Loading...
HomeMy WebLinkAboutA010.9 Solar Canopy Preliminary Engineering DrawingCODE: 2018 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC) DESIGN LOADS: 1. ROOF: LIVE LOAD(REDUCIBLE) 12 PSF DEAD LOAD (SOLAR STRUCTURE) 8 PSF DEAD LOAD (STEEL DECK STRUCTURE) 6 PSF 2. WIND LOAD: RISK CATEGORY I BASIC WIND SPEED, V : 100 MPH EXPOSURE CATEGORY: C IMPORTANCE FACTOR, Iw: 1.0 MEAN ROOF HEIGHT: 15 FT G: 0.85 Kd: 0.85 Kzt: 1.0 Kz: 0.85 ENCLOSURE CLASSIFICATION: OPEN BUILDING 3. SNOW LOAD: RISK CATEGORY I GROUND SNOW LOAD, Pg: 5 PSF IMPORTANCE FACTOR, Is: 1.0 THERMAL FACTOR, Ct: 1.2 EXPOSURE: C EXPOSURE FACTOR: 0.9 FLAT ROOF SNOW LOAD, Pf: 3.8 PSF MINIMUM SNOW LOAD, Pm: 5 PSF SLOPED ROOF FACTOR, Cs: 1.0 DESIGN ROOF SNOW LOAD, Ps: 5 PSF 4.SEISMIC LOADS: RISK CATEGORY I IMPORTANCE FACTOR, Ie : 1.0 SEISMIC SITE CLASS: D -DEFAULT Ss: 0.106 S1: 0.055 SDS: 0.113 SD1: 0.088 SEISMIC DESIGN CATEGORY: B BASIC SEISMIC FORCE RESISTING SYSTEM: STEEL ORDINARY CANTILEVER COLUMN SYSTEMS R: 1.25 Ω: 1.25 Cd: 1.25 Cs: 0.090 BASE SHEAR, V: 0.090W GENERAL: 1. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES. 2. THE CONTRACTOR IS RESPONSIBLE FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK THAT CONFORMS TO THE REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) SAFETY AND HEALTH STANDARDS FOR THE CONSTRUCTION INDUSTRY. 3. WHERE REFERENCE IS MADE TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH STANDARDS SHALL BE THE LATEST EDITION AND/OR ADDENDUM. 4. OPTIONS ARE FOR CONTRACTOR'S CONVENIENCE. HE SHALL BE RESPONSIBLE FOR ALL CHANGES NECESSARY IF HE CHOOSES AN OPTION AND HE SHALL COORDINATE ALL DETAILS. 5. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL STRUCTURAL NOTES AND TYPICAL DETAILS. WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION SHALL CONFORM TO SIMILAR WORK ON THE PROJECT. 6. TYPICAL DETAILS ARE NOT CUT ON DRAWINGS, BUT APPLY UNLESS NOTED OTHERWISE. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL DIMENSIONS WITH ACTUAL SITE CONDITIONS AND GENERAL CONTRACTOR PRIOR TO START OF CONSTRUCTION. ALL DIMENSIONS SHOWN ON STRUCTURAL DRAWINGS ARE TO ASSIST CONTRACTOR IN VERIFICATION. DO NOT SCALE DIMENSIONS FROM DRAWINGS. 8. ITEMS SHOWN BY OTHER DISCIPLINES WITH REFERENCE TO STRUCTURAL DRAWINGS BUT NOT SHOWN ON THESE STRUCTURAL DRAWINGS SHALL BE CONSIDERED DESIGN BUILD ITEMS. CONTRACTOR SHALL SUBMIT DESIGN BY OTHERS FOR REVIEW FOUNDATIONS: 1. GEOTECHNICAL CONSULTANT: N/A 2. DESIGN SOIL BEARING VALUES WERE ASSUMED IN ACCORDANCE WITH SOIL CLASS 5 AS DEFINED IN IBC/CBC TABLE 1806.2 "PRESUMPTIVE LOAD-BEARING VALUES". DESIGN BEARING VALUE OF 1,500 PSF AND LATERAL BEARING VALUE OF 100 PSF/FT WAS USED IN DESIGN. IF ACTUAL SOIL CONDITIONS DIFFER NOTIFY THE STRUCTURAL ENGINEER PRIOR TO PROCEEDING WITH WORK. 3. SPREAD FOOTINGS SHALL BEAR ON COMPACTED NATIVE SOILS. BOTTOM OF FOOTINGS SHALL BEAR AT A DEPTH NOT LESS THAN 2.0 FT BELOW LOWEST ADJACENT GRADE WITHIN 5 FEET OF STRUCTURE OR FOUNDATION. FOUNDATION EXCAVATIONS SHALL BE INSPECTED BY GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT OF CONCRETE. 4. DRILLED POLE FOUNDATIONS SHALL BEAR ON MACHINE CLEANED, INSPECTED SOIL STRATA. POLE FOUNDATIONS WERE DESIGNED IN ACCORDANCE WITH THE PRESCRIPTIVE METHOD OF IBC/CBC SECTION 1807.3.2. FOR TOP OF POLE FOUNDATION ELEVATIONS, SEE FOUNDATION PLANS AND SECTIONS. IF WATER IS ENCOUNTERED DURING DRILLING, STOP AND CONSULT STRUCTURAL ENGINEER OR GEOTECHNICAL ENGINEER FOR RESOLUTION. SHOP DRAWINGS: 1. SHOP DRAWINGS SHALL BE SUBMITTED FOR ALL STRUCTURAL ITEMS AND ITEMS REQUIRED BY ARCHITECTURAL SPECIFICATIONS. UNITED STRUCTURAL DESIGN, LLC. ASSUMES NO RESPONSIBILITY FOR THE FAILURE OF THE CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR REVIEW. 2. ITEMS NOT IN ACCORDANCE WITH CONTRACT DOCUMENTS SHALL BE FLAGGED UPON CONTRACTORS REVIEW 3. THE CONSTRUCTION DOCUMENTS MAY NOT BE REPRODUCED FOR USE AS SHOP DRAWINGS. 4. ELECTRONIC FILES OF CONSTRUCTION DOCUMENTS WILL NOT BE MADE AVAILABLE FOR USE AS SHOP DRAWINGS. 5. FIELD VERIFY ALL DIMENSIONS AND FINISHED GRADE PRIOR TO CONSTRUCTION AND PRIOR TO BEGINNING SHOP DRAWINGS. 6. THE ENGINEER OF RECORD HAS THE RIGHT TO APPROVE OR DISAPPROVE ANY CHANGES TO CONTRACT DOCUMENTS AT ANYTIME BEFORE OR AFTER SHOP DRAWING REVIEW. 7. ITEMS OMITTED OR SHOWN INCORRECTLY AND ARE NOT FLAGGED BY THE STRUCTURAL ENGINEER OR ARCHITECT SHALL NOT BE CONSIDERED CHANGES TO THE CONTRACT DOCUMENTS. 8. SHOP DRAWINGS DO NOT REPLACE THE CONTRACT DOCUMENTS. REVIEWING IS INTENDED ONLY AS AN AID TO THE CONTRACTOR IN OBTAINING CORRECT SHOP DRAWINGS. IT IS THE CONTRACTOR’S RESPONSIBILITY TO ENSURE ALL ITEMS ARE CONSTRUCTED ACCORDING TO THE CONTRACT DOCUMENTS. CONCRETE: 1. CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS OF ACI 301, "STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE" AND ACI 318, "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE". 2. ADDITION OF WATER TO THE BATCH FOR MATERIAL WITH INSUFFICIENT SLUMP WILL NOT BE PERMITTED, UNLESS THE SUPPLIER HAS SPECIFICALLY WITHHELD WATER FROM THE BATCH AT THE PLANT. IN SUCH CASE THE MIX DESIGN AND TRUCK TICKET MUST CLEARLY STATE THE MAXIMUM AMOUNT OF WATER THAT CAN BE ADDED TO THE BATCH ON SITE. IN NO CASE SHALL THE DESIGN WATER TO CEMENTITIOUS MATERIAL RATIO BE EXCEEDED. 3. MECHANICALLY VIBRATE ALL CONCRETE WHEN PLACED, EXCEPT THAT SLABS ON GRADE NEED BE VIBRATED ONLY AROUND SLAB EDGES, REINFORCING, AND COLUMNS. MECHANICALLY VIBRATE ONLY THE TOP 5 FEET OF DRILLED PIER CONCRETE. REVIBRATE TOP OF DRILLED PIER 15 MINUTES AFTER PLACING CONCRETE. 4. TEST DATA FOR CONCRETE SUBMITTALS SHALL BE SUBMITTED FOR REVIEW PRIOR TO PLACEMENT OF CONCRETE. REFERENCE ACI 318 CHAPTER 5, TABLE R5.3 FOR SPECIFIC REQUIREMENTS. 5. DRILLED PIER CONCRETE SHALL BE CHANNELED TO FREE FALL DOWN THE SHAFT WITHOUT STRIKING THE REINFORCING OR THE SIDES OF THE SHAFT. MAXIMUM HEIGHT OF FREE-FALL IS 15'-0". 6. CONCRETE PROPERTIES: CONCRETE USE MINIMUM 28 DAY COMPRESSIVE STRENGTH UNLESS NOTED OTHERWISE ALL CONCRETE SHALL BE 4,500 PSI PHOTOVOLTAIC PANELS: 1. THE PANEL MANUFACTURER IS RESPONSIBLE FOR THE DESIGN OF THE PANELS AND THE DESIGN OF THE PANEL CONNECTIONS TO THE STRUCTURE INCLUDING ALL COMPONENTS REQUIRED TO MAKE THE CONNECTIONS. PHOTOVOLTAIC PANELS, COMPONENTS AND CONNECTIONS SHALL BE DESIGNED TO SUPPORT PANEL WEIGHT PLUS SNOW, WIND, OR SEISMIC LOADING, WHICHEVER COMBINATION PRODUCES THE MOST SEVERE CONDITION IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. 2. OWNER TO PROVIDE PANEL CAPABLE OF SUPPORTING IN MANOR IN WHICH IS INTENDED BY THESE DRAWINGS (I.E. SUPPORTED BY SHORT END, DUAL SUPPORTS, ETC). SUBMIT PANEL SPEC SHEETS FOR REVIEW PRIOR TO PURCHASING ANY PANELS. 3. CONTRACTOR TO VERIFY PV PANELS WITH OWNER PRIOR TO FABRICATION. 4. THIS IS A DEFERRED SUBMITTAL ITEM. STRUCTURAL STEEL: 1. LATEST AISC AND AWS CODES APPLY. THE WORD APPROVED INSPECTION 4.4 OF THE AISC CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES IS REDEFINED AS REVIEWED. 2. STEEL SHALL BE FINISHED AT LOCATIONS EXPOSED TO WEATHER WITH A CORROSION RESISTANT COATING APPLICABLE TO WEATHER AND EXPOSURE CONDITIONS OF PROJECT LOCATION. 3. WHEN STRUCTURAL STEEL IS FURNISHED TO A SPECIFIED MINIMUM YIELD POINT GREATER THAN 36 KSI, THE ASTM OR OTHER SPECIFICATION DESIGNATION SHALL BE INCLUDED NEAR THE ERECTION MARK ON EACH SHIPPING ASSEMBLY OR IMPORTANT CONSTRUCTION COMPONENT OVER ANY SHOP COAT OF PAINT PRIOR TO SHIPMENT FROM THE FABRICATORS PLANT. 4. IF IT IS NECESSARY TO SPLICE ANY MEMBER, SPLICE LOCATIONS ARE SUBJECT TO REVIEW BY STRUCTURAL ENGINEER. SPLICES SHALL BE FULL PENETRATION WELDED AND TESTED PER THIS SECTION. INDICATE ALL SPLICE LOCATIONS, AND WELDING PROCEDURES ON SHOP DRAWINGS FOR REVIEW PRIOR TO FABRICATION. 5. ALL BEAMS SHALL BE ERECTED WITH THE NATURAL CAMBER UPWARDS. 6. ALL BOLTS SHALL BE INSTALLED WITH STEEL WASHERS. 7. ALL WELDING BY WELDERS HOLDING VALID CERTIFICATES AND HAVING CURRENT EXPERIENCE IN TYPE OF WELD SHOWN ON THE DRAWINGS OR NOTES, CERTIFICATES SHALL BE THOSE ISSUED BY AN INDEPENDENT TESTING AGENCY. 8. ALL WELDING DONE BY E70 SERIES LOW HYDROGEN RODS. USE E90 SERIES FOR ASTM A706 REINFORCING BARS. 9. ALL WELDING PER AMERICAN WELDING SOCIETY STANDARDS. ALL WELDS ON DRAWINGS ARE SHOWN AS SHOP WELDS. CONTRACTOR MAY SHOP WELD OR FIELD WELD AT THEIR DISCRETION. SHOP WELDS OR FIELD WELDS SHALL BE SHOWN ON SHOP DRAWINGS. 10. SLAG SHALL BE REMOVED FROM ALL COMPLETED WELDS, AND THE WELD AND ADJACENT BASE METAL SHALL BE CLEANED BY BRUSHING OR OTHER SUITABLE MEANS. WELDED JOINTS SHALL NOT BE PAINTED UNTIL AFTER WELDING HAS BEEN COMPLETED AND THE WELD ACCEPTED. 11. ALL STRUCTURAL STEEL SHALL BE FABRICATED BY A FABRICATOR WITH ANY ONE OF THE FOLLOWING MINIMUM QUALIFICATIONS. QUALIFICATIONS SHALL BE IN EFFECT AT TIME OF BID. 12. AISC CERTIFIED FABRICATOR (STD). 13. STEEL PROPERTIES • WIDE FLANGE COLUMNS, BEAMS AND TEES: ASTM A992 (Fy = 50 KSI) • STEEL PLATES: ASTM A572 (Fy = 50 KSI) • CHANNELS AND ANGLES: ASTM A36 (Fy = 36 KSI) • HSS RECTANGULAR STEEL: ASTM A500 Gr. B (Fy = 46 KSI) • BOLTS: ASTM A325 OR ASTM A F1852 TWIST-OFF TYPE • ANCHOR RODS: ASTM F1554 Gr. 55 (Fy = 55 KSI) 14. STEEL BOLTS SHALL BE PRETENSIONED UNLESS OTHERWISE NOTED AS A SNUG-TIGHT CONNECTION ON THE DRAWINGS OR DETAILS. ONE OF THE FOLLOWING METHODS SHALL BE USED TO ASSURE ADEQUATE PRETENSIONING IS ACHIEVED: • TURN-OF-NUT METHOD • DIRECT TENSION INDICATOR WASHERS • CALIBRATED WRENCH • TWIST-OFF TYPE BOLT STEEL REINFORCING: 1. ALL BARS PER CRSI SPECIFICATIONS AND HANDBOOK. LATEST ACI CODE AND DETAILING MANUAL APPLY. SECURELY TIE ALL BARS IN LOCATION BEFORE PLACING CONCRETE. REINFORCING BAR SPACING GIVEN ARE MAXIMUM ON CENTERS. 2. ALL REINFORCING TO BE WELDED SHALL BE WELDED IN ACCORDANCE WITH AWS D1.4. NO TACK WELDING OF REINFORCING BARS IS ALLOWED WITHOUT PRIOR REVIEW OF PROCEDURE BY STRUCTURAL ENGINEER. 3. REINFORCING LAP SPLICES IN CONCRETE SHALL BE PER TYPICAL DETAIL UNLESS NOTED OTHERWISE. ALL SPLICE LOCATIONS ARE SUBJECT TO APPROVAL. PROVIDE BENT CORNER BARS TO MATCH AND LAP WITH HORIZONTAL BARS AT CORNERS AND INTERSECTIONS OF FOOTINGS AND WALLS. 4. TYPICAL REINFORCING BAR STRENGTHS 5. REINFORCING (WELDABLE): ASTM A706, DEFORMED, Fy = 60 KSI 6. TYPICAL CLEAR CONCRETE COVERAGE • CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3" • FORMED CONCRETE EXPOSED TO EARTH OR WEATHER: #6 AND LARGER: 2" #5 AND SMALLER: 1 1/2" ALL OTHERS PER LATEST EDITION OF ACI 318. 1704.2.5 SPECIAL INSPECTION OF FABRICATORS: SPECIAL INSPECTION OF FABRICATION OF STRUCTURAL STEEL BEING PERFORMED ON THE PREMISES OF A FABRICATOR'S SHOP IS REQUIRED. EXCEPTION: SPECIAL INSPECTIONS OF FABRICATORS WITH ONE OF THE FOLLOWING QUALIFICATIONS IS NOT REQUIRED: • INTERNATIONAL ACCREDITATION SERVICE, INC. (IAS)APPR OVED FABRICATOR. • AISC CERTIFIED FABRICATOR (STD). THE SPECIAL INSPECTOR SHALL VERIFY THAT THE FABRICATOR MAINTAINS DETAILED FABRICATION AND QUALITY CONTROL PROCEDURES THAT PROVIDE A BASIS FOR INSPECTION CONTROL OF THE WORKMANSHIP AND THE FABRICATOR’S ABILITY TO CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND REFERENCED STANDARDS. THE SPECIAL INSPECTOR SHALL REVIEW THE PROCEDURES FOR COMPLETENESS AND ADEQUACY RELATIVE TO THE CODE REQUIREMENTS FOR THE FABRICATOR’S SCOPE OF WORK. SPECIAL STRUCTURAL INSPECTIONS: PER IBC/CBC SECTION 1704 AND 1705 SPECIAL INSPECTIONS ARE IN ADDITION TO THE REQUIRED INSPECTION CONDUCTED BY THE BUILDING JURISDICTION PER IBC/CBC SECTION 110. THE TYPES OF WORK LISTED BELOW SHALL BE INSPECTED BY A SPECIAL INSPECTOR. 1. ALL SPECIAL INSPECTORS SHALL BE UNDER THE SUPERVISION OF A REGISTERED CIVIL OR STRUCTURAL ENGINEER. 2. THE QUALIFICATIONS OF ALL SPECIAL INSPECTORS SHALL BE REVIEWED AND APPROVED BY THE STRUCTURAL ENGINEER OF RECORD. 3. THE MINIMUM QUALIFICATIONS FOR THE SPECIAL INSPECTORS ARE AS FOLLOWS: • CONCRETE INSPECTION -IcC CERTIFICATION IN REINFORCED CONCRETE OR E.I.T. CERTIFICATION. • STRUCTURAL WELDING INSPECTION • VISUAL TESTING -IcC CERTIFICATION IN STRUCTURAL STEEL AND WELDING OR A.W.S. CERTIFIED WELD INSPECTOR (C.W.I.). • NON-DESTRUCTIVE TESTING -A.W.S. C.W.I. • HIGH STRENGTH BOLTING INSPECTION -IcC CERTIFICATION IN STRUCTURAL STEEL AND WELDING. • SPECIAL CASES -EXPERIENCE ACCEPTABLE TO THE STRUCTURAL ENGINEER OF RECORD. 4.DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR: • THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK REQUIRING SPECIAL INSPECTION FOR CONFORMANCE WITH THE APPROVED DESIGN DRAWINGS AND SPECIFICATIONS. • THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO BE KEPT AT THE SITE FOR USE BY THE BUILDING OFFICIAL, THE CONTRACTOR, THE STRUCTURAL ENGINEER OF RECORD, AND THE ARCHITECT OF RECORD. IF SPECIAL INSPECTION IS PROVIDED BY ANYONE OTHER THAN THE STRUCTURAL ENGINEER OF RECORD, INSPECTION REPORTS SHALL BE SUBMITTED TO THE OFFICE OF THE STRUCTURAL ENGINEER ON A WEEKLY BASIS. ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION, THEN IF UNCORRECTED, TO THE DESIGN AUTHORITY AND THE BUILDING OFFICIAL. • UPON COMPLETION OF THE ASSIGNED WORK, THE SPECIAL INSPECTOR SHALL COMPLETE AND SIGN A FINAL REPORT CERTIFYING THAT TO THE BEST OF HIS KNOWLEDGE, THE WORK IS IN CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS, AND THE APPLICABLE WORKMANSHIP PROVISIONS OF THE CODE. 5.DUTIES AND RESPONSIBILITIES OF THE CONTRACTOR: • NOTIFY THE RESPONSIBLE INSPECTOR THAT WORK IS READY FOR INSPECTION AT LEAST ONE WORKING DAY (24 HOURS MINIMUM) BEFORE SUCH INSPECTION IS REQUIRED. • ALL WORK REQUIRING SPECIAL STRUCTURAL INSPECTION SHALL REMAIN ACCESSIBLE AND EXPOSED UNTIL IT IS OBSERVED BY THE SPECIAL STRUCTURAL INSPECTOR. 6.SPECIAL INSPECTION • INSPECTION OF FABRICATORS • INSPECTION OF CONCRETE CONSTRUCTION • INSPECTION OF STRUCTURAL STEEL • INSPECTION OF SOILS SEE TABLES ON GSN FOR ADDITIONAL INFORMATION. TABLE 1705.6: REQUIRED VERIFICATION AND INSPECTION OF SOILS 1705.6 SPECIAL INSPECTION OF SOILS SPECIAL INSPECTION FOR EXISTING SITE SOIL CONDITIONS, FILL PLACEMENT AND LOAD-BEARING REQUIREMENTS SHALL BE AS REQUIRED BY TABLE 1705.6. VERIFICATION AND INSPECTION TASK CONTINUOUSPERIODIC1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACITY.X 2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED PROPER MATERIAL.X 3. PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS. X 4. VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES DURING PLACEMENT AND COMPACTION OF COMPACTED FILL. X 5. PRIOR TO PLACEMENT OF COMPACTED FILL, OBSERVE SUBGRADE AND VERIFY THAT SITE HAS BEEN PREPARED PROPERLY. X TABLE 1705.3: REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION 2018 1705.3 SPECIAL INSPECTION OF CONCRETE CONSTRUCTION SPECIAL INSPECTION AND VERIFICATIONS FOR CONCRETE CONSTRUCTION SHALL BE AS REQUIRED BY TABLE 1705.3. EXCEPTIONS: SPECIAL INSPECTIONS SHALL NOT BE REQUIRED FOR: 1. ISOLATED SPREAD CONCRETE FOOTINGS OF BUILDING THREE STORIES OR LESS ABOVE GRADE PLANE THAT ARE FULLY SUPPORTED ON EARTH OR ROCK. 2. CONTINUOUS CONCRETE FOOTINGS SUPPORTING WALLS OF BUILDINGS THREE STORIES OR LESS ABOVE GRADE PLANE THAT ARE FULLY SUPPORTED ON EARTH OR ROCK WHERE: 3. THE FOOTINGS SUPPORT WALLS OF LIGHT-FRAME CONSTRUCTION; 4. THE STRUCTURAL DESIGN OF THE FOOTING IS BASED ON A SPECIFIED COMPRESSIVE STRENGTH, f'c, NO GREATER THAN 2,500 PSI REGARDLESS OF THE COMPRESSIVE STRENGTH SPECIFIED. 5. CONCRETE SLABS ON GRADE. STEEL REINFORCING STILL REQUIRES SPECIAL INSPECTION. VERIFICATION AND INSPECTION CONTINUOUSPERIODICREFERENCE STANDARD IBC/CBC REFERENCE 1. INSPECT REINFORCEMENT, INCLUDING PRESTRESSING TENDONS, AND VERIFY PLACEMENT. 2. REINFORCING BAR WELDING. a. VERIFY WELDABILITY OF REINFORCING BARS. b. INSPECT SINGLE PASS FILLET WELDS, MAXIMUM 5/16". c. INSPECT ALL OTHER WELDS. 5. VERIFYING USE OF REQUIRED DESIGN MIX. 7. INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES. 8. VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES. 12. INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED. X X X X X ACI 318: Ch. 20, 25.2, 25.3, 26.6.1-26.6.3 AWS D1.4 ACI 318: 26.6.4 ACI 318: Ch 19, 26.4.3, 26.4.4 ACI 318: 26.5 ACI 318: 26.5.3-26.5.5 ACI 318:26.11.2 (b) 1908.4 1904.1, 1904.2, 1908.2, 1908.3 1908.6, 1908.7, 1908.8 1908.9 X X X NUMERICAL QUANTITIES WHEN ENCLOSED IN PARENTHESES ARCHITECT/ENGINEER ANCHOR BOLT AGGREGATE BASE COURSE ARCHITECT AMERICAN SOCIETY FOR TESTING AND MATERIALS CALIFORNIA BUILDING CODE CAST-IN-PLACE CONTRACT DOCUMENTS CONSTRUCTION JOINT CONTROL JOINT CENTERLINE CLEAR CONCRETE MASONRY UNIT DEPTH DIAMETER DIMENSION DEAD LOAD EACH ELEVATION EQUAL EXTERIOR EACH WAY FUTURE FINISH FLOOR ELEVATION FLOOR FEET FOOTING GAUGE GALVANIZED GENERAL CONTRACTOR GENERAL STRUCTURAL NOTES HORIZONTAL HOLLOW STRUCTURAL SECTION MOMENT OF INERTIA INTERNATIONAL BUILDING CODE INSIDE DIAMETER ONE THOUSAND POUNDS KIP PER LINEAR FOOT STEEL ANGLE POUND LIVE LOAD LONG LEG BACK TO BACK LONG LEG HORIZONTAL LONG LEG VERTICAL LONG SIDE HORIZONTAL LONG SIDE VERTICAL MASONRY CONTROL JOINTS MECHANICAL MANUFACTURER NOT APPLICABLE NOT TO SCALE ON CENTER PERPENDICULAR PLATE POUNDS PER LINEAR FOOT POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH QUALITY ASSURANCE QUALITY CONTROL REINFORCING REQUIRED REQUEST FOR INFORMATION SQUARE FOOT SIMILAR SPECIFICATION STANDARD TOP AND BOTTOM TYPICAL UNLESS NOTED OTHERWISE VERTICAL WATER TO CEMENT RATIO WITHOUT WINDLOAD ABBRV TERM TERMS AND ABBREVIATIONS (#) A\E AB ABC ARCH ASTM CBC CIP CD CJ CL CLR CMU D DIA DIM DL EA EL EQ EXT EW (F) FF FLR FT FTG GA GALV GC GSN HORIZ HSS I IBC ID KIP, K KLF L LB LL LLBB LLH LLV LSH LSV MCJ MECH MFR NA NTS OC PERP PL PLF PSF PSI QA QC REINF REQD RFI SF SIM SPEC STD T&B TYP UNO VERT W/C W/O WL COLD-FORMED STEEL FRAMING: 1. ALL COLD-FORMED STEEL FRAMING SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH THE LATEST EDITION OF SPECIFICATIONS FOR THE DESIGN OF COLD-FORMED STEEL STRUCTURAL MEMBERS BY THE AMERICAN IRON AND STEEL INSTITUTE AND THE STEEL STUD MANUFACTURERS ASSOCIATION AND ICC ESR-3064P). 2. STEEL FOR ALL MEMBERS AND FOR ALL STRAPS SHALL HAVE A MINIMUM YIELD STRENGTH OF 55,000 PSI. 3. STEEL SHALL BE GALVANIZED AT LOCATIONS EXPOSED TO WEATHER AND WHENEVER NOTED ON THE DRAWINGS. 4. ALL MEMBERS SHALL BE SECURELY SEATED FOR FULL BEARING UNLESS NOTED OTHERWISE. 5. ALL WELDING SHALL BE PERFORMED BY WELDERS EXPERIENCED IN LIGHT GAGE STEEL FRAMING WORK. 6. ALL SCREWS REFERENCED IN THE DRAWINGS FOR LIGHT GAUGE CONNECTIONS SHALL BE DRIL-FLEX BY HILTI OR APPROVED EQUIVALENT (ICC ESR-3332). 7. STEEL STUD SIZES ARE AS INDICATED IN PLANS AND KEYNOTES. THICKNESS REFERENCED IN THE DRAWINGS ARE AS FOLLOWS: • 16 GAUGE MATERIAL -0.059 INCHES • 14 GAUGE MATERIAL -0.075 INCHES • 12 GAUGE MATERIAL -0.105 INCHES • 10 GAUGE MATERIAL -0.134 INCHES NOTE: THE UNCOATED MINIMUM STEEL THICKNESS OF THE COLD-FORMED STEEL PRODUCTS AS DELIVERED TO THE JOB SITE SHALL NOT AT ANY LOCATION BE LESS THAN 95 PERCENT OF THE DESIGN THICKNESS INDICATED ABOVE. SHEET NAME PROJECT NUMBER: DRAWN BY: CHECKED BY: DATE:2058 S. Dobson Rd. Suite 10Mesa, AZ 85202(480) 454-6408www.unitedstr.comS0.1 GENERAL STRUCTURAL NOTES 23375 KS JE 08/28/2023USD #:23375Sheet List Sheet Number Sheet Name S0.1 GENERAL STRUCTURAL NOTES S1.1 OVERALL LAYOUT S2.6 6 PANEL STRUCTURE PLANS S4.1 SOLAR CANOPY DETAILS No. Description Date