HomeMy WebLinkAbout06120097 State Release
Would you like to reduce your turnaround time?
ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA AT
efHe24-7@dhs..in.gov, Or VISIT OUR WEB SITE AT www.in.gov/dhs/brancheslplanreview/index.html
1-------;:--- CONSTRUCTION DESIGN RELEASE
I State Form 41191 (R9/5-9B)
I Report Printed on: December 21,2006
I
,
Indiana Department of Homeland Security
DIVISION OF FIRE SAFETY I PLAN REVIEW
402 W. Washington St., Room E245
Indianapolis, IN 46204
INDIANA 02
~OOOO
Project number ---!~ease date
322948 112/21/06
I ;".,ru,,,". - l Occupancy classification
II-B, SPK M, REM
I
Scope of release
ARCH ELEC MECH
PLUM
I Type of release
Standard
Project name
Soccer Village
Street address 1
1374 S Rangeline Rd I
City l County
CARMEL HAMILTON
To: Owner I Architect I Engineer
Craig W. Rapp Associates LLC
Craig W Rapp 3336
118W.St.ClairStreet ~
Indianapolis IN 46204
~~e-mail: 317423~996.cwrappassociates@aol.com ~__
The plans, specifications and application submitted for the above referenced project have been reviewed for compliance with the applicable rules of
the Fire Prevention and Building Safety Commission. The project is released for construction subject to, but not necessarily limited to, the conditions
listed below. THIS IS NOT A BUILDING PERMIT. Allrequiredlocat permits and licenses must be obtained prior tobeginning'construction WorK. All
construction work must be in full compliance with all applicable State rules. Any changes in the released plans and/or specifications must be filed with
and released by this Office before any work is altered.,Thisrelease may be suspended or revoked if it is determined to be issued in error, in violation
of any rules of the Commission or if it is based on i'ncorrect or insufficient information: This release shall expire by limitation, and become null and
void, if the work authorized is not commenced within one (1) year from the above date.
CONDITIONS:
SUPPORT HOOSIER SAFETY
Note :(A1A & A1B): In accordance with the affidavit sworn under penalties of perjury in the application for construction design release the plans
and specifications filed in conjunction with this project shall comply with all of the applicable rules and laws of Fire Prevention and Building Safety
Commission. Providing false information constitutes an act of perjury, which is a Class D felony punishable by a prison term and a fine up to $10,000.
In accordance with Section 19 of the General Administrative Rules (675 lAC 12-6-19) a complete set of plans and specifications that conform
exactly to the design that was released by the office of the state building commissioner shall be maintained on the construction jobsite as well as a
copy of the design release.
9P0901A
Plans and specifications for the revised fire suppression system shall be filed with the required
application, fees, and complete details in accordance with 675 lAC 12-6- 3(a), 7(h)17 and 675 lAC
13-1-8. (N.F.P.A. #13)
All plumbing fixtures shall be properly vented in accordance with Chapter 9, IPC (675 lAC 16-1.3).
4G0603AF
9P0703A
Sanitary drainage pipes shall be sized in accordance with Section 703.0, IPC (675 lAC 16-1.3).
Please be advised that if an administrative review of this action is desired, a written petition for review must be filed at the above address with the
Fire Prevention and Building Safety Commission identifying the matter for which a review is sought no later than eighteen (18) days from the above-
stated date, unless the eighteenth day falls on a Saturday, a Sunday, a legal holiday under State statute. or a day in which the Department of Fire
and Building Services is closed during normal business hours. In the latter case, the filing deadline will be the first working day thereafter. If you
choose to petition, and the before-mentioned procedures are followed, your petition for review will be granted. and an administrative proceeding will
be conducted by an administrative law judge of the Fire Prevention and Building Safety Commission. If a petition for review is nol filed, this Order will
be final. and you must comply with its requirements.
I Filed By I Code review official
_______ J TONY BRADSHAW
Address (name,title of local official,street,city,state and ZIP code
DEPT OF COMMUNITY SERVICE
JIM BLANCHARD
ONE CIVIC SQUARE
CARMEL, IN 46032
-COde Enforcement & Plan Review Branch Director
State Fire Marshal
O~7//S~
V??'o~
Fax & e-mail: 3175712499,jbla!.1chard@carmel.in,gov
Page 1/1
Would you like to reduce your turnaround time?
ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA AT
efile24-7@dhs..in.gov, Or VISIT OUR WEB SITE AT www.ln.gov/dhslbranches/planreview/index.html
Project number Release date
322948
Construction type
II-B, SPK
Scope of release
M, REM
CONSTRUCTION DESIGN RELEASE
State Form 41191 (R9/5-98)
Report Printed on: December 21,2006
12/21/06
Indiana Department of Homeland Security
DIVISION OF FIRE SAFETY I PLAN REVIEW
402 W. Washington St., Room E245
Indianapolis, IN 46204
INDIANA 02
~oo~.Q,QyOO
ARCH ELEC
PLUM
MECH
To: Owner I Architect I Engineer
Craig W. Rapp Associates LLC
Craig W Rapp 3336
118 W. St. Clair Street
Indianapolis IN 46204
SUPPORT HOOSIER SAFETY
Type of release
Standard
Project name
Soccer Village
Available AI Your Local Licence Branch
Street address
1374 S Rangeline Rd
City
CARMEL
I County
I HAMILTON
IFax & e-mail: 3174234996, cwrappassociates@aol.com
The plans, specifications and application submitted for the above referenced project have been reviewed for compliance with the applicable rules of
the Fire Prevention and Building Safety Commission. The project is released for construction subject to, but not necessarily limited to, the conditions
Iisted'below."THIS IS"NOT A BUILDING'PERMIT..'AI1""required-local'permits and'licenses"must"be"obtained"prior to"beginning-construction work. All
construction work must be in full compliance with all applicable State rules. Any changes in the released plans and/or specifications"must be filed with
and released by this Office before any wo~ is'a:lterE3,d.~!his;relt3:ase T~Y bEl~usPE:lnded;or revoked if it is determiped,to bElis?,ued in error, in violation
of any rules of the Commission or if it is based'on incorrect or insufficient infciimation:'~,This release shall expire by',:Umltatlon, a'nd become null and
void, if the work authorized is not commenced"wfthih oHe (1fye~r from:ihe above~date:;j~; ..t -,t oc.!
CONDITIONS: r ^ -~ .... .. '.~.. ,. X; ......-..
,,:>}t."
Note :(A 1A & A 1 B): In accordance:"wit~'the affidavit sworn under penalties of perjury in the application for construction design release the plans
and specifications'filed in conjuncti6n~\vith this project shall comply with all of the applicable rules and laws of Fire Prevention and Building Safety
Commission. Providing false information constitutes a~ act of perjury, which is a Class D felony"punishable by a'prison term and a fine up to $10,000.
In accordance with Section 19 ofthe G~neral Administrative Rules (675 lAC'12.6-19) a complete'set of plans and specifications that confOml
exactly to the designJha(was released by the office of the state building commissioner shall be maintained on the construction jobsite as well as a
copy of the design,release.
9P0901A
Plans, and specifications for the revised fire suppression system shall be filed with the required
application, fees, and complete details in accordance with 675 lAC 12-6- 3(a), 7(h)17 and 675 lAC
13-1-8. (N.F.P.A. #13)
,All plumbing fixtures shall be 'properly vented in accordance with Chapter 9, IPC (675 lAC 16-1.3).
4G0603AF
9P0703A
Please be advised that if an administrative review of this action is desired, a written petition for review must be filed at the above address with the
FirePrevention and Building Safety Commission, identifyingJhematterJor which,a review is_sought no later, than eighteen (.18) days from the above -
stated date, unless the eighteenth day falls on a Saturday, a Sunday, a legal holiday under State statute, or a day in which the Department of Fire
and Building Services is closed during normal business hours. In the latter case, the filing deadline will be the first working day thereafter. If you
choose to petition, and the before+mentioned procedures are followed, your petition for review will be granted, and an administrative proceeding will
be conducted by an administrative law judge of the Fire Prevention and Building Safety Commission. If a petition for review is not filed, this Order will
be final, and you must comply with its requirements.
Sanitary drainage pipes shall be sized in accordance with Section 703.0, IPC (675 lAC 16-1.3).
Code Enforcement & Plan Review Branch Director
Ii Filed By ! Code review official
I TONY BRADSHAW
I Address (name,tille of local official,street,city,state and ZIP code
DEPT OF COMMUNITY SERVICE
JIM BLANCHARD
ONE CIVIC SQUARE
CARMEL, IN 46032
State Fire Marshal
-r:J~d/S~
Vl~O~
Fax & e-mail: 3175712499, jblanchardtQtcarmeLin.Qov
Page 1/1