HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report
Project Name: PZ-2023-00279 SP - Nathan Hawkins Addition Lot 4 split
Workflow Started: 11/28/2023 11:20:09 AM
Report Generated: 01/29/2024 09:06 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 Engineering
Alex Jordan
12/4/23 9:49 AM
Comment
Once all items requested on ProjectDox task "PZ-2023-00228 PP Amend
Nathan Hawkins Addition Lot 4 split" are provided, we will issue our approval
of the secondary plat.
Info Only
2 1 Planning & Zoning
Angie Conn
12/11/23 3:48 PM
Library Comment
Please provide copies of your correspondence with the TAC members and
their correspondence with you.
Responsed by: Fred Krawczyk - 1/5/24 10:49 AM
DONE
Resolved
3 1 Planning & Zoning
Angie Conn
12/11/23 3:48 PM
Library Comment
Please the township, section, and range numbers just below the Secondary
Plat title.
Resolved
4 1 Planning & Zoning
Angie Conn
12/11/23 3:48 PM
Library Comment
Please add Plan Commission Secondary Plat Docket No. PZ-2023-00279 SP
to the plat.
Resolved
6 1 Planning & Zoning
Angie Conn
12/11/23 3:48 PM
Library Comment
If possible, please add the Deed of Dedication Certificate paragraph to the
secondary plat. That language can be found on page 6 of the Secondary Plat
application online:
https://www.carmel.in.gov/home/showpublisheddocument/
18779/638157072785600000
Resolved
REVIEW COMMENTS
Plan Review - Review Comments Report
Project Name: PZ-2023-00279 SP - Nathan Hawkins Addition Lot 4 split
Workflow Started: 11/28/2023 11:20:09 AM
Report Generated: 01/29/2024 09:06 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
7 1 Planning & Zoning
Angie Conn
12/11/23 3:48 PM
Library Comment
After all comments are addressed, then please work with Caleb Warner in the
City Engineering Dept. to get on a BPW (Board of Public Works) meeting
agenda, which has a filing deadline. His number is 571-2441, and his email
address is cwarner@carmel.in.gov
Responsed by: Fred Krawczyk - 1/26/24 2:22 PM
ref Secondary Plat APPROVED - RECORDED
----------------------------------------------------------
Reviewer Response: Angie Conn - 1/17/24 2:47 PM
BPW approval is also required for the final sign off of
the secondary replat. i heard that your plat item will be
on the Jan. 24, 2024 BPW meeting agenda.
----------------------------------------------------------
Responsed by: Fred Krawczyk - 1/5/24 10:49 AM
Warner, Caleb
Thu, Dec 21, 2023, 9:54?AM
to me, Angelina, Alexia
Fred,
The curb cut request was approved yesterday.
Resolved
8 1 Planning & Zoning
Angie Conn
12/11/23 3:48 PM
Library Comment
Staff has been advised that we cannot present a Secondary Plat to the
Director for signature from this point forward until Ms. Terry Krueskamp
(tkrueskamp@carmel.in.gov) in Information Systems has received an e-mail
with an electronic file attached (MicroStation .dgn is preferred, or AutoCad
.dwg of the subdivision) and it (the e-mail) has been copied to myself
(aconn@carmel.in.gov), OR please upload a .dgn or .dwg file of the proposed
plat.
Resolved
9 1 Planning & Zoning
Angie Conn
12/11/23 3:48 PM
Library Comment
Please submit a revised Secondary Plat after making above-mentioned
changes. Once these changes have been made and comments addressed,
please produce a Mylar copy (with the surveyors and land owners signatures)
for signature by this Department. 1 digital copy of the plat must be provided
with the Mylar copy, prior to recording, and then 1 paper copy and 1
electronic copy of the scanned, recorded plat must be submitted following
recording of the document. Our approval of the secondary plat (signature)
will be forthcoming upon revision of the plans according to the items listed
above.
Responsed by: Fred Krawczyk - 1/5/24 10:48 AM
Secondary Plat will have "BLANK" signature blocks, city
officials to write in names / titles and final digital copy
will be updated accordingly
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00279 SP - Nathan Hawkins Addition Lot 4 split
Workflow Started: 11/28/2023 11:20:09 AM
Report Generated: 01/29/2024 09:06 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
10 1 Planning & Zoning
Angie Conn
12/11/23 3:48 PM
Library Comment
Lastly, please submit a .pdf or .jpg file of the scanned, recorded plat.
Responsed by: Fred Krawczyk - 1/26/24 2:22 PM
ref Secondary Plat APPROVED - RECORDED
----------------------------------------------------------
Responsed by: Fred Krawczyk - 1/17/24 12:06 PM
will provide a copy after we receive the City of Carmel
signed secondary plat, slated to be signed off on Jan 24
2024
Resolved
11 1 Planning & Zoning
Angie Conn
12/11/23 3:48 PM
Library Comment
Please note that the $403.50 filing fee is still due.
Resolved
12 1 Planning & Zoning
Angie Conn
12/11/23 4:00 PM
Comment
Please update the BPW names on the Board of Public Works signature block.
You can contact the Mayor's Office or the Clerk of the City Office to find out
the names for 2024: https://www.carmel.in.gov/government
Responsed by: Fred Krawczyk - 1/26/24 2:22 PM
ref Secondary Plat APPROVED - RECORDED
----------------------------------------------------------
Reviewer Response: Angie Conn - 1/22/24 5:03 PM
Please double check and make sure that Sue
Wolfgang's name is removed from the BPW signature
block on the plat.
----------------------------------------------------------
Responsed by: Fred Krawczyk - 1/5/24 10:47 AM
Secondary Plat will have "BLANK" signature blocks, city
officials to write in names / titles and final digital copy
will be updated accordingly
----------------------------------------------------------
Reviewer Response: Angie Conn - 12/21/23 10:36 AM
The new City Clerk as of 2024 will be Jacob Quinn, and
not Sue Wolfgang.
Resolved
13 1 Vectren Energy
Chad Miller
12/18/23 2:46 PM
Comment
No comments on plat split.
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2023-00279 SP - Nathan Hawkins Addition Lot 4 split
Workflow Started: 11/28/2023 11:20:09 AM
Report Generated: 01/29/2024 09:06 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
14 1 Transportation
Systems
David Littlejohn
12/22/23 10:14 AM
Changemark
ADA compliant ramps crosswalks at curb cuts
Please ensure that all of the curb cuts will comply with ADA standards so that
the sidewalk provides an accessible route along the south side of 2nd St NW.
BPW curb cut attachment.pdf Responsed by: Fred Krawczyk - 1/5/24 10:43 AM
Carol Applegate: Yes, all curb cuts will be ADA
compliant
Littlejohn, David W
Jan 4, 2024, 4:40?PM (18 hours ago)
to Carol, me, Angelina
For that comment you can respond by stating that all of
the curb cuts will comply with ADA standards.
Let me know if you need anything else.
David Littlejohn, AICP
Transportation Systems Administrator/ADA Coordinator
City of Carmel
O: (317) 571-2306
M: (317) 750-2959
Resolved
15 2 Engineering
Alex Jordan
1/22/24 9:20 AM
Changemark
Jacob Quinn is now Clerk of the City, please revise
B411952nd plat 12-21-23.pdf Responsed by: Fred Krawczyk - 1/26/24 2:21 PM
ref Secondary Plat APPROVED - RECORDED
Resolved
16 2 Engineering
Alex Jordan
1/22/24 9:22 AM
Comment
We will need the contribution for the detention and pedestrian facilities
made following revisions and approval of the secondary plat.
Info Only