1 1 Engineering
Alex Jordan
11/16/23 2:03 PM
Comment
Our department will require only a right-of-way permit and $5,000 license
and permit bond. This permit can be applied for here:
https://cw.carmel.in.gov/PublicAccess/template/Login.aspx
Info Only
2 1 Urban Forestry
Daren Mindham
11/20/23 1:48 PM
Changemark
add shrubs
Please fill parking lot bump out with shrubs. The original landscape plan is
uploaded to the correspondence folder for reference. Please either plant the
entire bump out appropriately with alternative shrubs or per the current
original landscape plan with 12 alpine current.
Landscape Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:08 PM
We have added (12) shrubs to the parking bump out as
requested.
Resolved
3 1 Urban Forestry
Daren Mindham
11/20/23 1:48 PM
Changemark
add shrubs2
Please plant area with shrubs. The original landscape plan is uploaded to the
correspondence folder for reference. Please either plant the entire area
appropriately with alternative shrubs or per the current original landscape
plan with 20 alpine current.
Landscape Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:09 PM
We have added (20) shrubs along western boundary of
the parking lot as requested.
Resolved
4 1 Urban Forestry
Daren Mindham
11/20/23 1:48 PM
Changemark
add shrubs3
I would recommend planting this island with matching shrubs. Parking on
this parking lot island is not permitted.
Landscape Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:10 PM
We have added (11) shrubs to this parking island as
requested. We have also added landscaping between
the existing parking lot and multi-use path along 96th
street as recommended by the Commercial Committee.
Resolved
5 1 Planning & Zoning
Christina Jesse
11/22/23 10:45 AM
Changemark
Storage enclosure
Please provide additional context on the use of the storage enclosure. What
will be stored here?
Site Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:08 PM
This storage enclosure will store the motorcycle pallets
that will remain onsite between shipments. A
photograph of these pallets has been uploaded to the
correspondence folder.
Resolved
6 1 Planning & Zoning
Christina Jesse
11/22/23 10:45 AM
Changemark
Front row parking
The row of 12 parking spaces on the south of the site abuts an extremely
wide drive aisle (49' in width). Please consider moving the parking toward
the north and installing a landscaping buffer adjacent to the southern
property line to reduce the width of this drive aisle to appear consistent with
the rest of the site design. Thank you.
Site Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:29 PM
Being a powersports dealership the owner will utilize
this space for additional site maneuverability and area
for test rides.
Resolved
REVIEW COMMENTS
Plan Review - Review Comments Report
Project Name: PZ-2023-00273 ADLS Amend - Tom Wood Honda Powerhouse
Workflow Started: 11/13/2023 10:16:10 AM
Report Generated: 02/05/2024 12:14 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
7 1 Planning & Zoning
Christina Jesse
11/22/23 12:00 PM
Changemark
Chain link
Will chain link gates or fencing be used anywhere else on site?
F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 1/15/24 7:30 AM
The gate design has been revised per staff direction.
----------------------------------------------------------
Reviewer Response: Christina Jesse - 12/22/23 5:06 PM
Thank you for updating the storage enclosure with a
masonry material. Please revise the chain link gate as
this is not compatible with the principal building design.
----------------------------------------------------------
Responsed by: Todd Mellish - 12/13/23 4:30 PM
The storage enclosure has been changed to utilize
masonry construction to complement the existing
building.
Resolved
8 1 Planning & Zoning
Christina Jesse
11/22/23 12:00 PM
Changemark
Color elevations
Please upload color elevations. Thank you.
F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 12/13/23 4:32 PM
Color elevation has been uploaded.
Resolved
9 1 Planning & Zoning
Christina Jesse
11/22/23 12:00 PM
Changemark
existing storefront windows
Please verify the existing store front windows are properly labeled. Thank
you.
F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 1/15/24 7:30 AM
Labels should be accurate for existing/new.
----------------------------------------------------------
Reviewer Response: Christina Jesse - 12/22/23 5:09 PM
It appears the newest elevations still label some of the
existing storefront windows as existing curtain wall.
Please revise.
----------------------------------------------------------
Responsed by: Todd Mellish - 12/13/23 4:32 PM
These storefront window labels have been corrected.
Resolved
10 1 Planning & Zoning
Christina Jesse
11/22/23 12:00 PM
Changemark
Existing EIFS
Please provide an exhibit illustrating the existing EIFS and proposed EIFS on
the elevations. Thank you.
F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 12/13/23 4:32 PM
These have been labeled on the elevations
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00273 ADLS Amend - Tom Wood Honda Powerhouse
Workflow Started: 11/13/2023 10:16:10 AM
Report Generated: 02/05/2024 12:14 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
11 1 Planning & Zoning
Christina Jesse
11/22/23 12:21 PM
Changemark
Lighting fixtures
Please confirm if all light fixtures proposed with this project are existing. If
additional or replacement light fixtures will be used, please upload design
details and a photometric plan. Thank you.
F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 1/15/24 7:31 AM
Existing lights to remain as is with no new exterior
fixtures.
----------------------------------------------------------
Reviewer Response: Christina Jesse - 12/22/23 5:14 PM
Please confirm if additional fixtures will be installed on
this project.
----------------------------------------------------------
Responsed by: Todd Mellish - 12/13/23 4:33 PM
The existing exterior lighting will remain.
Resolved
12 1 Sign Permits
Aliza Shalit
11/26/23 3:38 PM
Comment
All signs require a separate Sign Permit application and review process.
Please apply through our online permiting portal when ready.
Info Only
13 1 Sign Permits
Aliza Shalit
11/26/23 3:42 PM
Comment
This building received ADLS Amend approval for two signs ( one on the
south elevation and one on the East) in 2011. A variance is required for
number of signs (one allowed, three requested) for the south frontage.
Responsed by: Todd Mellish - 1/15/24 7:33 AM
Signage redesigned for the approved (2) signs.
----------------------------------------------------------
Reviewer Response: Aliza Shalit - 12/28/23 10:27 AM
Signage is part of this process and all signage should be
included.
----------------------------------------------------------
Responsed by: Todd Mellish - 12/14/23 7:12 AM
The sign vendor will work with staff to determine final
signage locations and sizing.
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2023-00273 ADLS Amend - Tom Wood Honda Powerhouse
Workflow Started: 11/13/2023 10:16:10 AM
Report Generated: 02/05/2024 12:14 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
14 1 Sign Permits
Aliza Shalit
11/26/23 4:07 PM
Changemark
Changemark note #01
Please provide schematics for all signs including height and width
F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 1/31/24 12:42 PM
Updated elevations have been uploaded.
----------------------------------------------------------
Reviewer Response: Aliza Shalit - 1/30/24 3:15 PM
Please remove the signs that will not be installed from
these elevations. Only proposed signage should be
present.
----------------------------------------------------------
Responsed by: Todd Mellish - 1/15/24 7:35 AM
See attached exterior sign schedule for dimensions for
the (2) proposed signs.
----------------------------------------------------------
Reviewer Response: Aliza Shalit - 12/28/23 10:27 AM
Signage is part of this process and all signage should be
included. This is needed to determine allowable signage
and the need for updates or variances.
----------------------------------------------------------
Responsed by: Todd Mellish - 12/14/23 7:13 AM
The sign vendor will work with the staff to determine
final signage locations and sizing
Resolved
15 1 Sign Permits
Aliza Shalit
11/26/23 4:07 PM
Changemark
Changemark note #02
Please provide spandrel panel height and width of all areas outlined in red
F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 12/14/23 7:21 AM
Dimensions have been listed on colored elevation.
Resolved
16 1 Sign Permits
Aliza Shalit
11/26/23 4:07 PM
Changemark
Changemark note #05
Maximum sign size is 85% of spandrel width and 70 % of spandrel height.
F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 1/15/24 7:36 AM
Please see exterior sign schedule on A-2 for sizing.
----------------------------------------------------------
Reviewer Response: Aliza Shalit - 12/28/23 10:28 AM
Signage is part of this process and all signage should be
included.
----------------------------------------------------------
Responsed by: Todd Mellish - 12/14/23 7:14 AM
The sign vendor will work with staff to determine final
signage locations and sizing.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00273 ADLS Amend - Tom Wood Honda Powerhouse
Workflow Started: 11/13/2023 10:16:10 AM
Report Generated: 02/05/2024 12:14 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
17 1 Sign Permits
Aliza Shalit
11/26/23 4:10 PM
Comment
Is there any other signage planned for this project? Please provide plans for
all incidental directional signage, as well as ground sign.
Responsed by: Todd Mellish - 1/15/24 7:36 AM
Signage is redesigned for the (2) approved signs
----------------------------------------------------------
Reviewer Response: Aliza Shalit - 12/28/23 10:26 AM
Signage is part of this process and all signage should be
included.
----------------------------------------------------------
Responsed by: Todd Mellish - 12/14/23 7:14 AM
The sign vendor will work with staff to determine final
signage locations and sizing.
Resolved
18 1 Sign Permits
Aliza Shalit
11/26/23 4:11 PM
Comment
Please provide color elevations, including the proposed sign colors.
Responsed by: Todd Mellish - 12/13/23 4:33 PM
Color elevations have been uploaded
Resolved
19 1 Sign Permits
Aliza Shalit
11/26/23 4:13 PM
Comment
All signs must have the same lighting method - either face lit or reversed
/halo lit.
Info Only
20 1 Vectren Energy
Chad Miller
11/27/23 8:49 AM
Comment
No comments.
Info Only
21 1 Transportation
Systems
David Littlejohn
11/28/23 9:53 AM
Changemark
ADA ramp grade
Ensure that the ADA ramp complies with ADA ramp standards/requirements.
ADA standards specify that the maximum run slope for ramps is 1:12 (8.33%)
and the grading plan appears to show a slope greater than that.
Site Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:12 PM
The existing ramp does slightly exceed the maximum
allowable slode of 1:12; therefore, we have added a new
ADA compliant handicap ramp near the southwest
corner of the building. This ramp was added per your
suggestion received via email correspondence.
Resolved
22 1 Transportation
Systems
David Littlejohn
11/28/23 9:53 AM
Changemark
ADA parking locationn
Please consider moving the ADA parking spaces to the spaces across from
the access ramp to provide a more direct accessible route from the access
aisle to the ramp leading to the building's entrance. The current plan shows
an indirect accessible route behind parking spaces which could create a
dangerous situation for a person using the access aisle while another person
is backing out of the ADA space(s).
Site Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:13 PM
We have moved the ADA parking spaces to the
opposite side of the drive aisle as requested. The
existing slopes of some of the parking space along the
southside of the building exceed 2.0% in some cases.
The slopes within the ADA parking spaces and
maneuvering areas as currently proposed are ADA
compliant.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00273 ADLS Amend - Tom Wood Honda Powerhouse
Workflow Started: 11/13/2023 10:16:10 AM
Report Generated: 02/05/2024 12:14 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
23 1 Transportation
Systems
David Littlejohn
11/28/23 10:03 AM
Changemark
Bicycle parking minimum number
Section 5.29 of the UDO requires a minimum of 2 bicycle parking spaces for
auto oriented uses. Each inverted-U rack provides 2 bicycle parking spaces
so only one rack is required for this project.
Site Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:18 PM
Removed (1) rack as suggested.
Resolved
24 1 Transportation
Systems
David Littlejohn
11/29/23 9:30 AM
Changemark
Sidewalk connection from path to building
Revise the plans to provide a sidewalk connection from the path along 96th
St to the building. This can be done in this location or by implementing a
sidewalk in the existing curbed areas on the east side of the site. As
proposed cars can park on the accessible route obstructing the access aisle.
Site Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:20 PM
We have revised the construction plans to provide for
an ADA compliant pedestrian access along the western
boundary of the existing parking per our e-mail
correspondence. This will be a concrete sidewalk
adjacent to the existing curb line.
Resolved
25 1 Transportation
Systems
David Littlejohn
11/29/23 9:31 AM
Changemark
Sidewalk connection
Please consider revising the plans to include a direct sidewalk connection
from the path along 96th St to the building using the existing curbed areas
along the east side of the site. This also provides direct access to the
proposed bicycle parking location from the path along 96th St.
Site Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:25 PM
We have revised the construction plans to provide for
an ADA compliant pedestrian access along the western
boundary of the existing parking per our e-mail
correspondence. This will be a concrete sidewalk
adjacent to the existing curb line. We have also
relocated the bicycle parking as suggested.
Resolved
26 2 Planning & Zoning
Christina Jesse
12/22/23 5:16 PM
Changemark
New EIFS proposed
Please revise the marked areas where new EIFS is proposed. Staff can
support the existing EIFS areas to remain but not the addition of more. ACM
panels were verbally approved in these areas currently marked for new EIFS.
F23044_A2 COLORED copy.pdf Responsed by: Todd Mellish - 1/15/24 7:32 AM
EIFS to remain per discussion with staff
Resolved
27 2 Planning & Zoning
Christina Jesse
12/22/23 5:32 PM
Comment
Please upload letter of grant from BZA for additional requested signage.
Responsed by: Todd Mellish - 1/15/24 7:33 AM
Signage redesigned for the approved (2) signs.
Info Only
28 2 Planning & Zoning
Christina Jesse
12/22/23 5:33 PM
Changemark
Missing landscaping
Minutes from the Commercial Committee requested filling this entire island
with plantings. Please revise to meet the commitment outlined in the letter
of grant.
Landscape Plan.pdf Responsed by: Todd Mellish - 1/15/24 7:32 AM
Added planting to fill entire island.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00273 ADLS Amend - Tom Wood Honda Powerhouse
Workflow Started: 11/13/2023 10:16:10 AM
Report Generated: 02/05/2024 12:14 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
29 2 Sign Permits
Aliza Shalit
12/28/23 10:18 AM
Changemark
Wing Sign
Signage should be to scale. Wing sign is still too big to comply with sign
standards per previous comments.
Rendering.pdf Responsed by: Todd Mellish - 1/15/24 7:38 AM
Can we disregard this rendering - it was done by the
Brand and we do not have the file to edit with the
changes made during review. The colored elevations
are accurate and have captured the review comments.
Info Only
30 2 Sign Permits
Aliza Shalit
12/28/23 10:29 AM
Changemark
Dimensions
Please provide spandrel panel dimensions here as well.
F23044_A2 COLORED copy.pdf Responsed by: Todd Mellish - 1/15/24 11:34 AM
Dimension have been added
Resolved
31 2 Sign Permits
Aliza Shalit
12/28/23 10:30 AM
Comment
Please apply for sign variance for extra signage.
Responsed by: Todd Mellish - 1/15/24 7:42 AM
Extra signage has been removed.
Resolved
32 Planning
Coordinator
Christina Jesse
1/16/24 10:08 AM
Comment
Approval conditional upon variances for additional signage.
Info Only