HomeMy WebLinkAbout07010152 Sewer
.,
.:'"'
CLAY TOWNSHIP REGIONAL WASTE DISTRICT
SANITARY SEWER PERMIT
[ ] Conditional Permit [x] Final Permit
INDIVIDUAL lOTS/EXISTING BUilDINGS
Project Title:
primary
LocatiDn:
Coxhall Park & Garden north lot restroom facility
Owner/Builder:
Lot#
HamiltDn Co Parks Dept
Street address: 116'" & Towne Rd
City: Carmel
Zip: 46032
County: Hamilton
Interceptor Charges Paid: PRI:. EDU Fee:paid ApplicatiDn fee: paid //3. DO <7~NV'
.792 cd / fJ/'<{ , '!P I~
PLEASE NOTE: Installation of building sewer shall be per the specifications of the Clay Towns ip
RegiDnal Waste District (see reverse) and any cDnditions noted below. All installations shall be inspected by District
personnel during "Dpen trench" phase and befDre backfilling with stone to six inches abDve the pipe. NO footing or
fDundation.rlrains. or other sources of ground or stDrmwater, shall be permitted to enter the District's sanitary sewer
system. The District will assume no Iiabilitv for drains which are below the arade level of the nearest
downstream manhole nor for laterals which are extended beneath drivewavs or sidewalks. The permit hDlder
(property o\mer, developer or builder) will be responsible for damages to the District's sewer system. This includes
damages to manholes, castings, manhole lids and the like; caused by construction activity on the building site which
is the subject of this permit.
InspectiDns by the District are MANDATORY and shall be arranged by contacting the District's office at 844-9200
.24 hDurs in advance. All new construction will be placed on billing six months after connection has been made or
when water is connected, whichever comes first.
Y(;l I/~he District reserves the right to inspect all sump pump connections to ensure no illegal
.I \ connections have been made.
. /
Vii.t (have received a copy of Ordinance No. 9-13-99 and agree to follow all District standards. Building
.,----
,/ has a [ ] crawl space [x ] slab or [ ] basement that [ ]will be finished with grinder pump installed to
. comply with elevation requirements [ ]rough-in plumbing with arinder pump installed during construction,
[ ] rough-in plumbing only and arinder pump will not be installed during construction, [ ] no plumbing in
the basement. (Please check appropriate box.)
f'/, I
/![A'V Manholes shall remain accessible at all times. If a manhole is buried, it shall be the
/ builder/homeowner responsibility to correct per District standards.
_Conditional Permit Terms:
[ ] NO CONNECTION to the sewer until further notification.
[ ] Certificate Df Insurance must be on file with CTRWD listed as certificate hDlder.
[ ] 48 hours notice befDre work starts on manhDle CDre drilling or cuts of active lines
and District inspector must inspect all work before covered.
[ ] All District fees will be paid in full.
[ ] Approval pending Districts review of plans.
[ ] CD pies of approved permits from appropriate county or city agencies for work in
the right-of-way road cuts or are required.
[ J No occupancy until further notification
[ ]
All CDnditions have been met and final permit issued
2006.
By signing below, I attest that I am familiar with the District's specifications and agree to accept respDnsibility fDr all
work done under this permit.
'~5:;"""'--7;/2 Lo::{/~//
tB i1der~Owner Signature .
. '2::ncCl ~\jc11t.er iilgC&l'l
rinted Name
Chris Wiseman, Cripe 842-6777
Phone
fa, f-\ctYl1l \toV\ Co, Parb'
Permit issued this 4th day of January, 2007.
~ 2 site plans submitted
Permif is valid fo
&: AR from the date issued.
Please note chanaes on lateral specification as of Januarv 2006. .
Permit valid only with CTRWD seal in red ink.
Candy J. Feltner
DirectDr of Administration & Customer Service
sv
Permit-rev.05-0S-06cf
.'
CLAY TOWNSHIP REGIONAL WASTE DISTRICT
SUMMARY OF LATERAL INSTALLATION REQUIREMENTS
1. All houses, buildings, etc., shall connect to the District's sanitary sewer system within 90 days of notice providing a sewer is within 300 feet
for Hamilton County or 100 feet for Boone County of the property line. Only one building may connect to the sewer main per lateral unless
otherwise approved by the District.
2. No foundation or other storm water drains shall be interconnected to the sewer lateral installed and connected to the District's sanitary
sewer.
3~ The existing Sewer line from the building to the septic tank may only be used if it is located under a building addition, patio, porch or paved
-driveway. Air test is required to show if acceptable for re.use: The property owner shall bear the cost of all testing. The District inspector
must be onsite for the duration of the air test.
4. The owner or contractor shall notify the District prior to covering the installed lateral so that the District can make an inspection to determine
compliance with the District's sewer use ordinance. Such notification shall be made 24 hours prior to the need for the inspection. If the
inspection fails and a second inspection is required, or contractor is not on site for scheduled inspection, or fails to cancel inspection, an
additional fee of $100.00 will be due. This must be paid prior to the time of the follow up inspection.
5. Property owners are hereby advised that the County Board of Health regulates the operation and maintenance of private sewage disposal
(septic) systems. The County Ordinance provides in part that, upon connection to a public sewer, a septic tank "...shall be abandoned and
filled with-earthen material in a safe and sanitary manner: Please contact the appropriate County Board of Health fCj further information.
. 6. Acceptable Pipe Materials:
PVC PIPE: SDR 35, ASTM D-3034, SIX INCH PIPE
PVC PIPE: SDR 21, ASTM D-241 , SIX INCH PIPE
GASKETS JOINTS ASTM D 3212
GASKETS ASTM F-477
FITTINGS - SDR-26
DUCTILE IRON MECHANICAL COUPLING WITH PROPER FITTINGS.
CLEAN OUTS TO BE LOCATED THREE FEET WITHIN THE FOUNDATION AND NO MORE THAN
100 FEET APART.
7. Bedding:
Use Number 8 crushed stone or Number 8 fractured face aggregate
Fill material is to be placed from 6 inches betow to 6 inches above the pipe
The trench should be a minimum of 18 inches wide
8. laterals shall be installed no closer than 20 feet from water wells unless PVC pressure grade pipe is used meeting SDR 21 and ASTM 0-
2241. Any proposed installation 'requiring pressure pipe shall be reviewed and accepted by the District and the District's engineer Drior to
installation.
9. Where a transition is made between SDR 35 pipe and pressure grade SDR 21 pipe, a ductile iron gasketed mechanical coupling shall be
used.
10. laterals shall terminate within 3 feet of the building unless the conditions in item #3 above are met. No clued cice shall be Installed outside
of buildina foundation walls.
11. Additional Information on District standards and specifications may be obtained from the District's office during business hours of 8:00a.m.
to 4:30 p.m. Monday through Friday: All District standards can be located on our web site at htto:ll'NWW.ctlWd.om/. I
Clay Township Regional Waste District
10701 North College Suite A.
Indianapolis, Indiana 46280
Phone: 844-9200 Fax: 844-9203
12. Septic effluent shall not be pumped out into the sanitary sewer system.
13. The District shall insoect ALL laterals. Please call the District office at 844.9200 24 hours prior to time of inspection
14. Contractors shalllav 14 aauae.solld wire the entire lenoth of the lateral. Wire is to be placed on top of the lateral. The District
inspector will verify placement of the wire. After inspection, bedding is to be placed on top.
15. Call before you dig. IUPPS 1~800-382-5544, 48 hours prior to digging...
lateral-rev.01-13-06cf