Loading...
HomeMy WebLinkAboutReceipt Shestak, Joe From:Conn, Angelina V Sent:Friday, December 15, 2023 11:51 AM To:Lopez, Alexia K; Brown, Libby; Butler, Bric; Dean, Charlie G; Glaspie, Larysa E; Grechukhin, Sergey; Hohlt, William G; Hollibaugh, Mike P; Jesse, Christina; Jordan, Alex; Kass, Joslyn; Keeling, Adrienne M; Keesling, Rachel M; Littlejohn, David W; Luckoski, Todd C; Martin, Candy; Mestetsky, Henry; Mindham, Daren; Mishler, Nicholas F; Motz, Lisa; Oberlander, Jon A; Renick, Timothy; Rinehart, Morgan; Shalit, Aliza; Shestak, Joe; Shively, Matthew; Thomas, John G; Warner, Caleb; Willie Hall Cc:Amber Sheller; Pete Rankovich; Todd Fenoglio Subject:Docket No. Assignment: Cherry Tree Elementary School Modifications (PZ-2023-00290 TAC) Follow Up Flag:Follow up Flag Status:Completed The assigned Docket Number for this item is the following: ________________________________________________________________________________________________ Docket No. PZ-2023-00290 TAC: Cherry Tree Elementary School Addition and Renovation. The applicant seeks administrative approval for a building addition, building renovations, and site modifications. The site is located at 13890 Hazel Dell Pkwy. It is zoned S1/Residence. Filed by Amber Sheller of TLF Engineers, on behalf of Carmel Clay Schools. (Amber can be contacted at 317-334-1500 or asheller@tlf-engineers.com.) FILING FEES: TAC (only) Application Exempt Total Due: $0.00 Petitioner, please note the following: 1. This item will be on the Wednesday, January 17, 2024 meeting agenda of the Technical Advisory Committee (TAC), which begins at 9:00 AM. Please have a representative attend this virtual meeting. (If not done so already, please distribute plans to each TAC Member for review/approval as soon as possible. Note: Not all TAC Members use ProjectDox; their plan receipt preferences are listed on the TAC Members list online). 2. Mailed and Published Public Notice does not need to occur. 3. This item will be reviewed administratively by this Dept. and TAC. 4. The filing fee is due prior to the Planning Director’s approval (signature on the final plat). Checks can be made out to The City of Carmel, or you can pay via credit card but with a small transaction fee. (N/A) 5. Please refer to the application/checklist for more detail. 6. Review comments from the Planning/Zoning Dept. will be issued via ProjectDox, our online electronic plan review software. Sincerely, Angie Conn, AICP | Planning Administrator City of Carmel Planning & Zoning Dept. 1 Civic Square, 3rd Flr., Carmel, IN 46032 1 O: 317-571-2417 | W: carmeldocs.com 2