Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Correspondence
Shestak, Joe From:Max Gutowski <mgutowski@tmcrowley.com> Sent:Tuesday, September 17, 2024 11:08 AM To:Keesling, Rachel M; Sylvia, Tyler Cc:Everhart, Nick; Jesse, Christina; Lou Eyster; Shestak, Joe Subject:RE: Lake City Bank Carmel - Handrail Attachments:LCB Carmel - Handrail Completion.pdf Follow Up Flag:Follow up Flag Status:Completed Hi Rachel, The handrail is now installed at the Lake City Bank. See a?ached photos. Is there any approval required? Thanks, Max Gutowski Director of Construction & Development M: 847-987-0001 web: www.tmcrowley.com Address: 11312 Hazel Dell Parkway, Carmel, IN 46280, USA . . . . DISCLAIMER: This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message, which arise as a result of e-mail transmission. If verification is required please request a hard-copy version. TM Crowley & Associates Inc., 11312 Hazel Dell Parkway, Carmel, IN 46280 , USA, http://www.tmcrowley.com . . . . From: Keesling, Rachel M <rkeesling@carmel.in.gov> Sent: Thursday, July 11, 2024 11:45 AM To: Max Gutowski <mgutowski@tmcrowley.com>; Sylvia, Tyler <tsylvia@structurepoint.com> Cc: Everhart, Nick <NEverhart@structurepoint.com>; Jesse, Christina <cjesse@carmel.in.gov>; Lou Eyster <leyster@tmcrowley.com>; Shestak, Joe <jshestak@carmel.in.gov> Subject: RE: Lake City Bank Carmel - Handrail Hi Max, Thanks for sending this. I’ve confirmed with Alex Jordan in Engineering and David Littlejohn, our ADA Coordinator, that the proposed handrail meets requirements. They both said they had been working with you all on the path/updated sidewalk and this was ok to proceed. We will add these documents to the project file – Docket No. PZ-2023-00141 ADLS Amend. Thanks, Rachel 1 Rachel Keesling PLANNING ADMINISTRATOR O: 317-571-2417 | M: 317-750-5634 | rkeesling@carmel.in.gov From: Max Gutowski <mgutowski@tmcrowley.com> Sent: Thursday, July 11, 2024 9:56 AM To: Keesling, Rachel M <rkeesling@carmel.in.gov>; Sylvia, Tyler <tsylvia@structurepoint.com> Cc: Everhart, Nick <NEverhart@structurepoint.com>; Jesse, Christina <cjesse@carmel.in.gov>; Lou Eyster <leyster@tmcrowley.com> Subject: RE: Lake City Bank Carmel - Handrail Resending with smaller file size. See below and a?ached. Max Gutowski Director of Construction & Development M: 847-987-0001 web: www.tmcrowley.com Address: 11312 Hazel Dell Parkway, Carmel, IN 46280, USA . . . . DISCLAIMER: This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message, which arise as a result of e-mail transmission. If verification is required please request a hard-copy version. TM Crowley & Associates Inc., 11312 Hazel Dell Parkway, Carmel, IN 46280 , USA, http://www.tmcrowley.com . . . . From: Max Gutowski Sent: Thursday, July 11, 2024 9:53 AM To: Keesling, Rachel M <rkeesling@carmel.in.gov>; Sylvia, Tyler <tsylvia@structurepoint.com> Cc: Everhart, Nick <NEverhart@structurepoint.com>; Jesse, Christina <cjesse@carmel.in.gov>; Lou Eyster <leyster@tmcrowley.com> Subject: RE: Lake City Bank Carmel - Handrail Hi Rachel, I believe you might have received a previous submi?al for the handrail from our general contractor, however, we are planning to move forward with the a?ached submi?al. Please let me know if the City has any issues with this handrail. Thanks, From: Keesling, Rachel M <rkeesling@carmel.in.gov> Sent: Monday, June 24, 2024 1:44 PM To: Sylvia, Tyler <tsylvia@structurepoint.com>; Max Gutowski <mgutowski@tmcrowley.com> Cc: Everhart, Nick <NEverhart@structurepoint.com>; Jesse, Christina <cjesse@carmel.in.gov> Subject: RE: Lake City Bank Carmel - Handrail Hi Tyler, Yes, that is all correct. If you could email us a spec sheet of whatever you land on, we can add it to your project file. 2 Thanks, Rachel Rachel Keesling PLANNING ADMINISTRATOR O: 317-571-2417 | M: 317-750-5634 | rkeesling@carmel.in.gov From: Sylvia, Tyler <tsylvia@structurepoint.com> Sent: Monday, June 24, 2024 1:26 PM To: Keesling, Rachel M <rkeesling@carmel.in.gov>; Max Gutowski <mgutowski@tmcrowley.com> Cc: Everhart, Nick <NEverhart@structurepoint.com> Subject: Lake City Bank Carmel - Handrail Rachel, Really appreciate your time and help! I have attached Max with TM Crowley to ensure I relayed the correct information. Regarding the handrail, something to the tune of black powdered coated steel tube and ensuring we look relatively similar to the surrounding developments would be acceptable. Let us know if this matches your intent and we will move forward! Again, thank you so much for your help! Tyler Tyler Sylvia, EI Sta? Engineer 9025 River Road, Suite 200 Indianapolis, IN 46240 317.547.5580 OFFICE 317.213.0686 CELL structurepoint.com WEB Best Places to Work in Indiana Best Employers in Ohio DISCLAIMER: This message contains confidential information and is intended only for the individual named. If you are not the named addressee, you should not disseminate, distribute, utilize, or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake, and delete this e-mail from your system. No design changes or decisions made by e-mail shall be considered part of the contract documents unless otherwise specified, and all design changes and/or decisions made by e-mail must be submitted as an RFI or a submittal unless otherwise specified. All designs, plans, specifications and other contract documents (including all electronic files) prepared by the sender shall remain the property of the sender, and the sender retains all rights thereto, including but not limited to copyright, statutory and common-law rights thereto, unless otherwise specified by contract. E- 3 mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message which arise as a result of e- mail transmission. If verification is required, please request a hard-copy version. https://www.structurepoint.com/ 4 DRIVETHRUONE WAYONEWAY CONSTRUCTION DOCUMENTS 9025 River Road, Suite 200 | Indianapolis, Indiana 46240 TEL 317.547.5580 | FAX 317.543.0270 www.structurepoint.com PLOT DATE: 6/5/2024 5:16 PMPLOT SCALE: 1:2.5849EDIT DATE: 6/5/2024EDITED BY: TSYLVIADRAWING FILE: P:\2023\00846\D. Drawings\Civil\Construction Documents\2023.00846.CE.C200.SP.dwgProject Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 6/5/2024 2023.00846 LAKE CITY BANK 1361 S. Rangeline Road Carmel, Indiana REVISION SCHEDULE NO.DESCRIPTION DATE 1 ISSUED FOR CONSTRUCTION 02/19/24 11312 Hazel Dell Parkway | Carmel, Indiana 46280 TEL 317.705.8800 www.tmcrowley.com EXISTING LEGEND SITE LEGEND KEYNOTES SITE DATA TABLE C200 SITE PLAN We have tried to make this catalog comprehensive and factual. We reserve the right to discontinue at any time, without notice, colors, materials, equipment and availability. Since some information may have been updated since the time of printing, we are not responsible for typographical or pictorial errors. Materials shown may vary slightly from actual colors and photos may show optional items. ©Digger Specialties, Inc. 2023/11 BR009 Colors shown are a close representation of the true color. Please consult actual samples for accurate powder coating colors. Grey Fine TextureWhite Fine Texture Bronze Fine Texture MANY GREAT USES!COLORS With PostsWith Railing Stay Connected diggerspecialties.com ADACONTINUOUS HANDRAIL Textured Colors Black Fine TextureBrown Fine Texture Gloss BeigeGloss White Sandy Shore Speckled WalnutNinety Bronze Satin BlackChocolate Non Textured Colors WithAccessibility Ramp Indoors 1-3/8" Handrail (8’, 10’ & 16’) Internal Connector Collar Rings (to cover splice) Internal End Cap 180° Elbow Adjustable Elbow 90° Elbow 90° Welded Elbow Inside Corner Mount (attaches to post)Wall Mount Extended Wall Mount Wall Return Wall-End Mount INSTALLATION EXAMPLES 90° Welded Elbow DetailExtended Wall Mount DetailInside Corner Mount & 90° Elbow Detail • Easy to install on any surface • A variety of handrail lengths and accessories allow for a customized handrail • Perfect safety solution for both residential and commercial stairways, ramps, and decks • Compatible with new or existing railing systems • Finished with an advanced powder coating process for a color-fast appearance that lasts a lifetime • Lifetime Limited Warranty ADVANTAGES 1 2 3 4 5 6 7 8 9 12 131011 5 2 12 10 1 6 3 4 13 7 9 9 7 11 8 Stair Deck 0.140" WallØ118"Ø138"DRAWN BY:EHDATE DRAWN:STYLE:3446 US 6 EASTBremen, IN 46506diggerspecialties.comREV.1234ADCBAS SHOWN:1.375 AluminumHandrailDRAFT NO.:20200225-1ELOC:Z:\Aluminum\ADA ContinuousHandrailSCALE = 1":1"02-25-2020REV.LOC.REVISIONDATEAUpdated Logos1/6/21A 2316"38"358"2"212"58"12"114"Ø0.250"DRAWN BY:EHDATE DRAWN:STYLE:3446 US 6 EASTBremen, IN 46506diggerspecialties.comREV.1234ADCBAS SHOWN:Wall MountDRAFT NO.:20200225-1ELOC:Z:\Aluminum\ADA ContinuousHandrailSCALE = 1":1"02-25-2020REV.LOC.REVISIONDATEAUpdated Logos1/6/21A