Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C401 EROSION CONTROL PLAN
I I I I I I I I I I I I CONSTRUCTION LI M ITS I III I 4 I I I I I I 6880 Q 829.07 BUSH SILT FENCE I CONS LI M ITS N 00 I J ❑ I I m Z 0 Z ❑ i SILT FENCE I I I I ���• Co I ,__,3 0 CP I I -oI Drainage H� I Rim 832 3' vert(E)=8 0.77 R SOC I� I i I I N r'J ,XI I� vryti� / I I I I DO I I I / / SESC REQUIREMENTS: 1. ALL EROSION CONTROL PRACTICES SHALL BE IN ACCORDANCE WITH THE "INDIANA STORM WATER QUALITY MANUAL" AND THE SCS "FIELD OFFICE TECHNICAL GUIDE". 2. THE EROSION CONTROL MEASURES INCLUDED IN THIS PLAN SHALL BE INSTALLED PRIOR TO INITIAL LAND DISTURBANCE ACTIVITIES OR AS SOON AS PRACTICAL. SEDIMENT SHALL BE PREVENTED FROM DISCHARGING FROM THE PROJECT SITE BY INSTALLING AND MAINTAINING SILT FENCE, STRAW BALES, SEDIMENT BASINS, ETC. AS SHOWN ON THIS PLAN. 3. ALL ON SITE STORM DRAIN INLETS SHALL BE PROTECTED AGAINST SEDIMENTATION WITH STRAW BALES. FILTER FABRIC, OR EQUIVALENT BARRIERS AS SHOWN ON THIS PLAN. 4. EXCEPT AS PREVENTED BY INCLEMENT WEATHER CONDITIONS OR OTHER CIRCUMSTANCES BEYOND THE CONTROL OF THE CONTRACTOR/DEVELOPER APPROPRIATE EROSION CONTROL PRACTICES WILL BE INITIATED WITHIN (7) SEVEN DAYS OF THE LAST LANE DISTURBING ACTIVITY AT THE SITE. THE SITE SHALL BE STABILIZED BY SEEDING, SODDING, MULCHING, COVERING, OR BY OTHER EQUIVALENT EROSION CONTROL MEASURES. 5. THIS EROSION CONTROL PLAN SHALL BE IMPLEMENTED ON ALL DISTURBED AREAS WITHIN THE CONSTRUCTION SITE. ALL MEASURES INVOLVING EROSION CONTROL PRACTICES SHALL BE INSTALLED UNDER THE GUIDANCE OF A QUALIFIED PERSONNEL EXPERIENCED IN EROSION CONTROL AND FOLLOWING THE PLANS AND SPECIFICATIONS INCLUDED HEREIN. 6. DURING THE PERIOD OF CONSTRUCTION ACTIVITY, ALL SEDIMENT BASINS AND OTHER EROSION CONTROL MEASURES SHALL BE MAINTAINED BY THE CONTRACTOR AT THE COMPLETION OF CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE THE TRANSFER OF REQUIRED MAINTENANCE RESPONSIBILITIES WITH THE OWNER. 7. PUBLIC OR PRIVATE ROADWAYS SHALL BE KEPT CLEARED OF ACCUMULATED SEDIMENT BULK CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING THE AREA WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE POINT OF LIKELY ORIGIN OR OTHER SUITABLE LOCATION. 8. THE CONTRACTOR SHALL CONTROL WASTES, GARBAGE, DEBRIS, WASTEWATER, AND OTHER SUBSTANCES ON THE SITE IN SUCH A WAY THAT THEY SHALL NOT BE TRANSPORTED FROM THE SITE BY THE ACTION OF WINDS. STORM WATER RUNOFF. OR OTHER FORCES PROPER DISPOSAL OR MANAGEMENT OF ALL WASTES AND UNUSED BUILDING MATERIALS APPROPRIATE TO THE NATURE OF THE WASTE OR MATERIAL IS REQUIRED. 9. ALL EROSION CONTROL MEASURES INDICATED SHALL BE MAINTAINED BY THE CONTRACTOR ON BEHALF OF THE OWNER. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED AS DIRECTED BY THE CONTRACTOR'S SITE INSPECTOR OR BY THE CITY OF CARMEL. CARM F I PEDCOR DESIGN GROUP LLC Architecture / Project Management: 355 City Center Drive Carmel, Indiana 46032 317.705.7979 (phone) 317.705.7980 (fax) Engineer \STERF 910023 ;• STATE OF •ram s• 7NDI s •• By: LEI RESPONSIBLE PERSON: . .Developer: FOR IMPLEMENTING EROSION CONTROL PRACTICES: P E D C O R MATT BOYLE PEDCOR CONSTRUCTION MANAGEMENT'S 385 CITY CENTER DRIVE, SUITE 100 I CARMEL, IN 46032 PH:317-208-3761 DEVELOPMENT CO. IProject: EROSION CONTROL LEGEND INLET SILT PROTECTION (SEE DETAIL ON SHEET C-402) CONCRETE WASHOUT (SEE DETAIL ON SHEET C-402) SEEDING W/ MULCH APPLIED (SEE DETAIL ON SHEET C-402) S O ■ ITEMPORARY CONSTRUCTION ENTRANCE (SEE DETAIL ON SHEET C-402) IINDICATES CONSTRUCTION LIMITS CL N J FILTER SOCK (SEE DETAIL ON SHEET C-402) � m m m m � 1IO SILT FENCE (SEE DETAIL ON SHEET C-402) z vvvvvv EROSION CONTROL BLANKET (SEE DETAIL ON SHEET C-402) ° ° ° ° ° ° O vvvvvv INSTALLATION SEQUENCE: z O E 1. INSTALL TEMPORARY CONSTRUCTION ENTRANCES, SILT FENCE 2. INSTALL INLET PROTECTION U 3. STRIP TOPSOIL AND STORE IN APPROVED AREA O 4. ROUGH GRADE SITE AND CONSTRUCT BUILDING PAD LO 5. SEED DISTURB AREAS W V 6. INSTALL STORM STORM ROOF DRAINS 7. FINAL GRADING 8• RE -SEED DISTURB AREAS 9• REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER EXPOSED SOIL IS STABILIZED BY SEEDING ALL DISTURBED AREAS THAT ARE LEFT UNSTABILIZED FOR 7 DAYS SHALL RECEIVE SEED AND MULCH. NOTE: ALL CASTINGS SHALL BE LABELED "DUMP NO WASTE — DRAINS TO WATERWAY" COPYRIGHT & OWNERSHIP OF DOCUMENTS THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINALAND PUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. © COPYRIGHT 2022 JAMES R. STUTZMAN, AIA, Carmel, Indiana. CONSTRUCTION DOCUMENTS Set Issue Date Sheet Issue Date 01 /30/2023 05/04/2023 Drawn By Checked By DBH RDM Last Revision Date: 03/30/23 - CARMEL REVIEW 05/04/23 - CARMEL REVIEW Project Number: 21071.001 Sheet Title: EROSION CONTROL PLAN Sheet Number: N GRADING & DRAINAGE PLAN SCALE: 1" = 20' 1 �JIflulanalull • • below. T, Call before you• • C401