RE: Pre-Submittal for Shaarey Tafilla Synagogue
Sent:
To:
John,
The following requests for copies of certain parts of the approved plan come from members of
our Planning and Zoning office. One copy of each stamped plan is required for submittal for the'
building permit. I have also listed another item you may need to check into after the first items.
1. Please submit four (4) copies of the approved site plan to Scott Brewer, DOCS, One Civic Square, Carmel, IN,
46032. You will be notified when your copies are ready for pickup. Contact: Scott Brewer, City Forester/Environmental
Planner. One Civic Square; Carmel. IN 46032. Phone: (317) 571-2478. FAX (317) 571-2426
2. Please submit three (3) copies of the architectural elevation drawings for the structure to Matt Griffin, DOCS,
One Civic Square, Carmel, IN, 46032. You will be notified when your copies are ready for pickup. Contact: Matt
Griffin, Planning Administrator. One Civic Square; Carmel. IN 46032. Phone: (317) 571-2417. FAX (317) 571-2426.
You may also need to contact John Duffy of Carmel Utilities regarding the water
connection/availability. If a permit for the water needs to be issued, that will need to be
obtained prior to submittal for the building permit, or at the time of the submittal meeting.
Thank you,
Sarah
-----Original Message-----
From: Lillard, Sarah N
Sent: Monday, November 20, 20064:37 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton,in.us'; 'rct@co,hamilton.in.us';
'Ryan.hartman@ctrwd.org'; 'jbt@co,hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R;
Redden, Nick; Duffy, John M
Cc: 'jrisser@sdcco.com'
Subject: Pre-Submittal for Shaarey Tafilla Synagogue
The Dept. of Community Service, Building & Code Enforcement division, has
received a request to meet for the purpose of submitting to obtain a building
permit for the below-mentioned project. PLEASE "REPLY TO ALL" AS
SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After some
time, we may proceed with the meeting and submittal, even if all offices have not
11/22/2006
Lillard. Sarah N
Cc:
Subject:
Greg Hoyes [grh@co.hamilton.in.us]
Monday, November 20, 2006 5:38 PM
Conn, Angelina V; Foley, Amanda J; Hill, Dick B; Duncan, Gary R; Hoyt, Gary A; Blanchard,
Jim E; Duffy, John M; Griffin, Matt L; Redden, Nick; Brewer, Scott I; Lillard, Sarah N; Dolan,
Veronica A; Akers, William P; Joel Thurman; Robert Thompson; Ryan.harlman@ctrwd.org
jrisser@sdcco.com
Re: Pre-Submittal for Shaarey Tafilla Synagogue
From:
Sent:
To:
Sarah
The Hamilton County Surveyors Office still has not approved the plans for this project
yet. I have looked through our file and it appears we are ready to approve them but where
waiting on some issue to be worked out with 116th Street ROW. I have contacted the
engineer and requested plans. Please do not allow this to move forward at this time. We
should be able to approve the plans and I will send you an e-mail to release the project,
hopefully early next week.
Greg Hayes
HeBO Plan Reviewer
>>> "Lillard, Sarah Nil <SLillard@carmel,in.gov> 4:37 PM Monday,
November 20, 2006 >>>
The Dept. of Community Service, Building & Code Enforcement division, has received a
request to meet for the purpose of submitting to obtain a building permit for the below~
mentioned project. PLEASE "REPLY TO ALL" AS SOON AS POSSIBLE, IF YOU HAVE OUTSTANDING
ISSUES. After some time, we may proceed with the meeting and submittal, even if all
offices have not responded.
Project:
SHAAREY TAFILLA SYNAGOGUE
3085 W. 116th Street
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
06030014 SU
Representative:
John Risser
Smith Development & Construction
jrisser@sdcco.com
Ph. (317) 726-0340
1
Page 1 of2
Lillard, Sarah N
From: Hoyt, Gary A
Sent: Tuesday, November 21,2006 1 :50 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica
A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan.hartman@ctrwd.org';
'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy,
John M
Ce: 'jrisser@sdcco.com'
Subject: RE: Pre-Submittal for Shaarey Tafilla Synagogue
Fire department still has questions on whether the building has a sprinkler
system, or if the petitioner is agreeable to an additional fire hydrant, if the building
has a fire alarm system, the height and if the building has a basement. Our
department also requested a Knox box and Knox fire department connection
caps. Knox products may be ordered online at www.knoxbox.com
Gary Hoyt, Fire Marshal
Carmel Fire Department Prevention Bureau
From: Lillard, Sarah N
Sent: Monday, November 20, 2006 4:37 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us'; 'Ryan.hartman@etrwd.org';
'jbt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R; Redden, Nick; Duffy, John M
Ce: 'jrisser@sdcco.com'
Subject: Pre-Submittal for Shaarey Tafilla Synagogue
The Dept. of Community Service, Building & Code Enforcement division, has
received a request to meet for the purpose of submitting to obtain a building permit
for the below-mentioned project. PLEASE "REPLY TO ALL" AS SOON AS
POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After some time, we may
proceed with the meeting and submittal, even if all offices have not responded.
Project:
SHAAREY TAFILLA SYNAGOGUE
3085 W. 116th Street
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
06030014 SU
Representative:
11/22/2006
Page 1 of 1
Lillard, Sarah N
From: Akers, William P
Sent: Monday, April 17, 2006 2:59 PM
To: 'Kevin J. Roberts'; Crockett, Terry N; Daley, Penny J; Duffy, John M; Gray, Pat A; Harding, Brent S;
Hill, Dick B; Hoyt, Gary A; Kempa, Lisa L; Krueskamp, Theresa A; Lillard, Sarah N; McCoy, David
W; Spears, Jack J
Cc: 'Brooke Gajownik'
Subject: TEMPLE CONGREGRATON SHAAREY TEFILLA ADDRESS
I have assigned an address to the future project "Temple Congregration Shaarey Tefilla" located on W 116'h
SI.
Parcel No: 17-13-05-00-00-001.003. The address assigned will be 3085 W 116th SI.
Thank You,
Bill
11/20/2006
Page 1 of 1
Lillard, Sarah N
Sent:
To:
From: Lillard, Sarah N
Monday, November 20, 20064:37 PM
Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'rct@co.hamilton.in.us';
'Ryan.hartman@ctrwd.org'; ]bt@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary
R; Redden, Nick; Duffy, John M
Ce: 'jrisser@sdcco.com'
Subject: Pre-Submittal for Shaarey Tafilla Synagogue
The Dept. of Community Service, Building & Code Enforcement division, has
received a request to meet for the purpose of submitting to obtain a building permit
for the below-mentioned project. PLEASE "REPLY_J_O ALL" AS SOON AS
POSSIBLE, IF YOU HAVE OUTSTANDING ISSUES. After some time, we may
proceed with the meeting and submittal, even if all offices have not responded.
Project:
SHAAREY TAFILLA SYNAGOGUE
3085 W. 116th Street
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
06030014 SU
Representative:
John Risser
Smith Development & Construction
jrisser@sdcco.com
Ph. (317) 726-0340
Again, if there are concerns that might affect the issuance of this permit,
please REPLY TO ALL on this e.mail.
11/20/2006
LJ COpy
BOSE
McKINNEY
& EVANS LLP
'""
ATTORNEYS AT LAW
Joseph D. Calderon
North Office
Direct Dial (317) 684-5331
Direct Fax (317)223-0331
E-Mail: JCalderon@boselaw.com
October 25, 2006
Mr. Jim Blanchard, Building Commissioner
City of Carmel
One Civic Square
Carmel, IN 46032
Dear Mr. Blanchard:
Please accept this letter from us as attorneys for Shaarey Tefilla Congregation, Inc. (the
"Synagogue") with respect to the landscaping plans for the Synagogue's new location at
approximately 3030 Westl16'h Street. We are tendering this letter to you with the understanding
that the commitments concerning the phasing in of the approved landscaping as described in this
letter will be sufficient for you to issue the necessary and appropriate building permits to allow
the Synagogue to begin construction. Specifically, the Synagogue understands that Scott Brewer
has approved a phased installation of the landscaping, described as follows:
I. Phase [ and Phase llI: as shown on Sheet Number LP I 01, to be installed no later than
Spring 2007;
2. Phase II: as shown on Sheet Number LPlOI, to be installed not later than one (I) year
after occupancy of the Synagogue building, or the next available planting season.
Upon your receipt and acceptance of this letter, please issue the appropriate building
permits to our contractor, Smith Development & Construction Company. [fyou should have any
questions or comments, please do not hesitate to contact me.
Very truly yours,
~ /). ~^,-ll
JJl;l D. ~~~eron
mC/djm
Enclosure
cc: Scott Brewer, Urban Forester
Matt Griffin, DOCS
Sara Lillard, Building & Code Services
810]48
lJowntown . 2700 First Indiana PIJza . 135 North Pennsylvania Street . Indianapolis, Indiana 46204 . (317) 684-5000 . Fax (317)684-5173
North O{fice . 600 East 96th Street. Suite 500 . 111dianapolis, Indiana 46240 . (317) 684-5300 . Fax (317) 684-5316
Washington Office. 700 North One Lafayette Centre' 1120 20th Street, N,W. . Washington, D.C. 20036 . (202) 973-1229 . Fax (202) 973-1212
www.boselaw.com