HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report
Project Name: PZ-2023-00174 ADLS Amend-Sign Muse at the Corner Sign Package
Workflow Started: 7/28/2023 11:04:11 AM
Report Generated: 02/12/2024 01:18 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 Sign Permits
Aliza Shalit
8/10/23 3:14 PM
Changemark
Spandrel width vs Sign width
UDO sign standards require blade sign depth to be 85% of the spandrel
width. In this case spandrel width is the same as the sign depth. Developer
was asked to consider moving the blade sign to to the other side of the
windows.
03-BLDG A • EAST ELEV-A1.pdf Responsed by: Ken Woods - 8/14/23 10:02 AM
The depth of this sign type "A" has been reduced to 15".
Resolved
2 1 Sign Permits
Aliza Shalit
8/10/23 3:18 PM
Changemark
Parking sign height
Please confirm height from ground to bottom of sign will be a minimum of
8'. Include these signs and measurements in drawings and elevations.
05 -BLDG A • SOUTH ELEV-A4.pdf Resolved
3 1 Sign Permits
Aliza Shalit
8/10/23 3:27 PM
Changemark
Wall sign size
Maximum allowed height is 70% of spandrel panel height. Please reduce.
Maximum sign height should be 35.35".
09-BLDG A • NORTHEAST CORNER
RETAIN WALL-C.pdf
Responsed by: Ken Woods - 8/14/23 10:12 AM
The Height of this sign has been reduced to 35"h.
Resolved
4 1 Sign Permits
Aliza Shalit
8/10/23 3:28 PM
Changemark
Maximum Sign height
Maximum allowed height is 70% of spandrel panel height. Please reduce.
Maximum sign height should be 35.35".
10-BLDG A • NORTHEAST CORNER
RETAIN WALL-C.pdf
Responsed by: Ken Woods - 8/14/23 10:12 AM
The height of this sign has been reduced to 35"h.
Resolved
5 1 Sign Permits
Aliza Shalit
8/10/23 3:30 PM
Changemark
update drawing
Something uploaded wrong here. Can you please re-upload this?
14-BLDG A • WEST ELEV - RESIDENT
ENTER-E.pdf
Responsed by: Ken Woods - 8/14/23 3:39 PM
New File Uploaded
Resolved
6 1 Sign Permits
Aliza Shalit
8/10/23 3:35 PM
Changemark
Narrow vertical wall sign
This has not been specified. What kind of sign is this being proposed as? Is it
necessary if the same thing will be on the center wall panels?
17-PAINTED GRAPHIC • WEST ELEV
BLDG. A-H1.pdf
Responsed by: Ken Woods - 8/14/23 3:39 PM
3rd Graphic in Question removed
Resolved
7 1 Sign Permits
Aliza Shalit
8/10/23 3:40 PM
Changemark
Upload failed
upload failed, please re-upload clean graphic
19-PASEO WALL PARKING-I1 & 2.pdf Responsed by: Ken Woods - 8/14/23 3:40 PM
New File Uploaded
Resolved
8 1 Sign Permits
Aliza Shalit
8/10/23 3:40 PM
Changemark
Parking "P" placement
Please move the P to alight with "THE CORNER", vertically centered with it.
Where they are, they are not visually anchored to anything and it cuts
through the architectural detail.
19-PASEO WALL PARKING-I1 & 2.pdf Responsed by: Ken Woods - 8/14/23 3:42 PM
Parking "P" Pucks raised above raised architectural
element
Resolved
9 1 Sign Permits
Aliza Shalit
8/10/23 3:41 PM
Changemark
upload error
Please update drawing. There seems to have been an upload error.
20-BLDG A • PARTIAL EAST & SOUTH
ELEV-F1 & 2.pdf
Responsed by: Ken Woods - 8/14/23 3:42 PM
New File Uploaded
Resolved
REVIEW COMMENTS
Plan Review - Review Comments Report
Project Name: PZ-2023-00174 ADLS Amend-Sign Muse at the Corner Sign Package
Workflow Started: 7/28/2023 11:04:11 AM
Report Generated: 02/12/2024 01:18 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
10 1 Sign Permits
Aliza Shalit
8/10/23 3:46 PM
Changemark
sign placement
Sign placement seems awkward. It overlaps multiple textures of the
architectural detail. Is there a better drawing of how this will look? Is there a
better way/placement for installation?
22-PARKING GARAGE ENTER WALL
SIGN - ELEV-J.pdf
Responsed by: Ken Woods - 12/16/23 12:14 PM
Changes have been made to elevation for the sign to
not overlap multiple textures of architectural detail.
----------------------------------------------------------
Reviewer Response: Aliza Shalit - 11/2/23 11:15 AM
Why can't the sign go right inside the frame of the
entrance above the clearance sign filling the whole
horizontal space. It looks awkward as proposed. An
email was sent explaining this with graphics. There is no
reason for this placement.
----------------------------------------------------------
Responsed by: Ken Woods - 10/26/23 3:22 PM
new file uploaded
----------------------------------------------------------
Reviewer Response: Aliza Shalit - 8/23/23 11:53 AM
If the clearance bar is that low, there is no reason to not
be able to put the entrance signs right above that,
making sure the sign does not overlap any architectural
elements (see my rendering below) and extending it so
it goes side to side fully.
----------------------------------------------------------
Responsed by: Ken Woods - 8/14/23 3:43 PM
Art Installation on garage will be raised 15" to allow
flush mounting of sign that is 13"h.
Resolved
11 1 Sign Permits
Aliza Shalit
8/10/23 3:46 PM
Changemark
Clearance bars
Please include clearance bars per Public Parking Sign Standards
requirements (Page 7). See Correspondence folder.
22-PARKING GARAGE ENTER WALL
SIGN - ELEV-J.pdf
Responsed by: Ken Woods - 10/26/23 3:22 PM
new file uploaded
----------------------------------------------------------
Reviewer Response: Aliza Shalit - 8/23/23 11:53 AM
Please make sure the clearance bars adhere to the
Parking sign standards.
----------------------------------------------------------
Responsed by: Ken Woods - 8/14/23 3:45 PM
sign type added #21.5
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00174 ADLS Amend-Sign Muse at the Corner Sign Package
Workflow Started: 7/28/2023 11:04:11 AM
Report Generated: 02/12/2024 01:18 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
12 1 Sign Permits
Aliza Shalit
8/10/23 3:50 PM
Changemark
wall plaques
Will all these just say The Corner. If so, there is no need to have 14 of these
signs, it's over branding. Please remove.
23-RETAIL ENTRY FLANK WALL
PLAQUE -L.pdf
Reviewer Response: Aliza Shalit - 11/2/23 10:45 AM
----------------------------------------------------------
Responsed by: Ken Woods - 10/26/23 3:22 PM
new file uploaded
----------------------------------------------------------
Reviewer Response: Aliza Shalit - 9/6/23 3:32 PM
There is no need to over brand the building. This seems
like too much if all it will say is The Corner between ever
window bay.
----------------------------------------------------------
Responsed by: Ken Woods - 8/14/23 3:47 PM
Per our phone conversation we discussed these. These
are ok as long as they are attractive and these are under
the S.F. Allowed. Thesedo not require permits.
Resolved
13 1 Sign Permits
Aliza Shalit
8/10/23 3:57 PM
Changemark
Sign L
Please remove sign L
25-Muse at The Corner-SITE PLAN-
SIGN LOCATIONS-QUANTITIES.pdf
Responsed by: Ken Woods - 8/14/23 3:47 PM
New file Uploaded
Resolved
14 1 Sign Permits
Aliza Shalit
8/10/23 3:58 PM
Changemark
Legend
Please add mounting and lighting info to each category.
25-Muse at The Corner-SITE PLAN-
SIGN LOCATIONS-QUANTITIES.pdf
Responsed by: Ken Woods - 8/15/23 1:40 PM
Mounting and Lighting Details have been added.
Resolved
15 1 Sign Permits
Aliza Shalit
8/10/23 4:00 PM
Comment
Please upload Elevations with proposed tenant sign locations and
lighting/mounting requirements. Specify sign type (wall, canopy, projection,
secondary projection) and color code each differently. Include spandrel panel
dimensions.
Responsed by: Ken Woods - 12/16/23 12:26 PM
See revised elevations with tenant locations and sign
types color coded.
----------------------------------------------------------
Responsed by: Ken Woods - 10/26/23 3:22 PM
new file uploaded
----------------------------------------------------------
Responsed by: Ken Woods - 8/15/23 2:15 PM
I am generating these drawings currently and will
submit as soon as possible.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00174 ADLS Amend-Sign Muse at the Corner Sign Package
Workflow Started: 7/28/2023 11:04:11 AM
Report Generated: 02/12/2024 01:18 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
16 1 Sign Permits
Aliza Shalit
8/10/23 4:01 PM
Comment
All signs require a separate and individual sign permit application and review
process once this is approved.
Info Only
17 1 Sign Permits
Aliza Shalit
8/10/23 4:02 PM
Comment
Retail tenant signage specs requirements have not been uploaded and
should be part of the sign package being reviewed.
Responsed by: Ken Woods - 10/26/23 3:22 PM
new file uploaded
----------------------------------------------------------
Responsed by: Ken Woods - 8/15/23 2:10 PM
I am generating these drawings currently and will
submit as soon as possible.
Resolved
18 3 Sign Permits
Aliza Shalit
9/6/23 12:46 PM
Changemark
Mural
Please contact CRC for more direction on mural artwork and planning.
18-PAINTED GRAPHIC • WEST ELEV
BLDG. A-H2.pdf
Responsed by: Ken Woods - 10/26/23 3:22 PM
new file uploaded
Resolved
19 3 Sign Permits
Aliza Shalit
9/6/23 12:47 PM
Changemark
Mural artwork
Please contact CRC for more direction on mural artwork and planning.
17-PAINTED GRAPHIC • WEST ELEV
BLDG. A-H1.pdf
Responsed by: Ken Woods - 10/26/23 3:22 PM
new file uploaded
Resolved
20 3 Sign Permits
Aliza Shalit
9/6/23 3:12 PM
Changemark
Sign
Please change text to read "Public Parking Garage"
19-PASEO WALL PARKING-I1 & I2.pdf Responsed by: Ken Woods - 10/26/23 3:22 PM
new file uploaded
Resolved
21 3 Sign Permits
Aliza Shalit
9/6/23 3:14 PM
Changemark
Sign
Please change text to read "Public Parking Garage"
19-PASEO WALL PARKING-I1 & 2.pdf Responsed by: Ken Woods - 10/26/23 3:22 PM
new file uploaded
Resolved
22 3 Sign Permits
Aliza Shalit
9/6/23 3:14 PM
Changemark
Parking P location
Please update location of parking P to match other sign. P should be
centered with the top line "The Corner" so it is not sitting over the
architectural detail and it is balanced with the weight of the top line type.
19-PASEO WALL PARKING-I1 & 2.pdf Responsed by: Ken Woods - 10/26/23 3:22 PM
new file uploaded
Resolved
23 3 Carmel
Redevelopment
Commission
Larysa Glaspie
9/19/23 1:43 PM
Changemark
Changemark note #01
These murals are not allowed as proposed. If you want to come back and
propose an artistic mural, CRC is happy to consider.
17-PAINTED GRAPHIC • WEST ELEV -
BLDG. A-H1 .pdf
Responsed by: Ken Woods - 10/26/23 2:58 PM
Removed from scope of project
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00174 ADLS Amend-Sign Muse at the Corner Sign Package
Workflow Started: 7/28/2023 11:04:11 AM
Report Generated: 02/12/2024 01:18 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
24 3 Carmel
Redevelopment
Commission
Larysa Glaspie
9/19/23 1:45 PM
Changemark
Changemark note #01
This mural is not allowed as proposed and must be removed from building. If
you want to come back and propose an artistic mural, CRC is happy to
consider.
18-PAINTED GRAPHIC • WEST ELEV
BLDG. A-H2.pdf
Responsed by: Ken Woods - 10/26/23 2:59 PM
Removed from scope of project
Resolved
25 3 Carmel
Redevelopment
Commission
Larysa Glaspie
9/19/23 1:45 PM
Changemark
Changemark note #01
Revise to "Public Parking Garage"
19-PASEO WALL PARKING-I1 & 2.pdf Responsed by: Ken Woods - 10/26/23 3:21 PM
new file uploaded
Resolved
26 3 Carmel
Redevelopment
Commission
Larysa Glaspie
9/19/23 1:46 PM
Changemark
Changemark note #01
Revise to "Public Parking Garage"
19-PASEO WALL PARKING-I1 & I2.pdf Responsed by: Ken Woods - 10/26/23 3:21 PM
new file uploaded
Resolved
27 3 Carmel
Redevelopment
Commission
Larysa Glaspie
9/19/23 1:50 PM
Changemark
Changemark note #01
These murals are not allowed as proposed. If you want to come back and
propose an artistic mural, CRC is happy to consider.
17-PAINTED GRAPHIC • WEST ELEV
BLDG. A-H1.pdf
Responsed by: Ken Woods - 10/26/23 2:59 PM
Removed from scope of project
Resolved
28 3 Carmel
Redevelopment
Commission
Larysa Glaspie
9/19/23 1:53 PM
Changemark
Changemark note #01
These signs are now allowed.
23-RETAIL ENTRY FLANK WALL
PLAQUE -L.pdf
Responsed by: Ken Woods - 10/26/23 3:21 PM
new file uploaded
Resolved
29 3 Carmel
Redevelopment
Commission
Larysa Glaspie
9/19/23 1:54 PM
Changemark
Changemark note #01
These signs are not allowed.
25-Muse at The Corner-SITE PLAN-
SIGN LOCATIONS-QUANTITIES.pdf
Responsed by: Ken Woods - 10/26/23 3:21 PM
new file uploaded
Resolved
30 3 Carmel
Redevelopment
Commission
Larysa Glaspie
9/19/23 1:57 PM
Comment
Any proposed mural, art, painted sign, etc. needs to receive approval from
the CRC.
Info Only
31 3 Carmel
Redevelopment
Commission
Larysa Glaspie
9/19/23 2:02 PM
Changemark
Changemark note #01
Entrance's must have clearance bars
22-PARKING GARAGE ENTER WALL
SIGN - ELEV-J.pdf
Responsed by: Ken Woods - 10/26/23 3:21 PM
new file uploaded
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00174 ADLS Amend-Sign Muse at the Corner Sign Package
Workflow Started: 7/28/2023 11:04:11 AM
Report Generated: 02/12/2024 01:18 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
32 3 Sign Permits
Aliza Shalit
9/21/23 8:28 AM
Changemark
Please Remove
This mural is not allowed as proposed and must be removed from building. If
you want to come back and propose an artistic mural, CRC is happy to
consider.
17-PAINTED GRAPHIC • WEST ELEV -
BLDG. A-H1 .pdf
Responsed by: Ken Woods - 10/26/23 3:22 PM
new file uploaded
Resolved
33 3 Sign Permits
Aliza Shalit
9/21/23 8:28 AM
Changemark
Please Remove
This mural is not allowed as proposed and must be removed from building. If
you want to come back and propose an artistic mural, CRC is happy to
consider.
17-PAINTED GRAPHIC • WEST ELEV
BLDG. A-H1.pdf
Responsed by: Ken Woods - 10/26/23 3:22 PM
new file uploaded
Resolved
34 3 Sign Permits
Aliza Shalit
9/21/23 8:36 AM
Changemark
Please remove
This mural is not allowed as proposed and must be removed from building. If
you want to come back and propose an artistic mural, CRC is happy to
consider.
18-PAINTED GRAPHIC • WEST ELEV
BLDG. A-H2.pdf
Responsed by: Ken Woods - 10/26/23 3:22 PM
new file uploaded
Resolved
35 3 Sign Permits
Aliza Shalit
9/21/23 8:41 AM
Changemark
Clearance Bars
Please add clearance bars to both entrances per Public Parking Sign
Standards guide. Waiting for engineering to determine appropriate
clearance height.
20-PARTIAL EAST & SOUTH ELEV - I1 &
I2.pdf
Responsed by: Ken Woods - 12/16/23 12:29 PM
No plans for clearance bars at the paseo entrances
----------------------------------------------------------
Reviewer Response: Aliza Shalit - 11/2/23 11:43 AM
new file does not have the clearance bars, please add.
----------------------------------------------------------
Responsed by: Ken Woods - 10/26/23 3:23 PM
new file uploaded
Resolved
36 3 Sign Permits
Aliza Shalit
9/21/23 8:57 AM
Changemark
Clearance bar width
Should clearance bar span the full width of the entrance space?
22-PKG GARAGE ENTER WALL SIGN -
CLEARANCE BARS ELEV-J& K.pdf
Responsed by: Ken Woods - 12/16/23 12:59 PM
Not typically.
----------------------------------------------------------
Responsed by: Ken Woods - 10/26/23 3:23 PM
no
Resolved
37 3 Sign Permits
Aliza Shalit
9/21/23 8:58 AM
Changemark
Remove from plans
This sign type is not allowed. Please remove ALL.
23-RETAIL ENTRY FLANK WALL
PLAQUE -L.pdf
Responsed by: Ken Woods - 10/26/23 3:18 PM
Remove from scope of project
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00174 ADLS Amend-Sign Muse at the Corner Sign Package
Workflow Started: 7/28/2023 11:04:11 AM
Report Generated: 02/12/2024 01:18 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
38 3 Sign Permits
Aliza Shalit
9/21/23 8:58 AM
Changemark
Sign Type L
Please remove from plans.
25-Muse at The Corner-SITE PLAN-
SIGN LOCATIONS-QUANTITIES.pdf
Responsed by: Ken Woods - 10/26/23 3:23 PM
new file uploaded
Resolved
39 3 Sign Permits
Aliza Shalit
9/21/23 8:59 AM
Changemark
Sign Type L
Sign type not allowed. Please remove.
25-SITE PLAN LOCATIONS-
QUANTITIES.pdf
Responsed by: Ken Woods - 10/26/23 3:23 PM
new file uploaded
Resolved
40 3 Sign Permits
Aliza Shalit
9/21/23 9:13 AM
Changemark
Clearance Bar
Please see text layout requirements for clearance bar in Public Parking Sign
Design Standard Guide. Clearance height text should be on both sides of the
word clearance.
21.5-PARKING GARAGE CLEARANCE
BARS - K.pdf
Responsed by: Ken Woods - 10/26/23 3:23 PM
new file uploaded
Resolved
41 3 Sign Permits
Aliza Shalit
9/21/23 9:39 AM
Comment
I know many of the changes have already been made in newer emailed
submissions, but they have not been uploaded to the system so they cannot
be reviewed at this time. Please upload all corrections addressing the review
comments to clear unresolved issues.
Info Only
42 4 Carmel
Redevelopment
Commission
Larysa Glaspie
10/30/23 2:45 PM
Changemark
Removed from scope of project.
This painted graphic is to be removed from the scope of project, as noted on
the next page.
17-PAINTED GRAPHIC • WEST ELEV -
BLDG. A-H1 .pdf
Info Only
43 4 Carmel
Redevelopment
Commission
Larysa Glaspie
10/30/23 2:48 PM
Changemark
Public Parking Garage
This sign has been updated to say 'Public Parking Garage' see previous
sheet.
19-PASEO WALL PARKING-I1 & 2.pdf Info Only
44 4 Carmel
Redevelopment
Commission
Larysa Glaspie
10/30/23 2:50 PM
Changemark
Public Parking Garage
This sign has been updated to say 'Public Parking Garage' see previous
sheet.
19-PASEO WALL PARKING-I1 & I2.pdf Info Only
45 4 Carmel
Redevelopment
Commission
Larysa Glaspie
10/30/23 2:51 PM
Changemark
Public Parking Garage
This sign has been updated to say 'Public Parking Garage' see previous
sheet.
20-PARTIAL EAST & SOUTH ELEV - I1 &
I2.pdf
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2023-00174 ADLS Amend-Sign Muse at the Corner Sign Package
Workflow Started: 7/28/2023 11:04:11 AM
Report Generated: 02/12/2024 01:18 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
46 4 Carmel
Redevelopment
Commission
Larysa Glaspie
10/30/23 2:57 PM
Changemark
Signs L have been removed
Signs 'L' have been removed from the scope of this project. See previous
sheet,
25-SITE PLAN LOCATIONS-
QUANTITIES.pdf
Info Only
47 4 Carmel
Redevelopment
Commission
Larysa Glaspie
10/30/23 3:43 PM
Comment
Pending DOCS approval.
Info Only
48 4 Carmel
Redevelopment
Commission
Larysa Glaspie
10/30/23 3:44 PM
Changemark
Work with DOCS on this sign
Please continue to work with DOCS on this sign.
29-TMB-Tenant Space Blade-North
ELEV BLDG.A-TMB.pdf
Coordinator Response: Aliza Shalit - 1/18/24 9:33 AM
Sign not allowed. This is not a spandrel panel. Either add
a canopy sign for this tenant space OR remove sign and
space only gets the secondary projection sign.
----------------------------------------------------------
Responsed by: Ken Woods - 1/15/24 11:00 AM
We have changed the plans to include TW wall sign and
or TB blade sign
----------------------------------------------------------
Responsed by: Ken Woods - 12/16/23 12:08 PM
We have changed the plans to include a wall sign
and/or TB projecting blade sign.
Resolved
49 4 Carmel
Redevelopment
Commission
Larysa Glaspie
10/31/23 11:27 AM
Comment
Painted murals need to be removed from the building.
Coordinator Response: Aliza Shalit - 1/17/24 3:38 PM
Please provide photo of removed mural when available.
----------------------------------------------------------
Responsed by: Ken Woods - 1/15/24 11:12 AM
Mural to be removed.
----------------------------------------------------------
Responsed by: Ken Woods - 12/16/23 12:09 PM
Mural to be removed.
Info Only
50 4 Sign Permits
Aliza Shalit
11/2/23 12:06 PM
Changemark
Painted Wall Signs
Please remove H & H2 signs from site plan and legend. These are no longer
part of the project.
25-Muse at The Corner-SITE PLAN-
SIGN LOCATIONS-QUANTITIES.pdf
Responsed by: Ken Woods - 12/16/23 11:48 AM
H & H2 Signs have been removed
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00174 ADLS Amend-Sign Muse at the Corner Sign Package
Workflow Started: 7/28/2023 11:04:11 AM
Report Generated: 02/12/2024 01:18 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
51 4 Sign Permits
Aliza Shalit
11/2/23 1:05 PM
Changemark
Wall section
This side/section view is not for a wall sign. Please update drawing with the
correct view.
28-Tenant Space Wall-TW.pdf Responsed by: Ken Woods - 12/16/23 12:31 PM
See revised drawings showing side view for a wall sign.
Resolved
52 4 Sign Permits
Aliza Shalit
11/2/23 1:10 PM
Changemark
Canopy sign requirements
Maximum sign size included is not appropriate for canopy signs. Please
update to say maximum width: 90% of canopy width if 14ft or less 70% of
canopy width if more than 14ft. Maximum height 2ft. Maximum area 70sf
26-Tenant Space Canopy-TC.pdf Responsed by: Ken Woods - 12/16/23 12:31 PM
See revised drawings for canopies.
Resolved
53 4 Sign Permits
Aliza Shalit
11/3/23 1:31 PM
Changemark
Blade sign
Please remove blade sign and replace with either canopy sign or sign over
transom window.
29-TMB-Tenant Space Blade-North
ELEV BLDG.A-TMB.pdf
Responsed by: Ken Woods - 12/16/23 12:33 PM
See revised drawings showing a wall sign and TB tenant
projecting blade signs as options for this one-off unique
store front.
Resolved
54 5 Sign Permits
Aliza Shalit
12/18/23 9:00 AM
Changemark
Note in red
Do you mean "Where Canopies are NOT existing"?
28-Tenant Space Wall-TW.pdf Coordinator Response: Aliza Shalit - 1/17/24 3:39 PM
Please update to correct wording on the schematic.
----------------------------------------------------------
Responsed by: Ken Woods - 1/12/24 9:09 AM
Yes. That is correct.
Resolved
55 5 Sign Permits
Aliza Shalit
12/18/23 9:13 AM
Changemark
Commercial tenant sign locations
Please include markers and legend item for commercial tenant sign locations
(some new ones have been added in the details).
25-Muse at The Corner-SITE PLAN-
SIGN LOCATIONS-QUANTITIES.pdf
Responsed by: Ken Woods - 1/12/24 10:42 AM
Commercial tenant sign locations have been added to
the site plan.
Resolved