Loading...
HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: PZ-2023-00273 ADLS Amend - Tom Wood Honda Powerhouse Workflow Started: 11/13/2023 10:16:10 AM Report Generated: 02/05/2024 12:14 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 1 Engineering Alex Jordan 11/16/23 2:03 PM Comment Our department will require only a right-of-way permit and $5,000 license and permit bond. This permit can be applied for here: https://cw.carmel.in.gov/PublicAccess/template/Login.aspx Info Only 2 1 Urban Forestry Daren Mindham 11/20/23 1:48 PM Changemark add shrubs Please fill parking lot bump out with shrubs. The original landscape plan is uploaded to the correspondence folder for reference. Please either plant the entire bump out appropriately with alternative shrubs or per the current original landscape plan with 12 alpine current. Landscape Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:08 PM We have added (12) shrubs to the parking bump out as requested. Resolved 3 1 Urban Forestry Daren Mindham 11/20/23 1:48 PM Changemark add shrubs2 Please plant area with shrubs. The original landscape plan is uploaded to the correspondence folder for reference. Please either plant the entire area appropriately with alternative shrubs or per the current original landscape plan with 20 alpine current. Landscape Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:09 PM We have added (20) shrubs along western boundary of the parking lot as requested. Resolved 4 1 Urban Forestry Daren Mindham 11/20/23 1:48 PM Changemark add shrubs3 I would recommend planting this island with matching shrubs. Parking on this parking lot island is not permitted. Landscape Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:10 PM We have added (11) shrubs to this parking island as requested. We have also added landscaping between the existing parking lot and multi-use path along 96th street as recommended by the Commercial Committee. Resolved 5 1 Planning & Zoning Christina Jesse 11/22/23 10:45 AM Changemark Storage enclosure Please provide additional context on the use of the storage enclosure. What will be stored here? Site Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:08 PM This storage enclosure will store the motorcycle pallets that will remain onsite between shipments. A photograph of these pallets has been uploaded to the correspondence folder. Resolved 6 1 Planning & Zoning Christina Jesse 11/22/23 10:45 AM Changemark Front row parking The row of 12 parking spaces on the south of the site abuts an extremely wide drive aisle (49' in width). Please consider moving the parking toward the north and installing a landscaping buffer adjacent to the southern property line to reduce the width of this drive aisle to appear consistent with the rest of the site design. Thank you. Site Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:29 PM Being a powersports dealership the owner will utilize this space for additional site maneuverability and area for test rides. Resolved REVIEW COMMENTS Plan Review - Review Comments Report Project Name: PZ-2023-00273 ADLS Amend - Tom Wood Honda Powerhouse Workflow Started: 11/13/2023 10:16:10 AM Report Generated: 02/05/2024 12:14 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 7 1 Planning & Zoning Christina Jesse 11/22/23 12:00 PM Changemark Chain link Will chain link gates or fencing be used anywhere else on site? F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 1/15/24 7:30 AM The gate design has been revised per staff direction. ---------------------------------------------------------- Reviewer Response: Christina Jesse - 12/22/23 5:06 PM Thank you for updating the storage enclosure with a masonry material. Please revise the chain link gate as this is not compatible with the principal building design. ---------------------------------------------------------- Responsed by: Todd Mellish - 12/13/23 4:30 PM The storage enclosure has been changed to utilize masonry construction to complement the existing building. Resolved 8 1 Planning & Zoning Christina Jesse 11/22/23 12:00 PM Changemark Color elevations Please upload color elevations. Thank you. F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 12/13/23 4:32 PM Color elevation has been uploaded. Resolved 9 1 Planning & Zoning Christina Jesse 11/22/23 12:00 PM Changemark existing storefront windows Please verify the existing store front windows are properly labeled. Thank you. F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 1/15/24 7:30 AM Labels should be accurate for existing/new. ---------------------------------------------------------- Reviewer Response: Christina Jesse - 12/22/23 5:09 PM It appears the newest elevations still label some of the existing storefront windows as existing curtain wall. Please revise. ---------------------------------------------------------- Responsed by: Todd Mellish - 12/13/23 4:32 PM These storefront window labels have been corrected. Resolved 10 1 Planning & Zoning Christina Jesse 11/22/23 12:00 PM Changemark Existing EIFS Please provide an exhibit illustrating the existing EIFS and proposed EIFS on the elevations. Thank you. F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 12/13/23 4:32 PM These have been labeled on the elevations Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00273 ADLS Amend - Tom Wood Honda Powerhouse Workflow Started: 11/13/2023 10:16:10 AM Report Generated: 02/05/2024 12:14 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 11 1 Planning & Zoning Christina Jesse 11/22/23 12:21 PM Changemark Lighting fixtures Please confirm if all light fixtures proposed with this project are existing. If additional or replacement light fixtures will be used, please upload design details and a photometric plan. Thank you. F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 1/15/24 7:31 AM Existing lights to remain as is with no new exterior fixtures. ---------------------------------------------------------- Reviewer Response: Christina Jesse - 12/22/23 5:14 PM Please confirm if additional fixtures will be installed on this project. ---------------------------------------------------------- Responsed by: Todd Mellish - 12/13/23 4:33 PM The existing exterior lighting will remain. Resolved 12 1 Sign Permits Aliza Shalit 11/26/23 3:38 PM Comment All signs require a separate Sign Permit application and review process. Please apply through our online permiting portal when ready. Info Only 13 1 Sign Permits Aliza Shalit 11/26/23 3:42 PM Comment This building received ADLS Amend approval for two signs ( one on the south elevation and one on the East) in 2011. A variance is required for number of signs (one allowed, three requested) for the south frontage. Responsed by: Todd Mellish - 1/15/24 7:33 AM Signage redesigned for the approved (2) signs. ---------------------------------------------------------- Reviewer Response: Aliza Shalit - 12/28/23 10:27 AM Signage is part of this process and all signage should be included. ---------------------------------------------------------- Responsed by: Todd Mellish - 12/14/23 7:12 AM The sign vendor will work with staff to determine final signage locations and sizing. Info Only Plan Review - Review Comments Report Project Name: PZ-2023-00273 ADLS Amend - Tom Wood Honda Powerhouse Workflow Started: 11/13/2023 10:16:10 AM Report Generated: 02/05/2024 12:14 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 14 1 Sign Permits Aliza Shalit 11/26/23 4:07 PM Changemark Changemark note #01 Please provide schematics for all signs including height and width F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 1/31/24 12:42 PM Updated elevations have been uploaded. ---------------------------------------------------------- Reviewer Response: Aliza Shalit - 1/30/24 3:15 PM Please remove the signs that will not be installed from these elevations. Only proposed signage should be present. ---------------------------------------------------------- Responsed by: Todd Mellish - 1/15/24 7:35 AM See attached exterior sign schedule for dimensions for the (2) proposed signs. ---------------------------------------------------------- Reviewer Response: Aliza Shalit - 12/28/23 10:27 AM Signage is part of this process and all signage should be included. This is needed to determine allowable signage and the need for updates or variances. ---------------------------------------------------------- Responsed by: Todd Mellish - 12/14/23 7:13 AM The sign vendor will work with the staff to determine final signage locations and sizing Resolved 15 1 Sign Permits Aliza Shalit 11/26/23 4:07 PM Changemark Changemark note #02 Please provide spandrel panel height and width of all areas outlined in red F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 12/14/23 7:21 AM Dimensions have been listed on colored elevation. Resolved 16 1 Sign Permits Aliza Shalit 11/26/23 4:07 PM Changemark Changemark note #05 Maximum sign size is 85% of spandrel width and 70 % of spandrel height. F23044_A2 11-13-23.pdf Responsed by: Todd Mellish - 1/15/24 7:36 AM Please see exterior sign schedule on A-2 for sizing. ---------------------------------------------------------- Reviewer Response: Aliza Shalit - 12/28/23 10:28 AM Signage is part of this process and all signage should be included. ---------------------------------------------------------- Responsed by: Todd Mellish - 12/14/23 7:14 AM The sign vendor will work with staff to determine final signage locations and sizing. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00273 ADLS Amend - Tom Wood Honda Powerhouse Workflow Started: 11/13/2023 10:16:10 AM Report Generated: 02/05/2024 12:14 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 17 1 Sign Permits Aliza Shalit 11/26/23 4:10 PM Comment Is there any other signage planned for this project? Please provide plans for all incidental directional signage, as well as ground sign. Responsed by: Todd Mellish - 1/15/24 7:36 AM Signage is redesigned for the (2) approved signs ---------------------------------------------------------- Reviewer Response: Aliza Shalit - 12/28/23 10:26 AM Signage is part of this process and all signage should be included. ---------------------------------------------------------- Responsed by: Todd Mellish - 12/14/23 7:14 AM The sign vendor will work with staff to determine final signage locations and sizing. Resolved 18 1 Sign Permits Aliza Shalit 11/26/23 4:11 PM Comment Please provide color elevations, including the proposed sign colors. Responsed by: Todd Mellish - 12/13/23 4:33 PM Color elevations have been uploaded Resolved 19 1 Sign Permits Aliza Shalit 11/26/23 4:13 PM Comment All signs must have the same lighting method - either face lit or reversed /halo lit. Info Only 20 1 Vectren Energy Chad Miller 11/27/23 8:49 AM Comment No comments. Info Only 21 1 Transportation Systems David Littlejohn 11/28/23 9:53 AM Changemark ADA ramp grade Ensure that the ADA ramp complies with ADA ramp standards/requirements. ADA standards specify that the maximum run slope for ramps is 1:12 (8.33%) and the grading plan appears to show a slope greater than that. Site Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:12 PM The existing ramp does slightly exceed the maximum allowable slode of 1:12; therefore, we have added a new ADA compliant handicap ramp near the southwest corner of the building. This ramp was added per your suggestion received via email correspondence. Resolved 22 1 Transportation Systems David Littlejohn 11/28/23 9:53 AM Changemark ADA parking locationn Please consider moving the ADA parking spaces to the spaces across from the access ramp to provide a more direct accessible route from the access aisle to the ramp leading to the building's entrance. The current plan shows an indirect accessible route behind parking spaces which could create a dangerous situation for a person using the access aisle while another person is backing out of the ADA space(s). Site Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:13 PM We have moved the ADA parking spaces to the opposite side of the drive aisle as requested. The existing slopes of some of the parking space along the southside of the building exceed 2.0% in some cases. The slopes within the ADA parking spaces and maneuvering areas as currently proposed are ADA compliant. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00273 ADLS Amend - Tom Wood Honda Powerhouse Workflow Started: 11/13/2023 10:16:10 AM Report Generated: 02/05/2024 12:14 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 23 1 Transportation Systems David Littlejohn 11/28/23 10:03 AM Changemark Bicycle parking minimum number Section 5.29 of the UDO requires a minimum of 2 bicycle parking spaces for auto oriented uses. Each inverted-U rack provides 2 bicycle parking spaces so only one rack is required for this project. Site Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:18 PM Removed (1) rack as suggested. Resolved 24 1 Transportation Systems David Littlejohn 11/29/23 9:30 AM Changemark Sidewalk connection from path to building Revise the plans to provide a sidewalk connection from the path along 96th St to the building. This can be done in this location or by implementing a sidewalk in the existing curbed areas on the east side of the site. As proposed cars can park on the accessible route obstructing the access aisle. Site Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:20 PM We have revised the construction plans to provide for an ADA compliant pedestrian access along the western boundary of the existing parking per our e-mail correspondence. This will be a concrete sidewalk adjacent to the existing curb line. Resolved 25 1 Transportation Systems David Littlejohn 11/29/23 9:31 AM Changemark Sidewalk connection Please consider revising the plans to include a direct sidewalk connection from the path along 96th St to the building using the existing curbed areas along the east side of the site. This also provides direct access to the proposed bicycle parking location from the path along 96th St. Site Plan.pdf Responsed by: Todd Mellish - 12/13/23 4:25 PM We have revised the construction plans to provide for an ADA compliant pedestrian access along the western boundary of the existing parking per our e-mail correspondence. This will be a concrete sidewalk adjacent to the existing curb line. We have also relocated the bicycle parking as suggested. Resolved 26 2 Planning & Zoning Christina Jesse 12/22/23 5:16 PM Changemark New EIFS proposed Please revise the marked areas where new EIFS is proposed. Staff can support the existing EIFS areas to remain but not the addition of more. ACM panels were verbally approved in these areas currently marked for new EIFS. F23044_A2 COLORED copy.pdf Responsed by: Todd Mellish - 1/15/24 7:32 AM EIFS to remain per discussion with staff Resolved 27 2 Planning & Zoning Christina Jesse 12/22/23 5:32 PM Comment Please upload letter of grant from BZA for additional requested signage. Responsed by: Todd Mellish - 1/15/24 7:33 AM Signage redesigned for the approved (2) signs. Info Only 28 2 Planning & Zoning Christina Jesse 12/22/23 5:33 PM Changemark Missing landscaping Minutes from the Commercial Committee requested filling this entire island with plantings. Please revise to meet the commitment outlined in the letter of grant. Landscape Plan.pdf Responsed by: Todd Mellish - 1/15/24 7:32 AM Added planting to fill entire island. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00273 ADLS Amend - Tom Wood Honda Powerhouse Workflow Started: 11/13/2023 10:16:10 AM Report Generated: 02/05/2024 12:14 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 29 2 Sign Permits Aliza Shalit 12/28/23 10:18 AM Changemark Wing Sign Signage should be to scale. Wing sign is still too big to comply with sign standards per previous comments. Rendering.pdf Responsed by: Todd Mellish - 1/15/24 7:38 AM Can we disregard this rendering - it was done by the Brand and we do not have the file to edit with the changes made during review. The colored elevations are accurate and have captured the review comments. Info Only 30 2 Sign Permits Aliza Shalit 12/28/23 10:29 AM Changemark Dimensions Please provide spandrel panel dimensions here as well. F23044_A2 COLORED copy.pdf Responsed by: Todd Mellish - 1/15/24 11:34 AM Dimension have been added Resolved 31 2 Sign Permits Aliza Shalit 12/28/23 10:30 AM Comment Please apply for sign variance for extra signage. Responsed by: Todd Mellish - 1/15/24 7:42 AM Extra signage has been removed. Resolved 32 Planning Coordinator Christina Jesse 1/16/24 10:08 AM Comment Approval conditional upon variances for additional signage. Info Only