Loading...
HomeMy WebLinkAboutA302 - BUILDING ELEVATIONSVERIFICATION NOTE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CLEARANCES AND ALL EXISTING FIELD CONDITIONS BEFORE STARTING CONSTRUCTION. COMMENCEMENT OF WORK CONSTITUTES ACCEPTANCE OF CONDITIONS. SHOULD DIFFERENT CONDITIONS BE ENCOUNTERED, CONTACT THE ARCHITECT BEFORE PROCEEDING WITH WORK. ELEVATION GENERAL NOTES 1. REFER TO THE ELECTRICAL AND TECHNOLOGY DRAWINGS FOR CAMERA, LOCATIONS, SECURITY DEVICES, RECEPTACLES, LIGHT FIXTURES, ETC. COORDINATE LOCATIONS WITH VENEER COURSING TO PROVIDE CONSISTENT MOUNTING HEIGHTS. 2. REFER TO PLUMBING DRAWINGS FOR EXTERIOR WALL HYDRANTS, SECONDARY ROOF DRAIN OUTLETS, ETC. COORDINATE PENETRATIONS THROUGH EXTERIOR ENVELOPE WITH OTHER TRADES. PROVIDE TRANSITION MEMBRANE TO MAINTAIN AIR BARRIER SYSTEM. 3. REFER TO MECHANICAL DRAWINGS FOR EXTERIOR LOUVER LOCATIONS LOCATED IN EXTERIOR WALL AND EXTERIOR SOFFITS. COORDINATE PENETRATIONS THROUGH EXTERIOR ENVELOPE WITH OTHER TRADES. PROVIDE TRANSITION MEMBRANE TO MAINTAIN AIR BARRIER SYSTEM. 4. REMOVE EXISTING GUTTERS, DOWNSPOUTS, AND CAST IRON D.S. BOOTS FOR THE ENTIRE PROJECT. PROVIDE NEW GUTTERS, DOWNSPOUTS AND CAST IRON DOWNSPOUT BOOTS IN SAME LOCATION AS EXISTING. ALIGN NEW CAST IRON D.S. BOOTS WITH EXISTING UNDERGROUND STORM PIPING. FIELD VERIFY EXISTING STORM PIPING SIZES TO MATE WITH NEW BOOTS. 5. REFER TO FLOOR PLANS AND EXTERIOR ELEVATIONS FOR NEW BUILDING ADDITION. 6. PROVIDE PROTECTION SHEET AT LOCATIONS WHERE DOWNSPOUTS EMPTY ONTO LOW SLOPE ROOF. 7. PROVIDE ELBOWS AT BASE OF DOWNSPOUTS WHERE THEY EMPTY ONTO LOWER SLOPED ROOF. 8. PROVIDE OFFSET AT BASE OF D.S. WHERE MASONRY EXTENDS PAST FACE OF WALL ABOVE. 9. CLEAN FULL PERIMETER AND HEIGHT OF EXTERIOR VENEER MASONRY INCLUDING THE MASONRY SCREEN WALL NEAR MECHANICAL EQUIPMENT AREA. 10. CLEAN FULL EXTENTS AND HEIGHT OF EXISTING EXTERIOR EIFS MATERIAL. 11. REPAIR EXISTING DAMAGED EXTERIOR EIFS. REFER TO ELEVATIONS. PROVIDE NEW EIFS ELASTOMERIC COATING OVER FULL EXTENTS AND HEIGHT OF EXISTING EIFS SURFACES TO REMAIN. 12. PROVIDE GUTTER EXPANSION JOINTS WHEN LENGTH OF GUTTER EXCEEDS 40 FEET. REFER TO DETAIL. 13. PROVIDE CORNER SPLASH GUARDS AT ALL VALLEY LOCATIONS - REFER TO DETAIL. EXTERIOR ELEVATION NOTES X FIRST FLOOR EL 100'-0" 1 A5.01 C A4.01 8" x 8" GLAZED ACCENT TILE ADHERED TO 4" CMU (ECMT) ALUMINUM STOREFRONT FRAMING 1 A5.02 2 A5.01 3 A5.01 3 A5.02 1 A5.03 23-H23-F23-E23-D23-Cc23-Cb23-C23-B 23-Cd23-Ca MODULAR SIZE FACE BRICK -COLOR A EXISTING BUILDING 2" WATER-DRAINAGE-EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) SHEET METAL TRIM METAL GUTTER 6" BED DEPTH UTILITY SIZE FACE BRICK - COLOR B 5 A5.01 T./MASONRY EXISTING BUILDING EXISTING BUILDING EJ EJ A3.02 5 EJ EJ EJ EJ EJ 2" WATER-DRAINAGE-EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) STANDING SEAM METAL ROOF PANELS 2 A7.07 22'-4" +/-12" HIGH BUILDING SIGNAGE 6" HIGH BUILDING ADDRESS FIRST FLOOR EL 100'-0" 3 A5.04 23-H 23-F 23-E 23-D 23-Cc 23-Cb 23-C 23-B 1 A5.05 2 A5.05 23-Cd 23-Ca 8" x 8" GLAZED ACCENT TILE ADHERED TO 4" CMU (ECMT) MODULAR SIZE FACE BRICK -COLOR A ALUMINUM STOREFRONT FRAMING 5 A5.01 1 A5.09 METAL COPING EJ EJ EJEJ EJ EJ 6" BED DEPTH UTILITY SIZE FACE BRICK - COLOR B FIRST FLOOR EL 100'-0" A A4.01 B A4.01 B7 MEZZANINE EL 112'-0" B6 4 A5.04 D A4.01 2 A5.03 B5 B4 B2 B1 3 A5.05 ? 2" WATER-DRAINAGE-EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) 4" X 5" METAL DOWNSPOUT TO SITE BOOT BELOW MEMBRANE ROOFING SYSTEM (ADHERED) - REFER TO ROOF PLAN STANDING SEAM METAL ROOF PANELS METAL COPING MODULAR SIZE FACE BRICK -COLOR A 6" BED DEPTH UTILITY SIZE FACE BRICK - COLOR B ALUMINUM STOREFRONT FRAMING MEMBRANE ROOFING SYSTEM (ADHERED) - REFER TO ROOF PLAN 5 A5.08 B3 23'-5"2" WATER-DRAINAGE-EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) FIRST FLOOR EL 100'-0" A A4.01 B A4.01 B7 MEZZANINE EL 112'-0" A5.02 1 B6 D A4.01 2 A5.03 B5B4B2B1 1 A5.04 2 A5.04 3 A5.05 2" WATER-DRAINAGE-EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) MODULAR SIZE FACE BRICK -COLOR A 6" BED DEPTH UTILITY SIZE FACE BRICK - COLOR B ALUMINUM STOREFRONT FRAMING METAL GUTTER MEMBRANE ROOFING SYSTEM (ADHERED) - REFER TO ROOF PLAN 2" WATER-DRAINAGE-EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) 4" X 5" METAL DOWNSPOUT TO SITE BOOT BELOW 5 A5.08 B3 STANDING SEAM METAL ROOF PANELS 3 A5.0123-F 8"8"8"3'-9"8"8"8"8" x 8" GLAZED ACCENT TILE ADHERED TO 4" CMU (ECMT) COPYRIGHT 2023 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT 12/13/2023 5:30:48 PMC:\Users\tvaughn\Documents\2021_ARCH_222011.00_tpvaughn.rvtPROJECT NUMBER: 222011.00 CHERRY TREE ELEMENTARY SCHOOL ADDITIONS AND RENOVATIONS 13989 Hazel Dell Pkwy, Carmel, IN 46033 BUILDING ELEVATIONS A3.02 PROJECT ISSUE DATE: 12.15.2023 BIDS DRAWN BY: TPV 317-848-0966 350 E. NEW YORK ST, INDIANAPOLIS IN 46204 PROJECT MANAGER: SAM CARMEL CLAY SCHOOLS SCALE: 1/4" = 1'-0" EAST ELEVATION1 SCALE: 1/8" = 1'-0" WEST ELEVATION - NEW ADDITION2 SCALE: 1/8" = 1'-0" NORTH ELEVATION3 SCALE: 1/8" = 1'-0" SOUTH ELEVATION4 SCALE: 1/2" = 1'-0" ACCENT TILE ELEVATION5 REV. NO.DESCRIPTION DATE