HomeMy WebLinkAboutErosion Control PlanSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF
SFSFSFSFSF SF SF SF SF SF
SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF
SFSFSFSFSFSFSFSFSFSFSFSFSFSF SFSFCBCBCBCBCBCBCBCBCBSIX POINTS ROAD
40' HALF R/W
SheetProject No.DescriptionNo.Date
Professional Seal & SignatureLandWorx Engineering, LLC958 East Washington StreetSuite 100Indianapolis, Indiana 46202317.616.0177Client Name & AddressScale:Date:Checked By:Drawn By:LANDWORXSheetSIX POINTS ROAD
13280 SIX POINTS ROAD00/00/0000LW-00387BROWNING DAY626 N ILLINOIS ST----INDIANAPOLIS, IN 46204(317) 635-5030BROWNINGDAY.COMCARMEL, IN 46032JRSWHOC400PRE CONSTRUCTION ERSOION CONTROL PLANREROSION CONTROL NOTES:1.ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDSAND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS,WHICHEVER HAS JURISDICTION.2.LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING REGRADING, SHALLBE DONE IN A WAY THAT WILL MINIMIZE EROSION.3.THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKEALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE.ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMEDNECESSARY BY ON-SITE INSPECTION.4.SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL PRACTICES AS NEEDEDTO MINIMIZE SEDIMENTATION IN THE RECEIVING STREAM. NO STORM WATER SHALL BEDISCHARGED FROM THE SITE IN A MANNER THAT CAUSES EROSION AT THE POINT OFDISCHARGE.5.WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROMTHE SITE BY STORMWATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSEDBUILDING MATERIALS IS REQUIRED.6.SEDIMENT BEING TRACKED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE MINIMIZED.CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING WITH WATER.CLEARED SEDIMENT SHALL BE RETURNED TO THE SITE FOR DISPOSAL.7.SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL BECOLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND AT LEASTONCE A WEEK.8.IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER ORNIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC.9.ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION AREA SHALLBE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT ALLOWED ON-SITE.10.SCHEDULE OF EARTHWORK ACTIVITIES:THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO APRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED SOON AS POSSIBLE. TEMPORARYVEGETATION OR MULCHING SHALL BE USED TO PROTECT EXPOSED AREAS IF PERMANENTVEGETATION CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY CEASES FOR MORE THAN21 DAYS OR AS DIRECTED BY THE ENGINEER.TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO OCTOBER 31. STOCKPILETOPSOIL AT ALL OTHER TIME OF THE YEAR. PERMANENT AND FINAL VEGETATION ANDSTRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYSAFTER FINAL GRADING OR AS SOON AS POSSIBLE.11.INFORM ALL GENERAL CONTRACTORS, CONSTRUCTION MANAGEMENT FIRMS, GRADING OREXCAVATING CONTRACTORS, AND ALL OTHER CONTRACTORS WITH PRIMARY OVERSIGHT ONINDIVIDUAL BUILDING LOTS OF THE TERMS AND CONDITIONS OF THE STORM WATER RULE 5,AND THE CONDITIONS AND STANDARDS OF THIS EROSION CONTROL PLAN, SCHEDULE FORIMPLEMENTATION, AND THE CONSTRUCTION SITE EROSION CONTROL PLAN REPORT.12.ALL PROPOSED EROSION AND SEDIMENT CONTROL SHALL BE IN CONFORMANCE WITH CHAPTER 600OF THE CITY OF INDIANAPOLIS STORMWATER SPECIFICATIONS MANUAL, LATEST EDITION.DISCREPANCIES BETWEEN THE PLANS AND THE MANUAL SHALL NOT ALLEVIATE THE CONTRACTORFROM ADHERING TO THE REQUIREMENTS AS SET FORTH IN THE MANUAL.13.ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MAY BE REQUIRED BY THE INSPECTOR.( IN FEET )1 inch = ft.0NORTH30153030DESCRIPTION & CALL SYMBOL:CONSTRUCTION ENTRANCEEROSION CONTROL LEGEND:DETAIL #/SH. #SILT FENCEDETAIL 02/C410SF//EROSION CONTROL MATPROPOSED RIPRAPDETAIL 01/C410DETAIL 03-05/C410DETAIL 07-08/C410SFRPEMCECONSTRUCTION STAGING AREASACONCRETE WASHOUT AREAWODETAIL 06/C410CONSTRUCTION BOUNDARYPERMANENT SEEDINGPSCBPROPERTY AREA: ±3.98DISTURBED AREA: ±3.93OFFSITE DISTURBED AREA: ±00TOTAL DISTURBED AREA: ±3.93DESIGN DEVELOPMENT
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
WWGPSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF
SF SF SFBIO-RETENTION SEEDINGPSPSPSPSPSPSPSPSPSCEWOSAEMSFSFSFSFSFSFSFPSRPRPRPRPEMCBCBCBCBCBCBCBCBCBSFPROPOSED BUILDINGPROPOSED BUILDINGSIX POINTS ROAD
40' HALF R/W
SheetProject No.DescriptionNo.Date
Professional Seal & SignatureLandWorx Engineering, LLC958 East Washington StreetSuite 100Indianapolis, Indiana 46202317.616.0177Client Name & AddressScale:Date:Checked By:Drawn By:LANDWORXSheetSIX POINTS ROAD
13280 SIX POINTS ROAD00/00/0000LW-00387BROWNING DAY626 N ILLINOIS ST----INDIANAPOLIS, IN 46204(317) 635-5030BROWNINGDAY.COMCARMEL, IN 46032JRSWHOC401CONSTRUCTION EROSION CONTROL PLANREROSION CONTROL NOTES:1.ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDSAND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS,WHICHEVER HAS JURISDICTION.2.LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING REGRADING, SHALLBE DONE IN A WAY THAT WILL MINIMIZE EROSION.3.THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKEALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE.ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMEDNECESSARY BY ON-SITE INSPECTION.4.SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL PRACTICES AS NEEDEDTO MINIMIZE SEDIMENTATION IN THE RECEIVING STREAM. NO STORM WATER SHALL BEDISCHARGED FROM THE SITE IN A MANNER THAT CAUSES EROSION AT THE POINT OFDISCHARGE.5.WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROMTHE SITE BY STORMWATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSEDBUILDING MATERIALS IS REQUIRED.6.SEDIMENT BEING TRACKED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE MINIMIZED.CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING WITH WATER.CLEARED SEDIMENT SHALL BE RETURNED TO THE SITE FOR DISPOSAL.7.SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL BECOLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND AT LEASTONCE A WEEK.8.IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER ORNIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC.9.ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION AREA SHALLBE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT ALLOWED ON-SITE.10.SCHEDULE OF EARTHWORK ACTIVITIES:THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO APRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED SOON AS POSSIBLE. TEMPORARYVEGETATION OR MULCHING SHALL BE USED TO PROTECT EXPOSED AREAS IF PERMANENTVEGETATION CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY CEASES FOR MORE THAN21 DAYS OR AS DIRECTED BY THE ENGINEER.TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO OCTOBER 31. STOCKPILETOPSOIL AT ALL OTHER TIME OF THE YEAR. PERMANENT AND FINAL VEGETATION ANDSTRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYSAFTER FINAL GRADING OR AS SOON AS POSSIBLE.11.INFORM ALL GENERAL CONTRACTORS, CONSTRUCTION MANAGEMENT FIRMS, GRADING OREXCAVATING CONTRACTORS, AND ALL OTHER CONTRACTORS WITH PRIMARY OVERSIGHT ONINDIVIDUAL BUILDING LOTS OF THE TERMS AND CONDITIONS OF THE STORM WATER RULE 5,AND THE CONDITIONS AND STANDARDS OF THIS EROSION CONTROL PLAN, SCHEDULE FORIMPLEMENTATION, AND THE CONSTRUCTION SITE EROSION CONTROL PLAN REPORT.12.ALL PROPOSED EROSION AND SEDIMENT CONTROL SHALL BE IN CONFORMANCE WITH CHAPTER 600OF THE CITY OF INDIANAPOLIS STORMWATER SPECIFICATIONS MANUAL, LATEST EDITION.DISCREPANCIES BETWEEN THE PLANS AND THE MANUAL SHALL NOT ALLEVIATE THE CONTRACTORFROM ADHERING TO THE REQUIREMENTS AS SET FORTH IN THE MANUAL.13.ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MAY BE REQUIRED BY THE INSPECTOR.DESCRIPTION & CALL SYMBOL:CONSTRUCTION ENTRANCEEROSION CONTROL LEGEND:DETAIL #/SH. #SILT FENCEDETAIL 02/C410SF//EROSION CONTROL MATPROPOSED RIPRAPDETAIL 01/C410DETAIL 03-05/C410DETAIL 07-08/C410SFRPEMCECONSTRUCTION STAGING AREASACONCRETE WASHOUT AREAWODETAIL 06/C410CONSTRUCTION BOUNDARYPERMANENT SEEDINGPSPROPERTY AREA: ±3.98DISTURBED AREA: ±3.93OFFSITE DISTURBED AREA: ±00TOTAL DISTURBED AREA: ±3.93( IN FEET )1 inch = ft.0NORTH30153030CBDESIGN DEVELOPMENT