Loading...
HomeMy WebLinkAboutA010.11 Solar Canopy Preliminary Engineering Drawing1. STEEL COLUMN PER PLAN. 2. CONCRETE POLE FOOTING 3. (2) #7 BARS EACH SIDE OF STEEL COLUMN (4 -TOTAL). WELD TO EACH SIDE OF COLUMN AS INDICATED. 4. FINISHED GRADE, ASPHALT OR SLAB AS OCCURS. 5. CENTERLINE OF STEEL COLUMN AND CONCRETE FOOTING. 6. ALL STEEL BELOW GRADE SHALL BE ENCASED IN 3" MINIMUM CONCRETE. 7. PROVIDE 6" EXPOSED PIER AT LOCATIONS OUTSIDE PAVED AREAS. 8. PROVIDE SLOPPED SURFACE AT TOP TO PREVENT ACCUMULATION OF WATER. 2 3 1 1'-0" MAX3" MIN.5 4 1/4 6 TYP EACH BAR 6 7 8 3" CLEAR 1 2 4'-0" MINIMUMSEE SECTIONS AND PLANS FOR DIMENSIONSSEE SECTIONS AND PLANS FOR DIMENSIONSUNO 2' - 0" DIA NOTE: AT CONTRACTORS OPTION, EXTEND STEEL COLUMN TO BOTTOM OF FOOTING IN LIEU OF THE WELDED REBAR. 1. STEEL JOIST PURLIN PER PLANS. 2. STEEL BEAM. 3. STEEL PLATE AND SCREWS PER SCHEDULE THIS DETAIL. 4. PURLIN SPLICE AT INTERIOR BEAMS ONLY. 5. 2"x14 GAUGE FLANGE BRACE STRAP WHERE SHOWN ON PLANS. 6. AT CONTRACTORS OPTION, SCREW STRAP TO PURLIN WITH (2) #12 SELF TAPPING SCREWS ILO WELD. 7. PROVIDE (2) HILTI 0.157" DIA. XU POWDER ACTUATED FASTENERS ILO WELD. 1/8 1 2 5 4 3 6 7 PURLIN DEPTH PLATE DIMENSIONS NUMBER OF SCREWS 9"3/16"x8"x6" (LSH)(6) #12 SCREWS 10"3/16"x8"x8"(6) #12 SCREWS 12"1/4"x8"x10" (LSV)(8) #12 SCREWS *LSH -LONG SIDE HORIZONTAL *LSV -LONG SIDE VERTICAL WIDTH DEPTHLIPLIP1 2 3 4 5 3 1 1. STEEL PURLIN, SEE PLANS AND GSN FOR SIZE, GAUGE AND FINISH. 2. SOLAR PANELS BY OTHERS. 3. THRU BOLT BY PANEL MFR (1/4" OR M6 DIAMETER MINIMUM). 4. SPACING BETWEEN PANELS, TYPICAL. CONTRACTOR TO VERIFY PURLIN SPACING WITH PANEL AND BRACKET SPECIFICATIONS PRIOR TO INSTALLATION. 5. MINIMUM LIP LENGTH SHALL MEET OR EXCEED THE FOLLOWING: C-SHAPES • 16 GAUGE -0.773 INCHES • 14 GAUGE -0.800 INCHES • 12 GAUGE -0.885 INCHES 1/2" 1. COLD FORMED STEEL PURLIN. 2. SOLAR PANELS BY OTHERS. 3. THRU BOLT PER PANEL MFR. (1/4" OR M6 DIAMETER MINIMUM). 4. L2"x2"x16 GAUGE STEEL SAG ANGLE WHERE SHOWN ON PLANS. ATTACH WITH (2) #12 SELF DRILLING SCREWS AT EACH PURLIN. 5. AT CONTRACTORS OPTION, USE 1 1/2"x1 1/4"x18 GAUGE STEEL HAT CHANNEL SAG ROD IN LIEU OF L2"x2"x16 GAUGE STEEL SAG ROD. 12 2 3 4 3 4, 5 1 3 3 2" 2" X SECTION X TYPICAL SAG ROD 1. STEEL BEAM PER PLAN. 2. STEEL PURLIN, ATTACH TO BEAM PER OTHER DETAILS. 3. SOLAR PANELS BY OTHERS. 4. THRU BOLT PER PANEL MFR.(1/4" OR M6 DIAMETER MINIMUM). 5. OPTIONAL MITERED END CUT.1 2 45°3 4 5 1. COLD FORMED STEEL PURLIN. 2. END CAP PER PLANS. 3. (1) #12 SELF DRILLING SCREWS TOP AND BOTTOM AT EACH PURLIN (2 -TOTAL EACH PURLIN). 1 3 2 THICKNESSLENGTH FOOTING SCHEDULE STRUCTURE FOOTING SIZE (LENGTH x WIDTH x THICKNESS) FOOTING ECCENTRICITY "e" FOOTING REINFORCING "e", NOTE 7 6 1 2 4 5 CONCRETE STRENGTH 9 5 1. STEEL COLUMN PER PLAN. 2. CONCRETE SPREAD FOOTING, SEE SCHEDULE THIS DETAIL FOR SIZE AND REINFORCING. 3. (3) #9 x 5'-0" BARS AT 6" O.C. VERTICAL WELDED TO EACH SIDE OF COLUMN FLANGE (6 TOTAL PER COLUMN). 4. FINISHED GRADE OR SLAB AS OCCURS. 5. CENTERLINE OF STEEL COLUMN AND CONCRETE FOOTING WIDTH. 6. CENTERLINE OF FOOTING LENGTH. 7. OFFSET COLUMN PER FOOTING SCHEDULE. WHERE FOOTING ECCENTRICITY EXISTS, LONGER FOOTING TOE SHALL OCCUR ON THE SIDE OF THE LARGEST CANTILEVER. 8. PROVIDE SLOPPED SURFACE AT COLUMN TO PREVENT ACCUMULATION OF WATER AGAINST STEEL. 9. PROVIDE 6" EXPOSED PIER AT LOCATIONS OUTSIDE PAVED AREAS. 3/8 TYP EACH BAR 7"6"6"3 6 PANEL Y 10'-6"x6'-0"x2'-0"0'-0"#6 AT 10" O.C. EACH WAY TOP AND BOTTOM 4,500 PSI *THIS DETAIL MAY BE USED IN LIEU OF DETAIL 2/S4.1 6 "e", NOTE 7 8 CLR3"STEEL DECK 10'-0"x5'-6"x2'-0"1'-6"#6 AT 10" O.C. EACH WAY TOP AND BOTTOM 4,500 PSI 1. STEEL PURLIN, SEE PLANS AND GSN FOR SIZE, GAUGE AND FINISH. 2. SOLAR PANELS BY OTHERS. 3. THRU BOLT BY PANEL MFR. (1/4" OR M6 DIAMETER MINIMUM). 4. SPACING BETWEEN LONG SIDE OF PANELS, TYPICAL. 5. SPACING BETWEEN SHORT SIDE OF PANELS, TYPICAL. CONTRACTOR TO VERIFY PURLIN SPACING WITH PANEL AND BRACKET SPECIFICATIONS PRIOR TO INSTALLATION. 6. END CAP. 34 1/2"1/2"5 2 1 6 C/L MOUNTING HOLESSEE PANEL SPECS1/2 TYP 3 SIDES 1/2 1. STEEL BEAM, FOR TILT DIRECTION SEE SECTIONS AND ELECTRICAL DRAWINGS. 2. STEEL COLUMN. 3. 1" X WIDTH COLUMN (OR BEAM, WHICH EVER IS GREATER) STEEL PLATE, Fy = 50 KSI MINIMUM. 4. 3/4" FULL DEPTH WEB STIFFENERS EACH SIDE OF COLUMN, ALIGNED WITH BEAM FLANGES AND AT TOP OF COLUMN AS SHOWN. 5. (4) 1" DIA. ASTM A325 BOLTS EACH SIDE OF BEAM, CENTERED ON BEAM GAUGE (8 TOTAL). TENSION BOLTS SNUG TIGHT. 6. STEEL PURLINS PER PLANS. 7. SOLAR PANELS BY OTHERS.2"3"4"3"3"4"3"3" 76 1 2 3 4 5 SHEET NAME PROJECT NUMBER: DRAWN BY: CHECKED BY: DATE:2058 S. Dobson Rd. Suite 10Mesa, AZ 85202(480) 454-6408www.unitedstr.comS4.1 SOLAR CANOPY DETAILS 23375 KS JE 08/28/2023USD #:23375NO SCALE2STEEL COLUMN AT POLE FOOTING CONNECTION NO SCALE6TYPICAL PURLIN TO STEEL BEAM CONNECTION NO SCALE9TYPICAL COLD FORMED STEEL PURLIN SECTION NO SCALE10SAG ROD AT STEEL PURLINS ATTACHMENT NO SCALE11TYPICAL PURLIN TO STEEL BEAM CONNECTION NO SCALE12TYPICAL PURLIN END CAP DETAIL NO SCALE8STEEL COLUMN AT CONCRETE SPREAD FOOTING NO SCALE13TYPICAL PANEL ATTACHMENT No. Description Date NO SCALE5STEEL BEAM TO STEEL COLUMN CONNECTION