Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Landscape Plan_stamped approved
POOL TO BE DESIGNED BY OTHERS PK 6 CK 1 SA 4 3 SA BR 3 PK 6 BR 8 5 HG HS 17 16 SA 1 BR 5 BR MP 1 PL 8 PL 8 HS 3 MP 1 SA 9 1 CK HG 4 PK 11 PK 10 13 PK 15 PH 3 PL 10 PH 4 HS 11 PL HG 3 SA 3 BR 1 6 BR 5 SA BUILDING C THE MAPLES RESTAURANT RAMP TO THE MAPLES, SEE CIVIL PLANS TREES QTY BOTANICAL NAME COMMON NAME CONT CAL HT CK 2 CLADRASTIS KENTUKEA AMERICAN YELLOWWOOD B & B 2.5" CAL MIN --- MP 2 MALUS X 'PRAIRIFIRE'PRAIRIFIRE CRABAPPLE B & B 1.5" CAL MIN --- SHRUBS QTY BOTANICAL NAME COMMON NAME CONT SPACING SIZE BR 24 BUXUS MICROPHYLLA 'WINTER GEM'WINTER GEM BOXWOOD ---36" OC 18" HT MIN HG 12 HOSTA X 'GOLD STANDARD'GOLD STANDARD HOSTA ---36" OC 18" HT MIN HS 24 HYDRANGEA QUERCIFOLIA 'SNOWFLAKE' TM SNOWFLAKE OAKLEAF HYDRANGEA ---60" O.C.24" HT MIN PL 30 PHYSOCARPUS OPULIFOLIUS 'LITTLE DEVIL'LITTLE DEVILâ„¢ DWARF NINEBARK ---36" OC 18" HT MIN NATIVE SPECIES GRASSES QTY BOTANICAL NAME COMMON NAME CONT SPACING SIZE PH 25 PANICUM VIRGATUM 'HEAVY METAL'HEAVY METAL SWITCH GRASS ---24" OC 24" HT MIN NATIVE SPECIES PK 46 PENNISETUM ORIENTALE 'KARLEY ROSE'KARLEY ROSE FOUNTAIN GRASS 1 GAL 36" OC --- SA 40 SESLERIA AUTUMNALIS AUTUMN MOOR GRASS 1 GAL 36" OC --- NATIVE SPECIES PLANT SCHEDULE NORTH L2.0LANDSCAPEPLANPOOL AMENITYAT NORTH END©PERMANENT SEEDING AMERITURF FRONTRUNNER BLEND TALL FESCUE; APPLY AT A RATE OF 350 LBS/ACRE (8LBS/1000 SQFT) SEEDING LEGEND STONE MULCH ALABAMA SUNSET LANDSCAPE GRAVEL; APPLY AT A 3" DEPTH, WEED FABRIC IS REQUIRED UNDER MULCH NOBLESVILLE TIFFANY LAWN & GARDEN SUPPLY 317-774-7100 MULCHING LEGEND 1/18/2024 Daren Mindham L2.1LANDSCAPEDETAILSPOOL AMENITYAT NORTH END©LANDSCAPE NOTES 1.THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING MATERIALS AND PLANTS SHOWN ON THE LANDSCAPE PLAN. THE CONTRACTOR IS RESPONSIBLE FOR THE COST TO REPAIR UTILITIES, ADJACENT LANDSCAPE, PUBLIC AND PRIVATE PROPERTY THAT IS DAMAGED BY THE CONTRACTOR OR THEIR SUBCONTRACTOR'S OPERATIONS DURING INSTALLATION OR DURING THE SPECIFIED MAINTENANCE PERIOD. CALL FOR UTILITY LOCATIONS PRIOR TO ANY EXCAVATION AND PLANTING. 2.THE CONTRACTOR SHALL REPORT ANY DISCREPANCY IN PLAN VS. FIELD CONDITIONS IMMEDIATELY TO THE LANDSCAPE ARCHITECT, PRIOR TO CONTINUING WITH THAT PORTION OF WORK. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY OF THEIR TRENCHES OR EXCAVATIONS THAT SETTLE. 4.ALL NURSERY STOCK SHALL BE WELL BRANCHED, HEALTHY, FULL, PRE-INOCULATED AND FERTILIZED. DECIDUOUS TREES SHALL BE FREE OF FRESH SCARS. TRUNKS WILL BE WRAPPED IF NECESSARY TO PREVENT SUN SCALD AND INSECT DAMAGE. THE LANDSCAPE CONTRACTOR SHALL REMOVE THE WRAP AT THE PROPER TIME AS A PART OF THIS CONTRACT. 5.ALL NURSERY STOCK SHALL BE GUARANTEED, BY THE CONTRACTOR, FOR ONE YEAR FROM DATE OF FINAL INSPECTION. 6.PLANTING AREA SOIL SHALL BE TOPSOIL FOR ALL TREE, SHRUB, ORNAMENTAL GRASS, PERENNIAL, AND ANNUAL BEDS. AMENDED SOIL SHALL BE PROVIDED AND GRADED BY THE GENERAL CONTRACTOR UP TO A 6" DEPTH BELOW FINISHED GRADE IN TURF AREAS AND A 12" DEPTH IN PLANTING AREAS. 7.PLANTING AREA TOPSOIL SHALL BE AMENDED WITH 25% SPHAGNUM PEATMOSS, 5% HUMUS AND 65% PULVERIZED SOIL. AMENDED TURF AREA SOIL SHALL BE STANDARD TOPSOIL. TOPSOIL SHALL CONFORM TO TECHNICAL SPECIFICATIONS FREE OF HEAVY CLAY, ROCKS, AND DIRT CLODS OVER 1 INCH IN DIAMETER, AS WELL AS CONTAIN 3%-5% OF ORGANIC MATTER. 8.SEED/SOD LIMIT LINES ARE APPROXIMATE. CONTRACTOR SHALL SEED/SOD ALL AREAS WHICH ARE DISTURBED BY GRADING WITH THE SPECIFIED SEED/SOD MIXES. 9.CONTRACTOR SHALL STAKE INDIVIDUAL TREE AND SHRUB LOCATIONS AND OUTLINE HERBACEOUS PLANTING AREAS, SHALL ADJUST LOCATIONS WHEN REQUESTED, AND SHALL OBTAIN PROJECT LANDSCAPE ARCHITECT'S ACCEPTANCE PRIOR TO PLANTING. . 10.ALL PLANT ID TAGS SHALL BE REMOVED AFTER INSTALLATION. 11.CONTRACTOR SHALL INSTALL STONE MULCH AT A 3" DEPTH TO ALL TREES, SHRUB, PERENNIAL, AND GROUNDCOVER AREAS. TREES PLACED IN AREA COVERED BY TURF SHALL RECEIVE A 4 FT WIDE MAXIMUM TREE RING WITH 3" DEPTH STONE MULCH. A SPADED BED EDGE SHALL SEPARATE MULCH BEDS FROM TURF OR SEEDED AREAS. A SPADED EDGE IS NOT REQUIRED ALONG CURBED EDGES. 12.WEED FABRIC SHALL BE REQUIRED UNDER MULCH. 13.MULCH SHALL NOT BE HELD IN PLACE BY PLASTIC NET, OR SPRAYING OF ANY BINDER MATERIAL OR ASPHALT EMULSION. 14.DO NOT DISTURB THE EXISTING PAVING, LIGHTING, OR LANDSCAPING THAT EXISTS ADJACENT TO THE SITE UNLESS OTHERWISE NOTED ON PLAN. 15.PLANT QUANTITIES SHOWN ARE FOR THE CONVENIENCE OF THE OWNER AND JURISDICTIONAL REVIEW AGENCIES. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL PLANT QUANTITIES AS DRAWN. 16.THE OWNER'S REPRESENTATIVE MAY REJECT ANY PLANT MATERIALS THAT ARE DISEASED, DEFORMED, OR OTHERWISE NOT EXHIBITING SUPERIOR QUALITY. 17.WEEDING, LANDSCAPE MAINTENANCE, AND WATERING TO BE THE CONTRACTOR'S RESPONSIBILITY DURING CONSTRUCTION. ALL PLANT MATERIALS REQUIRED BY THIS SECTION SHALL BE MAINTAINED AS LIVING VEGETATION AND SHALL BE PROMPTLY REPLACED BY LANDSCAPE CONTRACTOR DURING WARRANTY PERIOD IF THE PLANT MATERIAL HAS DIED PRIOR TO FINAL ACCEPTANCE. PLANTING AREAS SHALL BE KEPT FREE OF TRASH, LITTER, AND WEEDS AT ALL TIMES. 18.THE CONTINUED MAINTENANCE OF ALL REQUIRED LANDSCAPING AFTER WARRANTY PERIOD EXPIRES SHALL BE THE RESPONSIBILITY OF THE OWNER OF THE PROPERTY ON WHICH SAID MATERIALS ARE REQUIRED.NTS SHRUB PLANTING2 1.APPLY CORRECTIVE PRUNING. 2.SET ROOT BALL OR CONTAINER ON UNEXCAVATED OR TAMPED SOIL. TOP OF ROOTBALL (CONTAINER) SHALL BE ONE INCH ABOVE SURROUNDING GRADE. FOR LARGER SHRUBS WITHIN PLANTING BED DIG A DEEPER PIT ONLY FOR THOSE SHRUBS. 3.REMOVE BURLAP FROM TOP HALF THE LENGTH OF ROOTBALL. TWINE AND (IF USED) SYNTHETIC MATERIAL SHALL BE REMOVED FROM PLANTING BED. FOR CONTAINER GROWN SHRUBS, REMOVE CONTAINER AND LOOSEN ROOTS PRIOR TO INSTALLATION. 4.REMOVE OR CORRECT GIRDLING ROOTS. 5.PLUMB AND BACKFILL WITH AMENDED SOIL PER LANDSCAPE NOTES. WATER THOROUGHLY WITHIN TWO HOURS. 6.APPLY MULCH IN EVEN LAYER, KEEPING AWAY FROM ROOT FLARE. MULCH LIMITS FOR SHRUBS EXTEND TO ALL LIMITS OF PLANTING BED, SEE PLANS FOR BED LAYOUTS. NOTES: SHREDDED HARDWOOD MULCH AMENDED SOIL SUBGRADE MINIMUM 6" BEYOND ROOT BALL SPADED BED EDGE NTS PERENNIAL PLANTING3 SECTION PLAN VIEW O.C. SPACING, SEE PLANS FOR DETAILS HARDWOOD SHREDDED MULCH AMENDED SOIL SUBGRADE SPADED BED EDGE 1.EXCAVATE PLANTING BED. 2.BED HEIGHT IS TO BE 2" ABOVE FINISH GRADE AND WELL DRAINED. 3.REMOVE CONTAINER, SCORE SOIL MASS TO REDIRECT AND PREVENT CIRCLING ROOTS. CORRECT GIRDLING ROOTS. 2.PLANT MATERIAL SHALL BE LAID OUT BY FOLLOWING THE BED EDGE, WORKING TOWARDS THE CENTER OF THE BED USING TRIANGULAR (STAGGERED) SPACING AS PLAUSIBLE. 3.PLUMB AND BACKFILL WITH PLANTING MIX AS SPECIFIED IN LANDSCAPE NOTES. 4.APPLY MULCH IN EVEN LAYER, KEEPING AWAY FROM ROOT FLARE. MULCH LIMITS FOR PERENNIALS/GROUNDCOVER EXTEND TO ALL LIMITS OF PLANTING BED, SEE PLANS FOR BED LAYOUTS. 5.SPACING TO BE AS SPECIFIED IN THE PLANT LIST. PERENNIALS SHALL BE PLACED WITH THEIR CENTER 24" FROM EDGE OF BED. NOTES: NTS TREE PLANTING 1 1.INSPECT TREE FOR DAMAGED BRANCHES, APPLY CORRECTIVE PRUNING. 2.IF LANDSCAPE PLANTINGS ARE WITHIN OR ADJACENT TO AREAS WHERE LIME STABILIZATION OCCURS, CONTRACTOR SHALL FULLY REMOVE SOIL CONTAINING LIME STABILIZATION AND REPLACE WITH HIGH QUALITY PLANTING SOIL. 3.SET ROOT BALL ON UNEXCAVATED OR TAMPED SOIL. TOP OF ROOTBALL SHALL BE TWO INCHES ABOVE SURROUNDING GRADE WITH BURLAP AND WIRE BASKET INTACT. 4.REMOVE WIRE BASKET AND BURLAP DOWN FOUR TO SIX INCHES BELOW TOP OF ROOT BALL. REMOVE ALL TWINE AND (IF USED), SYNTHETIC MATERIAL. REMOVE OR CORRECT GIRDLING ROOTS. 5.TAMP EXCAVATED SOIL AROUND BASE OF ROOTBALL. 6.BACKFILL REMAINDER EXCAVATED SOIL TAMPED LIGHTLY. HIGH CLAY OR POOR SOIL SHALL RECEIVE SOIL AMENDMENT PER LANDSCAPE NOTES. 7.WATER THOROUGHLY WITHIN TWO HOURS USING 10 TO 15 GALLONS OF WATER. 8.APPLY MULCH IN EVEN LAYER, KEEPING AWAY FROM ROOT FLARE. 9.FINAL LOCATION OF TREE TO BE APPROVED BY OWNER. NOTES: 2X ROOTBALL WIDTH SHREDDED HARDWOOD MULCH EXCAVATED BACKFILL SUBGRADE TAMPED BACKFILL SPADE EDGE 1/18/2024 Daren Mindham