Loading...
HomeMy WebLinkAboutSWPP PlanI CP I sue, 01 _ oH_ •per, OH�oH_ M.E. 767.47 n rn1 -nz m � I M n 9� O O cn 1 � 1 S (!1 2 M I o� tp rn 0c a� s N •sue cv � _21 M 00, 0 s � so rno sus rno s ss DAY DRIVE s � � SS SS ---:---SS 3��SS �S SS - ss Aso - -ss �rSS �0 SS SZ69 s ��SS (o SS SS U� SS SS ��s�SS 6, x6, x x -N TBM #601 CUT SQUARE IN LP BASE ELEV:768.76 DAY DRIVE I - S 7,'-"-SS SS ---� SS SS -� 0 � � o �$S SS SS$ SS $$ 0SS J 77 0 oIS X x � o 0 .� s& s - SS SS SS� o �o 1-770- 0 -CONSTRUCTION LIMITS=1,435 S.F. M.E. 767.39 M.E. 767.63 I IcP 6 cp cA c9 /F 6 off-oH-oH=0H10"' Ho-HO�pd o-Ho 0-r��Ho-HO o-Ho �7p6o c 6'� 9 6'� 6'� °�� "`�LIMITS=504�S.F. LIMITS s� W ppr� d' �1 p 9 767.95jPS S i9 3zX Sc xx �� d'Y �� / �� cp II" v' `Ss �p 767.45 M.E. �p v'- i9� x sawcu 76 30 rn CSAWCUT 6'6� 5 x6 LANDING s s �� 06� / �. x `r 6' d� 6' 6,\ LIMITS cP i� m d . �� j x 6� Q 6'� e e o / s rn (MAX. SLOPE 2.0%) so 6cP 6'cP '�''p� s� rn� x N ;.. r.X• 767.45 op o \ - 6'� 7s7.7s •,..: 5 x5 LANDING �. o a 6' rn o�' M.E. 767.26 .•:•.�:%�: C•;.;:I. cp010 767.30 / (MAX. SLOPE 2.0%) 0 6' ,d(zo cS' 37 770.44 M, cp p 6' o I x x x 37 TOTAL DISTURBED -768- o, 5 WIDE A.D.A. 0C o �'' r, 0 ° o cP o 0 6 6' �% 767.67 768.02 M.E. &. 61 $ �> s� s ss o . HANDICAP RAMP AREA 0.11 ACRES �- ' �'`� �'� x 6' 6' 6, M.E. 767.00 M.E. 766. 6' 6' x o 0 �p ® / 0 767.76 HANDRAILS (1/12 cP cp cP Q' cP �` /WL , I"I'1 rn x x x rn= I �'' 5 x5 LANDING o 7s8.o3 soo r'r, os j s o�, oo d' �� x ' ` FLUSH WITH 767.90 M E - p`s p6' 6'6, SAWCUT d.06, �cP o p 60r' of _ - LIMIl�i=Ijb1l SF.�s .l 'ti {f�� 'fvf y�f f `I ``` F/4� '�F'i t - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ _ .. . �I ® • _ _.1►� •' s.;{ ; f • �� O .1 I11 •• • T: • • • • c • • • • ^tea • • al • • • w�c .cam I' - a �r - - m 0 x f / 6�M.E. F.F.E. = 770.0± SITE -1.97±ACRES �S o s o �, PAVEMENT CONC. ° � dsLOPE 2.0% o LIMITS � z 0 (MAX.( ) .. -� o .I (SOUTH)(1.80± GARAGEFLOOR �;� U, o� o� p � ACRES LESS EX. R/W) �, x j ys p 00 DI x ELEV = 768.2± NORTH x x I r 0 0 : EXISTING BUILDING (NORTH) ��x��� BLS x I I'Tl I C p� per. 6' 6' 00, I 0� o I �,� ���, 15,265 S.F. (FOOTPRINT) ��sx 15 �s I CONSTRUCTION $ INSTALL SILT SOCK j I x6'� PS 1"a ' 768.31 M.E. 6' Ls s INLET PROTECTION (TYPICAL FOR LIMITS=1,445 S.F. 768.1t � ���, x 3?' OVER PAVEMENT _�, D m ALL EXISTING INLETS ADJACENT 767.9, Epp �,y5 x �� �, r m c5 y 'W6 ° . \ 6' pWxs x s p x r I - TO CONSTRUCTION SITE) s $ ° _ •.' ' '. x' - a' �' �� I x GARAGE LS ��,� :� c5 aX, 768.00 X 6' 6'� O s J PS 767.50 M.E. pp�6� o d' - - .0 6' o x x 6'. �z p s cS S 9 0 i �o \ �' N RAMP Ill) MAX FLOOR d Arno s - /w1 r' rn 6' m 2 ��� �o'� CONCRETE WASHOUT, & 76737 ��' ) CONSTRUCTION low pEs �,LS I y D I \ PORT-O-LET LOCATION s s s x s S 767.36 ELEV = 768.0± �. j LIMITS=124 S.Fs js JL x TOP -OF -CURB S 767.36 M.E. 6+ %f� x / 4 r s ELEVATION = 765.94 x x x 767.74 M.E. x x: cS �p /Wy pj 6' I x 6, �p pj �'cS 6'� 6'� 6'� 767.86 (EAST) 6 �. 15 6' cP �� op y 6' 9 V-S 6, cp cp �j I 6 66, x o /c9 6 767,36 ST STM STMf� STM ST STM- STM- ST S 'STM ST STM- S �M ST ST ST&- STM ST T STM-STM-STM- -STM- ST TF1 STM 6' Q 6' 6� X i9 t, 6' � 6 J 6'� 6'�6'� cn x 1 ; rn p 768.1 1 - ■ p 0 0 1'f 1 ` rn '�' 7 6CONSTRUCTION SAWCUT ■ o s rn� 0 767- x s x �s rn LIMITS-301 S.F. IMITS o 0 s sjo jsj X� r'�� ° �j� �s 6'00s \ 61 9 °� e I cf '�9 ' �'I 6 CP \6' cn I a. ° 1� x U) 6' Q�7 c5 cn 6' 6' j tTi - x 6' x x .. .' a .' Jam' x x x x �� x� x ,7 \ ��� 6- 6' ss 6' 6'� ' 9�' 6's )7 6' 9� C9 O S dy J S S p� S- j ASS SS 81 �`S'6�? \S `� MATCH EXIS NG 6'd' ! o\ pp 7.88 j ASPHALT GR DES 767.30 M.E. x x �$x 6' 06 (501, 6' 6, 61 61 . o ��c.r' � � 6 j 6' 6' 6' 6'6, s6, 6,6, ` TEMPORARY CONSTRUCTION ENTRANCE _ TEMPORARY CONSTRUCTION ENTRANCE �� ss (CONSTRUCTION TRAFFIC OVER EXISTING ASPHALT) INSTALL SILT SOCK (CONSTRUCTION TRAFFIC OVER EXISTING ASPHALT) _I o OVER PAVEMENT CONTRACTOR RESPONSIBLE TO KEEP ASPHALT�i TBM #600 CONTRACTOR RESPONSIBLE TO KEEP ASPHALT�� FREE OF DUST/DEBRIS/MUD AT ALL TIMES W. BOLT ON HYDRANT LEGEND: FREE OF DUST/DEBRIS/MUD AT ALL TIMES I ELEV:768.61 NORTH 20 0 10 20 ( IN FEET ) 1 inch = 20 ft. DEVELOPMENT SUMMARY TOTAL SITE AREA = 1.80 ACRES +/- TOTAL DISTURBED AREA = 0.11 ACRES +/- GENERAL NOTES SURROUNDING THE SITE "BROOM CLEAN" AND FREE OF SOIL OR AGGREGATE THAT MIGHT BE BROUGHT OFF -SITE. EROSION CONTROL NOTES 1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION. 2. LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION. 3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON -SITE INSPECTION. 4. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE. 5. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROM THE SITE BY STORMWATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED. 6. SEDIMENT BEING TRACED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE SITE FOR DISPOSAL. 7. SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL BE COLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND AT LEAST ONCE A WEEK. 8. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 9. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT ALLOWED ON -SITE. 10. SCHEDULE OF EARTHWORK ACTIVITIES: a) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY CEASES FOR MORE THAN 21 DAYS OR AS DIRECTED BY THE ENGINEER. b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIME OF THE YEAR. PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER FINAL GRADING OR AS SOON AS POSSIBLE. -- PROPERTY BOUNDARY RIGHT-OF-WAY LINE SAWCUT LIMITS - - - - - - - - - 847---- EXISTING CONTOUR CONSTRUCTION LIMITS/ DISTURBED AREA SS S S S S SILT SOCK - Typical in all paved areas where sediment can migrate. SF SF SF SF SF PROPOSED SILT FENCE -Typical in all areas where sediment could leave the site. PS Permanent Seeding / Ground Cover - Typical after final grading is completed. NOTE: STABILIZATION OF INACTIVE, UNVEGETATED AREAS MUST BE INITIATED BY THE END OF THE 7th DAY OF INACTIVITY AND COMPLETED WITHIN 14 DAYS AFTER INITIATION. Inlet Protection - "Flexstorm" inlet protection ❑ typical for all paved area inlets AFTER pavement is installed; Silt Fence cage & "Flexstorm" inlet protection BEFORE pavement is installed. PROPOSED CONCRETE PROPOSED PAINTED DIAGONAL STRIPED ISLAND STANDARD DUTY ASPHALT PAVEMENT PATCH (SEE DETAIL SHEET C10.0) EXISTING FIRE HYDRANT r EXISTING LIGHT POLE DRAINAGE FLOW ARROW 799.23 TOP OF CURB GRADE 798.73 PAVEMENT GRADE 798.25 PAVEMENT OR EARTH GRADE M.E. MATCH EXISTING GRADE Ex. EXISTING GRADE EROSION CONTROL CONTACT. GIBSON COMMERCIAL CONSTRUCTION P.O. BOX 717 NEW PAELSTINE, INDIANA 46163 ATTN: TODD MELLISH (765) 376-4166 THERE SHALL BE NO DIRT, DEBRIS, OR STORAGE OF MATERIAL IN THE STREET ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR x 6'\ SOILS DESCRIPTIONS & LIMITATIONS 1. Miami Silt Loam (UkbA, Ukb2 & YmsA - 100% Site) The Miami series consists of moderately well drained soils formed in as much as 18 inches of loess or silty material and in the underlying loamy till on till plains. They are very deep soils that are moderately deep to dense till. Permeability is moderate or moderately slow in the solum, and slow or very slow in the underlying dense till. Slope ranges from 0 to 60 percent. Subject soil does not present any foreseeable limitations to the proposed development. GENERAL NOTES 1. CONTRACTOR TO SCHEDULE A PRE -CONSTRUCTION MEETING WITH THE HAMILTON COUNTY SURVEYOR'S OFFICE (317-776-8495) PRIOR TO COMMENCING WITH CONSTRUCTION. 2. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. 3. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE O.S.H.A. STANDARDS FOR WORKER SAFETY. 4. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS. 5. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL EXISTING ELEVATIONS BEFORE CONSTRUCTION BEGINS. T U 0 - z CY) k,0 0 o�� 1� Q ca a W 5 ro N CD 1 C o O r�^ Lo 00 V UJ fu O w 00 co � V M� W � v 0111111111 P G L G N •�G\STE)�*- Stiff i = No PE10403858 = o STATE OF .0O.c '1.410 DATE: 11 /09/23 DWN BY: EAG CHKD. BY: EAG SCALE: 1 = 20 DATE: 11 /01 /23 V L O 0 w W wN w W � I•-�-I O�� a � - � �wW � O Qom a OcU O w O � O t� V 1 PROJECT NUMBER GCC.004 DRAWING NUMBER C3mO SHEET 5 OF 10