ON-SITE EVALUATION FOR EROSION AND SEDIMENT CONTROL
Hamilton County Soil and Water Conservation District
1108 South 9th Street, Noblesville, IN 46060
Emailatiohn-south@iaswcd.org Ph: 317-773-2181 Fax: 317-776-1101
Date: January 21,2004
Project Name: Shelboume Estates
Present at Site: John South, Hamilton Co. SWCD
This Report Provided To:
Mr. Chris Worth
Thompson Development
11911 Lakeside Blvd.
Fishers, IN 46038
< <t~/DJ. V)Q)15~
\
Surveyor
Carmel DOCS
File
TYPE OF EVALUATION: 0 Initial X Routine 0 Follow-up 0 Complaint
This evaluation is intended to assess the level of compliance with 327 lAC I5-5 (Rule 5). It is also intended to identify areas where :
additional measures may be required to control erosion and sedimentation. All practices recommended in this report should be
evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer.
All erosion and sediment control measures shall meet the design criteria, standards, and specifications outlined in the "Indiana
Handbook for Erosion Control in Developing Areas" or similar guidance documents.
Current Site Information: Site development has been completed. Five or six homes are being built. A stone
construction entrance is the only practice being used on the home sites.
The Following Items Have Been Evaluated and Assigned a Designation of:
S = Satisfactory M = Marginal U = Unsatisfactory NA = Not Applicable
Construction Site Management for Erosion and Sediment Control
M (1) Disturbed areas have b'een adequately protected through seeding or other appropriate. erosion and
sediment control measures.
S (2) Appropriate perimeter sediment control measures have been implemented.
S (3) Conveyance channels have been stabilized or protected with appropriate sediment control measures.
S (4) Erosion & sediment control measures are installed properly.
S (5) Storm drain inlets have been adequately protected.
S (6) Outlets have been adequately stabilized.
S (7) Existing erosion & sediment control measures are being maintained.
S (8) Public & private roadways are being kept clear of accumulated sediment or tracked soil.
U (9) Erosion & sediment control measures have been installed and maintained on individual building sites.
Status of Sediment Retention On-Site
Site conditions present a high potential for off-site sedimentation.
There is evidence of off-site sedimentation.
Describe:
Satisfactory:
Marginal:
Unsatisfactory:
Not Applicable:
X Please Refer to the Comments Section of this Report
Definitions
The item is currently in compliance with the Rule
A concern has been identified; corrective action is strongly recommended to remain in compliance
A violation has been identified and the site is not in compliance; corrective action is required
Does not apply at this stage of construction
Revised 4 /98
F
...
ON-SITE EV ALVA nON FOR EROSION AND SEDIMENT CONTROL
PR
COMMENTS
OJECT NAME:
ge2
e items checked below must be corrected prior to _2/6/04 , unless otherwise noted.
Install an appropriate sediment control practice between construction areas and lower lying areas.
Replace/Repair silt fence and/or straw bale barriers.
Entrench silt fence (6-8 in.) and/or straw bale barriers (4 -6 in.) and stake straw bales.
Remove accumulated sediment from:
o sediment traps/basins,
o behind silt fence/straw bales,
o around storm drain inlet protection devices,
o streets and gutters (Do not flush with water)
Temporary seed, fertilize, and/or mulch: .
Permanent seed, fertilize, and mulch areas that are at final grade
Protect storm drain inlets:
o curb inlets,
o drop inlets
Reshape and stabilize sideslopes of :
o sediment traps/basins,
o detention/retention basins
Install/Maintain construction entrance(s):
Reshape and stabilize conveyance channels: I
i
Place greater emphasis on erosion and sediment control on building sites; contractors, i
I
subcontractors, material vendors, and others should be made aware of erosion and sediment control
X requirements. Appropriate perimeter sediment controls (e.g. silt fence) and stable construction
entrances shall be utilized on all sites. Sediment tracked into the street shall be removed (do not
flush with water) at the end of each work day.
Other Requirements: I
I
Pa
Th
This report submitted by: John B. South P.E. CPESC
Revised 4/98
u
u
CITY OF CARMEL
Department of Community Seroices
One Civic Square
Carmel, IN 4aJ32
(317) 571-2417
Fax: (317) 571-2426
Fax
To: ~ ~~
G?~ --9/cr~,
~~
_.~.
o Urgent 0 For Review 0 Please Comment
F~m: ~
Pages: ~
Date: /-- 02 -c:x..3
Fax:
cc:
o Please Reply
CJ Please Recycle
4~~, /,17- o~ -1'2X.5Am~/Jd
~~~-x~
u
Q
CITY OF CARMEL
Department of Community Services
One Civic Square
Carmel, IN 4&l32
(:317) 571-2417
Fax: (317) 571-2426
Fax
To: C?fJ7J- ~r-,L~
Fax: 676-q't1~
From:
~~
\3
Pages:
Phone:
Date:
/d -02 7-0~
Re: 5pec/~1 c51vcd~..r ~/C'~ CC:
,
o Urgent 0 For Review 0 Please Comment 0 Please Reply
o Please Recycle
4-cli'er' ~.
5~e/jt/t/r/Je
/39-&0( A-.2JL3 4-4J~/l~
,k5h~/ev'
Fax
u
CITY OF CARMEL
Department of Community Services
One Civic Square
Carmel, IN 4S)32
(317) 571-2417
Fax: (:317) 571-2426
To: ~ ~~~...0
Fax: 670 - 9~j'~
F~"" pJ
Pages: C1
Phone:
Date:
/c2-2~ -P-1
Re: /F7 - O~ /lli..s A/1Je /leI CC:
u
o Urgent 0 Far Review 0 Please Comment 0 Please Reply
o Please Recycle